Category:Letter type:L
MONTHYEARL-24-038, License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References2024-09-17017 September 2024 License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References L-24-015, Twenty-Ninth Refueling Outage Inservice Inspection Summary Report2024-09-17017 September 2024 Twenty-Ninth Refueling Outage Inservice Inspection Summary Report L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 L-24-199, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-08-22022 August 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule L-24-182, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-23023 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-161, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-19019 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-014, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models2024-07-16016 July 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models L-24-164, BV-2, Post Accident Monitor Report2024-06-27027 June 2024 BV-2, Post Accident Monitor Report L-24-094, Reactor Vessel Surveillance Capsule Withdrawal Schedule2024-06-24024 June 2024 Reactor Vessel Surveillance Capsule Withdrawal Schedule L-24-152, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-06-17017 June 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations L-24-021, Cycle 30 Core Operating Limits Report2024-05-23023 May 2024 Cycle 30 Core Operating Limits Report L-24-121, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-05-23023 May 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-107, CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair2024-05-13013 May 2024 CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair L-23-269, Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions2024-05-0707 May 2024 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions L-24-054, Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological)2024-04-29029 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological) L-24-089, Emergency Preparedness Plan2024-04-23023 April 2024 Emergency Preparedness Plan L-24-088, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 20242024-04-22022 April 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 2024 L-24-082, Withdrawal of Exemption Request2024-04-0303 April 2024 Withdrawal of Exemption Request L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage L-24-064, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152024-03-13013 March 2024 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee L-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-198, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0707 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation L-23-241, Submittal of the Updated Final Safety Analysis Report, Revision 272023-11-29029 November 2023 Submittal of the Updated Final Safety Analysis Report, Revision 27 L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports2023-11-29029 November 2023 Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 L-23-208, Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA00256152023-09-14014 September 2023 Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA0025615 L-23-167, Twenty-Third Refueling Outage Inservice Inspection Summary Report2023-09-13013 September 2023 Twenty-Third Refueling Outage Inservice Inspection Summary Report L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-179, Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-07-18018 July 2023 Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA0025615 L-23-165, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-06-26026 June 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-139, Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report2023-06-13013 June 2023 Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-137, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-05-18018 May 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-125, Cycle 24 Core Operating Limits Report2023-05-17017 May 2023 Cycle 24 Core Operating Limits Report L-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-129, Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations2023-05-0505 May 2023 Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations L-23-115, Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological2023-04-27027 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological L-23-126, Discharge Monitoring Report (Npdes), Permit No. PA00256152023-04-22022 April 2023 Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-053, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-04-14014 April 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-058, 180-Day Steam Generator Tube Inspection Report2023-03-27027 March 2023 180-Day Steam Generator Tube Inspection Report L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage L-23-036, Report of Facility Changes, Tests and Experiments2023-03-13013 March 2023 Report of Facility Changes, Tests and Experiments L-23-086, Response to Request for Additional Information for Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair2023-03-0404 March 2023 Response to Request for Additional Information for Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair 2024-09-17
[Table view] Category:Report
