JPN-96-010, Forwards Application for Amend to License DPR-59,changing TS Table 3.2-2, Core & Containment Cooling Sys Initiation & Control Instrumentation Operability Requirements

From kanterella
(Redirected from JPN-96-010)
Jump to navigation Jump to search
Forwards Application for Amend to License DPR-59,changing TS Table 3.2-2, Core & Containment Cooling Sys Initiation & Control Instrumentation Operability Requirements
ML20101H349
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/22/1996
From: William Cahill
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20101H352 List:
References
JPN-96-010, JPN-96-10, NUDOCS 9603290222
Download: ML20101H349 (3)


Text

.

123 Main Street b

WMe Plains. New York 10601 914 681-6840 915-287 3309 (FAX)

  1. > NewYorkPower

. _,. c m,,,,,.

4# Authority c- "~ o-l l

March 22,1996 JPN-96-010 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-137 Washington, DC 20555

SUBJECT:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Proposed Change to the Technical Specifications Regarding Core and Containment Cooling System initiation and Control Instrumentation (JPTS-96-002)

REFERENCES:

1.

NRC letter, C. E. Carpenter, Jr. to W. J. Cahill, Jr., dated September 11,1995, issuing Amendment 227 to the James A.

FitzPatrick Technical Specifications.

2.

NRC letter, C. E. Carpenter, Jr. to W. J. Cahill, Jr., dated December 11,1995, regarding " Correction to Amendments 227 and 228 for the James A. FitzPatrick Nuclear Power Plant."

Dear Sir:

This application for an amendment to the James A. FitzPatrick Technical Specifications (TS) proposes changes to TS Table 3.2-2, " Core and Containment Cooling System Initiation and Control Instrumentation Operability Requirements." The proposed changes will clarify operability requirements for 4kV Emergency Bus Undervoltage Trip Functions.

By letter dated September 11,1995 (Reference 1), the NRC issued Amendment 227 to the FitzPatrick TS. This amendment included extensions to the allowed outage times (AOTs) for emergency core cooling system (ECCS) actuation instrumentation. Prior to implementation of Amendment 227, the Authority discovered an error relating to AOT extensions for 4kV Emergency Bus Undervoltage Trip Functions associated with TS Table 3.2-2. Specifically, the AOT extensions for these trip functions were not consistent with the requirements of Standard Technical Specifications (STS), NUREG-1433, and differed from the recommendations in the associated Licensing Topical Report. The Authority committed to implement administrative i

measures to ensure AOT extensions were not applied to these trip functions, and to submit an amendment application to clarify the operability requirements for these trip functions.

I n' no18

~g\\

n

~

l 9603290222 960322 DR ADOCK 0500 3

By letter dated December 11,1995 (Reference 2), the NRC concurred with the Authority's interpretation that AOT extensions were not appropriate for these trip functions and agreed with the Authority's committed course of action.

Additional changes are preposed to TS Table 3.2-2 and to TS Tablo 4.2-2, " Core and Containment Cooling Systam Instrumentation Test and Calibration Requirements." These i

changes will: (1) replace the generic actions for inoperable instrument channels with function-specific actions, (2) replace the generic test AOT with function-specific test AOTs, and (3) relocate selected trip functions from the TS to an Authority controlled document. This will ensure consistency with STS, simplify the use of TS, and facilitate STS conversion by minimizing the differences between current TS and STS. The changes will also enhance safety by ensuring that an inoperable instrument channel is not placed in the tripped condition when this condition is not a safe state for the channel.

The signed original of the Application for Amendment to the Operating License is i

enclosed for filing. Attachment I contains the proposed new TS pages and Attachment ll is the Safety Evaluation for the proposed changes. A markup of the affected TS pages is included as Attachment 111. Attachment IV lists the commitments contained in this submittal.

A copy of this application and the associated attachments is being provided to the Designated New York State Official in accordance with 10 CFR 50.91.

The Authority requests implementation of this amendment within 60 days of issuance, to allow time for operator training and procedure revisions.

If you have any questions, please contact Ms. C. D. Faison.

Very truly yours, W. J. Cahill, Jr.

Chief Nuclear Officer att: as stated 1

cc: next page i

t t

cc:

Regional Administrator l

U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Resident inspector j

U. S. Nuclear Regulatory Commission P.O. Box 136 i

Lycoming, NY 13093 Ms. K. Cotton, Acting Project Manager Project Directorate 1-1 i

Division of Reactor Projects-l/Il l

U. S. Nuclear Regulatory Commission Mail Stop 1482 Washington, DC 20555 Mr. F. William Valentino, President New York State Energy, Research and Development Authority 2 Rockefeller Plaza i

Albany, NY 12223-1253 P