L-2003-032, 2002 Annual Operating Report

From kanterella
(Redirected from L-2003-032)
Jump to navigation Jump to search
2002 Annual Operating Report
ML030630628
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 02/24/2003
From: Jernigan D
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2003-032
Download: ML030630628 (4)


Text

0 Florida Power & Light Company, 6351 S. Ocean Drive, Jensen Beach, FL 34957 FPL February 24, 2003 L-2003-032 10 CFR 50.36 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:

St. Lucie Units I and 2 Docket Nos. 50-335 and 50-389 2002 Annual Operating Report Pursuant to Technical Specification 6.9.1.4, this letter transmits the 2002 Annual Operating Report for St. Lucie Units 1 and 2. The report covers activities on a calendar year basis for both units.

Section 1 Man-Rem Report required by Technical Specification 6.9.1.5 Section 2 Primary Chemistry information required by Technical Specification 6.9.1.5 Please, b tact us should there be any questions regarding this information.

Ve tr

yours, Donald E.

an Vice President St. Lucie Plant DEJ/spt Attachments an FPL Group company

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 L-2003-032 SECTION 1 TECHNICAL SPECIFICATION 6.9.1.5 ST. LUCIE UNITS 1 AND 2 2002 MAN-REM REPORT

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 L-2003-032 Florida Power & Light Company St. Lucie Plant - 2002 Standard Format For Reporting Number Of Personnel & Man-Rem For Work And Job Functions Work And Job Function Reactor Operations and Surveillance Maintenance & Construction Operations Health Physics Supervisory Engineering Routine Maintenance Maintenance & Construction Operations Health Physics Supervisory Engineering Inservice Inspection Maintenance & Construction Operations Health Physics Supervisory Engineering Number of Personnel > 100 mrem Total Man Rem Station Utility Contract Station Utility 4

30 17 1 38 3

5 0

2 3

0 0

0 1

0 1

3 0

0 3

1 0

0 1

0 0

0 0

1 6

0 43 0

0 142 1

5 0

0 113 2

6 1

1 002.160 000.057 007.273 000.598 004.660 000.614 000.152 000.011 000.546 000.550 012.411 001.787 000.827 000.215 001.925 000.105 000.074 000.000 000.562 000.211 000.891 000.181 000.296 000.094 000.038 000.015 000.000 000.000 000.540 000.342 Special Maintenance (Unit I Reactor Containment Building Instrument Air Penetration Mods.)

Maintenance & Construction 0

0 2

000.026 000.015 Operations 0

0 0

000.000 000.000 Health Physics 0

0 0

000.019 000.000 Supervisory 0

0 0

000.000 000.000 Engineering 0

0 0

000 002 000.004 Waste Processing Maintenance & Construction Operations Health Physics Supervisory Engineering Refueling Maintenance & Construction Operations Health Physics Supervisory Engineering Totals Maintenance & Construction Operations Health Physics Supervisory Engineering 0

0 4

0 0

5 5

1 0

1 50 38 27 1

5 0

0 0

0 0

2 2

0 0

0 5

4 3

0 2

2 0

3 0

0 34 1

1 0

0 299 4

58 1

1 000308 000.000 000.148 000.000 001.126 000.000 000.000 000.000 000 000 000.000 001.434 001.245 001.509 000.499 000.213 000.011 000003 000.000 000.523 000.077 017.230 003.285 010053 001.406 007.981 000.745 000229 000.011 002.173 001.184 Contract 003.163 000.210 012.197 000.033 000.004 038.532 000.209 001.517 000.002 000.003 044.115 000.704 002.128 000.328 000.171 001.018 000.000 000.000 000.000 000.000 000.324 000.000 000.523 000.000 000.000 016.036 000.745 000.414 000.000 000.005 103.188 001.868 016.779 000.363 000.183 363 037.666 006.631 122.381 Grand Totals 121 14

St. Lucie Units I and 2 Docket Nos. 50-335 and 50-389 L-2003-032 SECTION 2 TECHNICAL SPECIFICATION 6.9.1.5 AND 3.4.8 CHEMISTRY RESULTS In accordance with Technical Specification 6.9.1.5, the primary coolant specific activity did not exceed the limits of Technical Specification 3.4.8 during 2002.