MONTHYEARL-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-22-154, Pressure and Temperature Limits Report Revision2022-07-0606 July 2022 Pressure and Temperature Limits Report Revision L-22-054, Steam Generator Inspection Report- Fall 2021 Refueling Outage2022-02-10010 February 2022 Steam Generator Inspection Report- Fall 2021 Refueling Outage IR 05000334/20210052021-09-0101 September 2021 Updated Inspection Plan for the Beaver Valley Power Station, Units 1 and 2 (Report 05000334/2021005 and 05000412/2021005) ML21131A0242021-05-17017 May 2021 Review of Reactor Pressure Vessel Capsule Y Analysis Report ML21055A0582021-03-10010 March 2021 Review of the Refueling Outage 21 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and F* Reports L-21-063, Facility Id 04-13361, Unit 2 Emergency Diesel Generator Day Tanks2021-02-0101 February 2021 Facility Id 04-13361, Unit 2 Emergency Diesel Generator Day Tanks ML21026A3372021-01-26026 January 2021 Steam Generator Inspection Report Revision - Spring 2020 Refueling Outage L-20-257, Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic2020-09-22022 September 2020 Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic ML21127A1652020-07-17017 July 2020 ODCM: Index, Matrix and History of ODCM Changes L-21-135, ODCM: Liquid Effluents2020-07-17017 July 2020 ODCM: Liquid Effluents ML21127A1482020-07-17017 July 2020 ODCM: Controls for RETS and REMP Programs L-20-116, CFR 50.55a Request Number VRR6, Revision 0, Motor-Operated Valve Test Frequency2020-04-0101 April 2020 CFR 50.55a Request Number VRR6, Revision 0, Motor-Operated Valve Test Frequency ML19280A0382019-10-22022 October 2019 Ti 2515-191 Summary of Findings ML21127A1562019-07-17017 July 2019 ODCM: Gaseous Effluents ML19051A1092019-02-20020 February 2019 LTR-SDA-18-054-NP, Revision 0 - Technical Justification to Support the Extended Volumetric Examination Interval for Beaver Valley Unit 2 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds L-19-053, Emergency Response Data System Data Point Library Update2019-02-20020 February 2019 Emergency Response Data System Data Point Library Update L-18-037, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2018-06-18018 June 2018 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-18-017, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado.2018-03-15015 March 2018 Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado. ML21127A1592018-01-22022 January 2018 ODCM: Radiological Environmental Monitoring Program L-17-277, Pressure and Temperature Limits Reports, Revisions 8 and 92017-10-0404 October 2017 Pressure and Temperature Limits Reports, Revisions 8 and 9 L-17-259, Mitigating Strategies Assessment (MSA) for Flooding2017-09-20020 September 2017 Mitigating Strategies Assessment (MSA) for Flooding ML17213A0162017-05-11011 May 2017 Enclosure a: Beaver Valley, Units 1, Seismic Probabilistic Risk Assessment in Response to 50.54(f) Letter with Regard to NTTF 2.1 ML17213A0172017-05-11011 May 2017 Enclosure B: Beaver Valley, Unit 2, Seismic Probabilistic Risk Assessment in Response to 50.54(0 Letter with Regard to NTTF 2.1 ML17024A0362016-12-31031 December 2016 Operating Data Report for 2016 ML16312A3112016-11-0707 November 2016 Spent Fuel Pool Evaluation Supplemental Report. Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force (Ntif) Review... L-16-327, Technical Basis for Optimization or Elimination of Liquid Penetrant Exams for the Embedded Flaw Repair2016-10-31031 October 2016 Technical Basis for Optimization or Elimination of Liquid Penetrant Exams for the Embedded Flaw Repair L-16-093, Report of Facility Changes, Tests and Experiments2016-06-0303 June 2016 Report of Facility Changes, Tests and Experiments L-16-065, Transmittal of 180-Day Steam Generator Tube Inspection Report - Technical Specification 5.6.6.22016-04-0606 April 2016 Transmittal of 180-Day Steam Generator Tube Inspection Report - Technical Specification 5.6.6.2 L-16-006, Submittal of Annual Report Pursuant to 10 CFR 75.11, Location Information2016-01-20020 January 2016 Submittal of Annual Report Pursuant to 10 CFR 75.11, Location Information L-15-386, Post Accident Monitoring Report Regarding Inoperability of One of the Source Range Nuclear Excore Instrumentation Channel for a Period in Excess of the 30-Day Restoration Time2016-01-0505 January 2016 Post Accident Monitoring Report Regarding Inoperability of One of the Source Range Nuclear Excore Instrumentation Channel for a Period in Excess of the 30-Day Restoration Time L-15-337, Completion of Required Action by NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and NRC Order EA-12-051, Reliable Spent Fuel Pool..2015-12-21021 December 2015 Completion of Required Action by NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and NRC Order EA-12-051, Reliable Spent Fuel Pool.. ML16277A1142015-10-28028 October 2015 ERS-MPD-93-007, Rev. 11, BVPS-U1 Gaseous Radioactivity Monitor Emergency Action Levels. ML15274A3072015-10-0505 October 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54 Seismic Hazard Reevaluations for Recommendation 2.1of the Near-Term Task Force Review L-15-187, Submittal of 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2015-09-16016 September 2015 Submittal of 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models ML15132A4962015-05-22022 May 2015 Review of the 2014 Steam Generator Tube Inspection Report (TAC No. M4620) ML16277A1222015-04-20020 April 2015 ERS-LMR-14-001, Rev. 1, Liquid Monitor Alert Emergency Action