L-02-043, Supplemental Reply to Order for Interim Safeguards and Security Compensatory Measures

From kanterella
(Redirected from L-02-043)
Jump to navigation Jump to search
Supplemental Reply to Order for Interim Safeguards and Security Compensatory Measures
ML021120437
Person / Time
Site: Beaver Valley
Issue date: 04/17/2002
From: Myers L
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-02-043
Download: ML021120437 (2)


Text

Beaver Valley Power Station FENOC SAFEGUARDS INFORMATION Route 168 PO. Box 4 FirstEnergy Nuclear Operating Company Shippingport, PA 15077-0004 Lew W. Myers 724-682-5234 Senior Vice President Fax: 724-643-8069 April 17, 2002 L-02-043 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No. 1 and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Supplemental Reply to Order for Interim Safeguards and Security Compensatory Measures This letter provides a FirstEnergy Nuclear Operating Company (FENOC) supplemental response for Beaver Valley Power Station Units 1 & 2 to the Order for Interim Safeguards and Security Compensatory Measures, issued on February 25, 2002.

As required by the Order, a 20-day response for BVPS Units 1 and 2 was provided on March 15, 2002.

In a conference call on April 11, 2002, the NRC requested that supplemental information be provided regarding actions taken to address Interim Compensatory Measure (ICM)

B.5.e. of the Order. This requested information is provided in the Enclosure to this letter, as is some additional information regarding ICMs B.5.b and B.5.d that was also discussed during the call.

The information contained in the Enclosure to this letter is considered Safeguards Information under the provisions of 10 CFR 73.21, and is thereby exempt from public disclosure.

If there are any questions concerning this

matter, please contact Mr. Kenneth E. Halliday, Manager Nuclear Security at 724-682-5072.

I declare under penalty of perjury that the foregoing is true and correct. Executed on April 17, 2002.

Sincerely, ENCLOSURES CONTAIN SAFEGUARDS INFORMkATIONo UPON SEPARATION T*hIS PACE IS DECONTROLLED Lew W. Myers SAFEGUARDS WNFORMATiON

SAFEGUARDS INFORMATION Beaver Valley Power Station, Unit No. 1 and No. 2 Order for Interim Safeguaids and Security Compensatory Measures for BVPS L-02-022 Page 2 c:

Addressee (4 copies of enclosure)

Mr. D. S. Collins, Project Manager (w/o enclosure)

Mr. D. M. Kern, Sr. Resident Inspector (1 copy)

Mr. H. J. Miller, NRC Region I Administrator (2 copies)

Mr. Glenn Tracy, Chief, Reactor Safeguards (1 copy)

Mr. S. J. Collins, Director, Office of Nuclear Reactor Regulation (1 copy)

ENCLOSURES CONTAIN SAFEGUARDS

ýNFORMATIOH. UPON SEPARATION T1I*S PAGE IS DECO'TROLLED SAFEGUARDS INFORMATION