JPN-95-044, Forwards Application for Amends to License DPR-59,proposing Ts,By Extending Surveillance Test Intervals for Auxiliary Electrical Sys to Support 24 Month Operating Cycles

From kanterella
(Redirected from JPN-95-044)
Jump to navigation Jump to search
Forwards Application for Amends to License DPR-59,proposing Ts,By Extending Surveillance Test Intervals for Auxiliary Electrical Sys to Support 24 Month Operating Cycles
ML20092H517
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/15/1995
From: William Cahill
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20092H520 List:
References
JPN-95-044, JPN-95-44, NUDOCS 9509210062
Download: ML20092H517 (2)


Text

!

123 Main Sire'et Yhte Psos. New York 10601 914 681 0840 914-287-3309 (FAX)

  1. > NewYorkPbwer mo.u c.m,,...

4# Authority c"a-o"-

September 15,1995 JPN-95-044 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-137 Washington, DC 20555

Subject:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Proposed Changes to the Technical Specifications Regarding Extension of the Auxiliary Electrical Surveillance Test Intervals to Accommodate 24-Month Ooeratina Cveles (JPTS-95-001C)

Reference:

1.

NRC Generic Letter 91-04, " Changes in Technical Specification Surveillance intervals to Accommodate j

24-Month Fuel Cycle," dated April 2,1991.

j

Dear Sir:

This application for an amendment to the James A. FitzPatrick Nuclear Power Plant Technical Specifications proposes to extend the surveillance test intervals for the auxiliary electrical systems to support 24 month operating cycles. The proposed changes follow the guidance of Generic Letter 91-04 (Reference 1). Approval of these changes will eliminate the need to schedule mid-cycle outages to conduct these surveillance tests. This amendment also proposes new commitments for modified performance testing and accelerated performance testing for station batteries.

Surveillance test interval extensions that are justified will be denoted as being performed "every 24 months" or "at least once per 24 months" consistent with the guidance provided in Reference 1. Other surveillances currently performed "once each operating cycle," "at least once during each operating cycle," "each refueling," or similar notation, that are not being extended at this time will be denoted as being performed "at least once per 18 months."

The signed original of the Application for Amendment to the Technical Specifications is enclosed for filing. Attachments I and ill to this application contain the proposed changes to the Technical Specifications and a mark-up ci the current Technical Specifications pages, respectively. Attachment 11 contains the associated Safety Evaluation for the auxiliary electrical systems. Attachment IV contains References 2 and 4 of the Safety Evaluation.

\\

l r;. e n e..,

Bg,2;ggg2gggg;g,,

zgg,

I

. P_

_.PDR 1

l l

In accordance with 10 CFR 50.91, a copy of this application and the associated attachments are being provided to the designated New York State official.

If you have any questions, please contact Ms. C. D. Faison.

Very truly yours,

_?

William J. Cahill, Jr.

Chief Nuclear Officer cc:

Regional Administrator U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Resident inspector U.S. Nuclear Regulatory Commission P. O. Box 136 Lycoming, NY 13093 Mr. C. E. Carpenter, Project Manager Project Directorate I-1 Division of Reactor Projects - 1/11 U.S. Nuclear Regulatory Commission Mail Stop 14 B2 Washington, DC 20555 Mr. F. William Valentio, President New York State Energy, Research and Development Corporation 2 Rockefeller Plaza 16"' Floor Albany, NY 12223-1253 l