Level (EAL) Set Points. ML15119A1042015-03-31031 March 2015 SG-CCOE-14-4-NP, Revision 1, Examination of Steam Generator Tubes Removed, Part 1 of 4 L-15-091, SG-CCOE-14-4-NP, Revision 1, Examination of Steam Generator Tubes Removed, Part 2 of 42015-03-31031 March 2015 SG-CCOE-14-4-NP, Revision 1, Examination of Steam Generator Tubes Removed, Part 2 of 4 ML21127A1582015-02-11011 February 2015 ODCM: Bases for ODCM Controls ML16277A1152015-01-30030 January 2015 ERS-HHM-87-014, Rev. 8, Unit 1 / Unit 2 ODCM Gaseous Effluent Monitor Setpoints. ML15027A2352015-01-28028 January 2015 Regulatory Audit in Support of the License Amendment Request to Implement a Risk-Informed, Performance-Based, Fire Protection Program (Tac Nos. MF3301 & MF3302) L-14-401, First Energy Nuclear Operating Company (FENOC) Expedited Seismic Evaluation Process (ESEP) Reports Response to NRC Request for Information Pursuant to 10 CFR50.54(f) Regarding Recommendation.1 of the Near-Term Task Force (NTTF) Review of In2014-12-19019 December 2014 First Energy Nuclear Operating Company (FENOC) Expedited Seismic Evaluation Process (ESEP) Reports Response to NRC Request for Information Pursuant to 10 CFR50.54(f) Regarding Recommendation.1 of the Near-Term Task Force (NTTF) Review of In L-14-352, Steam Generator Tube Inspection Report - Technical Specification 5.6.6.22014-11-0505 November 2014 Steam Generator Tube Inspection Report - Technical Specification 5.6.6.2 ML21127A1442014-10-0707 October 2014 ODCM: Information Related to 40 CFR 190 L-14-259, Firstenergy Nuclear Operating Company'S (Fenoc'S) Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2014-08-28028 August 2014 Firstenergy Nuclear Operating Company'S (Fenoc'S) Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML14224A5772014-07-31031 July 2014 SG-SGMP-14-17, Revision 1, Beaver Valley, Unit 2, End-of-Cycle 17 Analysis and Prediction for End-of-Cycle 18 Voltage-Based Repair Criteria 90-Day Report. ML14224A5762014-07-31031 July 2014 SG-CCOE-14-1, Revision 0, Generic Letter 95-05 Tube Intersection Burst Test, Leakage Test, and Morphology Conclusions. ML14224A5752014-06-25025 June 2014 R17 Steam Generator F* (F Star) Report ML14009A0892014-02-10010 February 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Daiichi Nuclear Power Plant Accident 2023-08-07
[Table view] Category:Miscellaneous
MONTHYEARL-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000334/20210052021-09-0101 September 2021 Updated Inspection Plan for the Beaver Valley Power Station, Units 1 and 2 (Report 05000334/2021005 and 05000412/2021005) ML21131A0242021-05-17017 May 2021 Review of Reactor Pressure Vessel Capsule Y Analysis Report ML21055A0582021-03-10010 March 2021 Review of the Refueling Outage 21 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and F* Reports L-21-063, Facility Id 04-13361, Unit 2 Emergency Diesel Generator Day Tanks2021-02-0101 February 2021 Facility Id 04-13361, Unit 2 Emergency Diesel Generator Day Tanks L-20-257, Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic2020-09-22022 September 2020 Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic L-19-053, Emergency Response Data System Data Point Library Update2019-02-20020 February 2019 Emergency Response Data System Data Point Library Update L-18-037, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2018-06-18018 June 2018 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-18-017, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado.2018-03-15015 March 2018 Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado. ML17024A0362016-12-31031 December 2016 Operating Data Report for 2016 ML16312A3112016-11-0707 November 2016 Spent Fuel Pool Evaluation Supplemental Report. Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force (Ntif) Review... L-16-093, Report of Facility Changes, Tests and Experiments2016-06-0303 June 2016 Report of Facility Changes, Tests and Experiments L-16-065, Transmittal of 180-Day Steam Generator Tube Inspection Report - Technical Specification 5.6.6.22016-04-0606 April 2016 Transmittal of 180-Day Steam Generator Tube Inspection Report - Technical Specification 5.6.6.2 L-16-006, Submittal of Annual Report Pursuant to 10 CFR 75.11, Location Information2016-01-20020 January 2016 Submittal of Annual Report Pursuant to 10 CFR 75.11, Location Information L-15-386, Post Accident Monitoring Report Regarding Inoperability of One of the Source Range Nuclear Excore Instrumentation Channel for a Period in Excess of the 30-Day Restoration Time2016-01-0505 January 2016 Post Accident Monitoring Report Regarding Inoperability of One of the Source Range Nuclear Excore Instrumentation Channel for a Period in Excess of the 30-Day Restoration Time L-15-337, Completion of Required Action by NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and NRC Order EA-12-051, Reliable Spent Fuel Pool..2015-12-21021 December 2015 Completion of Required Action by NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and NRC Order EA-12-051, Reliable Spent Fuel Pool.. ML15274A3072015-10-0505 October 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54 Seismic Hazard Reevaluations for Recommendation 2.1of the Near-Term Task Force Review L-15-187, Submittal of 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2015-09-16016 September 2015 Submittal of 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models ML15132A4962015-05-22022 