L-2007-130, Preparation and Scheduling of Operator Licensing Examinations

From kanterella
Jump to navigation Jump to search
Preparation and Scheduling of Operator Licensing Examinations
ML073110204
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/19/2007
From: Jefferson W
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2007-130, RIS-07-017
Download: ML073110204 (2)


Text

00CT 19 200-7 L-2007-130 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 Re:

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 NRC Regulatory Issue Summary 2007-17 Preparation and Scheduling of Operator Licensing Examinations As requested by NRC Regulatory Issue Summary 2007-17, "Preparation and Scheduling of Operator Licensing Examinations," issued July 12, 2007, enclosed is the Operator Licensing Examination data, NRC Form 536, for Turkey Point Nuclear Plant.

Should there be any questions, please contact James Conder at (305) 246-6895.

William Jefj#son,,4L Vice President K

Turkey Point Nuclear Plant Enclosure SM cc:

Regional Administrator, Region 1I, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant

~Cf~O3 an FPL Group company

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.

OLNuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Turkey Point Nuclear Plant

  • Including

,Information for two classes in 2009 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2008 CY 2009 CY 2009

.CY 2010)

ESTIMATED NUMBER OF LICENSEE-PREPARED 0

0 1

1

  • EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2008 CY2009 CY2009 CY2010 NUMBER OF REACTOR 0

5 8

8 OPERATORS NUMBER OF SENIOR REACTOR 0

14 9

8 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 04/13/2009 08/24/2009 01/10/2011 ALTERNATE DATE C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2008 CY 2009 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 21 21 CANDIDATES NRC FORM 536 (8-2005)

PRINTED ON RECYCLED PAPER