FPL MAR 1 0 2003 L-2003-066 EA-03-09(IV)(F)(2)

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Order (EA-03-009) Relaxation Request Withdrawal On February 11, 2003 the NRC issued Order (EA-03-009) requiring specific inspections of the reactor pressure vessel head and associated penetration nozzles at pressurized water reactors.

Pursuant to the procedure specified in Section IV, paragraph F of the Order, by letter L-2003-045, and supplemented by L-2003-052, Florida Power & Light (FPL) FPL requested relaxation to implement an alternative to the requirements specified in Section IV, paragraph C.(1)(b)(i) or Section IV, paragraph C.(1)(b)(ii) for Turkey Point Unit 3 and Unit 4 for the Reactor Vessel Level Monitoring System (RVLMS) Penetrations # 59 and

  1. 60.

Per th-itelephone conversatio-n-betwe-en your Mr. Allen-Howe and our Mr. Walter Parker, on March 7, 2003, FPL hereby confirms the withdrawal of the above referenced order relaxation request.

If you have any questions, please contact Walter Parker at (305) 246-6632.

Very truly yo W~illiamn J eff nJr r Vice President Turkey Point Plant cc:

Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Florida Department of Health and Rehabilitative Services an FPL Group company