May 2015 Review of the 2014 Steam Generator Tube Inspection Report (TAC No. M4620) ML15027A2352015-01-28028 January 2015 Regulatory Audit in Support of the License Amendment Request to Implement a Risk-Informed, Performance-Based, Fire Protection Program (Tac Nos. MF3301 & MF3302) L-14-401, First Energy Nuclear Operating Company (FENOC) Expedited Seismic Evaluation Process (ESEP) Reports Response to NRC Request for Information Pursuant to 10 CFR50.54(f) Regarding Recommendation.1 of the Near-Term Task Force (NTTF) Review of In2014-12-19019 December 2014 First Energy Nuclear Operating Company (FENOC) Expedited Seismic Evaluation Process (ESEP) Reports Response to NRC Request for Information Pursuant to 10 CFR50.54(f) Regarding Recommendation.1 of the Near-Term Task Force (NTTF) Review of In L-14-352, Steam Generator Tube Inspection Report - Technical Specification 5.6.6.22014-11-0505 November 2014 Steam Generator Tube Inspection Report - Technical Specification 5.6.6.2 L-14-259, Firstenergy Nuclear Operating Company'S (Fenoc'S) Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2014-08-28028 August 2014 Firstenergy Nuclear Operating Company'S (Fenoc'S) Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML14009A0892014-02-10010 February 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Daiichi Nuclear Power Plant Accident ML13284A0242013-09-0404 September 2013 Near-Term Task Force Recommendation 2.3, Seismic Walkdown Report Revision 1, Appendix B, Seismic Walkdown Checklists (Swcs), Part 3 of 5 ML13284A0272013-09-0404 September 2013 Near-Term Task Force Recommendation 2.3, Seismic Walkdown Report Revision 1, Appendix B, Seismic Walkdown Checklists (Swcs), Continued, Part 4 of 5 ML13284A0262013-09-0404 September 2013 Near-Term Task Force Recommendation 2.3, Seismic Walkdown Report Revision 1, Appendix a, Resumes and Qualifications, Part 2 of 5 ML13284A0252013-09-0404 September 2013 Near-Term Task Force Recommendation 2.3, Seismic Walkdown Report Revision 1, Part 1 of 5 ML13284A0232013-09-0404 September 2013 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Revision 1, Appendix a, Resumes and Qualifications, Part 2 of 5 ML13284A0192013-09-0404 September 2013 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Revision 1, Appendix B Seismic Walkdown Checklists (Swcs), Part 3 of 5 ML13284A0222013-09-0404 September 2013 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Revision 1, Part 1 of 5 ML13284A0202013-09-0404 September 2013 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Revision 1, Appendix B Seismic Walkdown Checklists (Swcs) Continued. Part 4 of 5 ML13284A0212013-09-0404 September 2013 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Revision 1, Appendix C Area Walk-by Checklists (Awcs), Part 5 of 5 L-13-036, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedules2013-05-28028 May 2013 Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedules L-13-095, Discharge Monitoring Report (NPDES) Permit No. PA00256152013-02-22022 February 2013 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-12-437, Containment Liner Random and Non-Random Examinations Report2012-12-18018 December 2012 Containment Liner Random and Non-Random Examinations Report L-12-347, FENOC Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident2012-11-27027 November 2012 FENOC Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident ML13008A0422012-10-31031 October 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B Seismic Walkdown Checklits (Swcs), Battery 2N. Pages 1 - 82 ML13008A0412012-10-31031 October 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report. Cover Through A-40 ML13135A2382012-10-31031 October 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B - Seismic Walkdown Checklists (Swcs), Sheet 1 of 513 Through Sheet 301 of 513 ML13008A0432012-10-31031 October 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B Seismic Walkdown Checklists (Swcs), Purge Valve Isolation. Pages 83 - 161 ML13008A0442012-10-31031 October 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B Seismic Walkdown Checklists (Swcs), Bus F1, Low Voltage Switchgear. Pages 162 - 240 ML13008A0452012-10-31031 October 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B Seismic Walkdown Checklists (Swcs), SGI Level Switch SP9B6. Pages 241 - 318 ML13008A0462012-10-31031 October 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B Seismic Walkdown Checklists (Swcs), Relief Valves SW 3963. Pages 319 - End ML13135A2412012-10-31031 October 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix C - Area Walk-by Checklists (Awcs) and Appendix D - Component List for Anchorage Configuration Check ML13135A2402012-10-31031 October 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B - Seismic Walkdown Checklists (Swcs), Sheet 302 of 513 Through Sheet 513 of 513 ML13135A2362012-10-31031 October 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report ML13135A2372012-10-31031 October 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix a - Resumes and Qualifications ML13008A0402012-10-23023 October 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix C Area Walk-by Checklists (Awcs), Prim. Aux. Bldg 735'6. Pages 135 - 191 ML13008A0392012-10-23023 October 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix C Area Walk-by Checklists (Awcs), Emer. Swgr. Room Train A. Pages 66 - 134 2023-08-07
[Table view] |