L-10-325, Submittal of Revision 26 to the Updated Final Safety Analysis Report

From kanterella
Jump to navigation Jump to search
Submittal of Revision 26 to the Updated Final Safety Analysis Report
ML11278A014
Person / Time
Site: Beaver Valley
Issue date: 05/23/2011
From: Harden P
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-10-325
Download: ML11278A014 (4)


Text

FENOC FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4 Shippingport, PA 15077 Paul A. Harden Site Vice President May 23, 2011 L-10-325 724-682-5234 Fax: 724-643-8069 10 CFR 50.71(e) 10 CFR 50.54 (a)

ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station Unit No. 1 Docket No. 50-334, License No. DPR-66 Submittal of Revision 26 to the Updated Final Safety Analysis Report In accordance with the requirements of 10 CFR 50.71(e), the FirstEnergy Nuclear Operating Company (FENOC) is hereby submitting to the Nuclear Regulatory Commission (NRC) Revision 26 to the Beaver Valley Power Station (BVPS), Unit No. 1, Updated Final Safety Analysis Report (UFSAR) in CD-ROM format. This submittal reflects facility and procedure changes implemented between May 21, 2009 (the end of Refueling Outage 19) and November 04, 2010 (the end of Refueling Outage 20), along with several changes implemented after Refueling Outage 20.

As requested by NRC guidance for electronic submissions to the Commission, provides a listing of document components that make up the enclosed CD-ROM. In addition to the UFSAR, the enclosure includes the BVPS Unit No. 1 Licensing Requirements Manual, Revision 73, incorporated by reference in the UFSAR, and the Technical Specification Bases, Revision 15. The Technical Specification Bases are submitted to satisfy Technical Specification 5.5.10.d, which requires submittal of Bases changes implemented without prior NRC approval.

In accordance with 10 CFR 50.54(a), FENOC is hereby submitting a copy of the current revision of the FENOC Quality Assurance Program Manual (QAPM).

Revision 15 of the FENOC QAPM is provided in the enclosed CD-ROM. includes a summary of information removed from the BVPS Unit No. 1 UFSAR in accordance with Appendix A to Nuclear Energy Institute (NEI) 98-03, "Guidelines for Updating Final Safety Analysis Reports," as endorsed by Regulatory Guide 1.181, "Content of the Updated Final Safety Analysis Report in Accordance with 10 CFR 50.71(e)."

1L7

Beaver Valley Power Station, Unit No. 1 L-10-325 Page 2 There are no regulatory commitment changes to be submitted in accordance with NEI 99-04, "Guidelines for Managing NRC Commitment Changes."

This certifies, to the best of our judgment and belief, that Revision 26 of the BVPS Unit No. 1 UFSAR accurately presents changes made since the previous submittal that are necessary to reflect information and analysis submitted to the Commission or pursuant to Commission requirements.

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager -

Fleet Licensing, at (330) 761-6071.

Sincerely, Paul A. Harden Attachments:

1. Document Components on CD-ROM
2. Information Removed from the BVPS Unit No. 1 UFSAR

Enclosures:

Beaver Valley Power Station Unit No. 1 UFSAR, Technical Specification Bases, Licensing Requirements Manual and QAPM (on CD-ROM disc) cc:

NRC Region I Administrator NRC Resident Inspector Nuclear Reactor Regulation Project Manager Director BRP/DEP Site BRP/DEP Representative L-1 0-325 Document Components on CD-ROM Page 1 of 1 File Name Size 001 List of Effective Pages, Rev 26.pdf 67K 002 Section 1.pdf 1,107K 003 Section 2.pdf 42,350K 004 Section 3.pdf 3,873K 005 Section 4.pdf 1,229K 006 Section 5.pdf 5,771K 007 Section 6.pdf 30,748K 008 Section 7.pdf 3,768K 009 Section 8.pdf 2,272K 010 Section 9.pdf 1,736K 011 Section 10.pdf 839K 012 Section 11.pdf 1,562K 013 Section 12.pdf 91K 014 Section 13.pdf 396K 015 Section 14.pdf 14,534K 016 Section 15.pdf 132K 017 Section 16.pdf 161K 018 Appendix A.pdf 1,305K 019 Appendix B.pdf 4,288K BVPS-1 LRM Rev 73.pdf 564K BVPS Bases Rev 15.pdf 1,538K FENOC QA Program Manual Rev 15.pdf 17,222K L-10-325 Information Removed from the BVPS Unit No. 1 UFSAR Page 1 of 1 In accordance with Nuclear Energy Institute (NEI) 98-03, Revision 1, "Guidelines for Updating Final Safety Analysis Reports," licensees are required to periodically report a brief description of information removed from the Updated Final Safety Analysis Report (UFSAR) and the basis for its removal. The following provides a summary of the information removed from the UFSAR and the basis for removal.

1. UFSAR Change Notice 11-020 removed reference to a specific Technical Specification related to fuel oil properties because the Technical Specification was not applicable to the fuel oil in all of the tanks mentioned, and the information was considered excessive detail.