JPN-95-022, Application for Amend to License DPR-59.Amend Would Extend Surveillance Test Intervals for Nuclear Steam Supply Sys to Support 24 Month Operating Cycles
| ML20082H996 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 04/12/1995 |
| From: | William Cahill POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20082H998 | List: |
| References | |
| GL-91-04, GL-91-4, JPN-95-022, JPN-95-22, NUDOCS 9504180032 | |
| Download: ML20082H996 (3) | |
Text
-
123 Main Street Wh:te Plains. New York 10601 914-681-6840 914287-3309 (FAX)
.(
4 NewYorkPbwer mnm.i. co..,,.
4# Authority c"*' ""* r o"-
April 12,1995 JPN 95-022 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-137 Washington, DC 20555
Subject:
James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Proposed Changes to the Technical Specifications Regarding i
i Extension of Nuclear Steam Supply System Surveillance Test l
Intervals to Accommodate 24-Month Operatina Cycles (JPTS-95-001B)
Reference:
1.
NRC Generic Letter 91-04, " Changes in Technical Specification Surveillance Intervals to Accommodate 24-Month Fuel Cycle," dated April 2,1991.
Dear Sir:
l l
This application for an amendment to the James A. FitzPatrick Nuclear Power Plant Technical Specifications proposes to extend the surveillance test intervals for the nuclear steam supply system to support 24 month operating cycles. The proposed changes follow the guidance of Generic Letter 91-04, (Reference 1). Approval of these changes will eliminate the need to schedule mid-cycle outages to conduct these surveillance tests.
Surveillance test interval extensions that are justified will be denoted as being l
performed "every 24 months" or "at least once per 24 months" consistent with the guidance provided in Reference 1. Other surveillances currently performed "once each operating cycle," "at least once during each opersting cycle," "each refueling," or similar notation, that are not being extended at this tir.ie will be denoted as being l
performed "at least once per 18 months."
The signed original of the Application for Amendment to the Technical Specifications is enclosed for filing. Attachments I and ill to this application contain the proposed changes to the Technical Specifications, and a mark-up of the current Technical Specification pages. Attachment ll contains the associated Safety Evaluation for the nuclear steam supply system.
l
\\
In accordance with 10 CFR 50.91, a copy of this application and the associated attachments are being provided to the designated New York State official.
0 s nn,-m n.
9504180032t950412 1
PDR ADOCK 05000333
~
l
\\
]
gi P
~
l i
4 If you have any questions, please contact Ms. C. D. Faison.
?
Very truly yours, I
i IA l
du William J. Cahill, Jr.
Chief Nuclear Officer.
i 1
l i
cc:
Regional Administrator -
l U.S. Nuclear Regulatory Commission j
475 Allendale Road King of Prussia, PA 19406 Office of the Resident inspector U.S. Nuclear Regulatory Commission P. O. Box 136 l
Lycoming, NY 13093 Mr. C. E. Carpenter, Project Manager Project Directorate 1-1 Division of Reactor Projects - 1/ll 1
j U.S. Nuclear Regulatory Commission l
Mail Stop 14 B2 Washington, DC 20555 Ms. Donna Ross New York State Energy Office 2 Empire State Plaza 16'h Flow Albany, NY 12223 t
i l
l l
l l
~'
BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION in the matter of
)
NEW YORK POWER AUTHORITY
)
Docket No. 50-333 James A. FitzPatrick Nuclear Power Plant )
APPLICATION FOR AMENDMENT TO OPERATING LICENSE The New York Power Authority requests an amendment to the Technical Specifications contained in Appendix A and B, respectively, to Facility Operating License No. DPR-59 for the James A. FitzPatrick Nuclear Power Plant. This application is filed in accordance with Section 10 CFR 50.90 of the Nuclear Regulatory Cornmission's regulations.
This application for an amendment to the James A. FitzPatrick Nuclear Power Plant Technical Specifications proposes to extend the surveillance test intervals for the nuclear steam supply system to support 24-month operating cycles. The proposed changes follow the guidance of Generic Letter 91-04. Approval of these changes will eliminate the need to schedule mid-cycle outages to conduct these surveillance tests.
Surveillance test interval extensions that are justified will be denoted as being performed "every 24 months" or "at least once per 24 months" consistent with the guidance provided in NRC Generic Letter 91-04. Other surveillances currently performed "once each operating cycle," "at least once during each operating cycle,"
"each refueling," or similar notation, that are not being extended at this time will be l
denoted as being performed "at least once per 18 months."
The signed original of the Application for Amendment to the Technical Specifications is enclosed for filing. Attachments I and lli to this application contain the proposed changes to the Technical Specifications, and a mark-up of the current Technical Specification pages. Attachment ll contains the associated Safety Evaluation for the nuclear steam supply system.
New York Power Authority A=
h William J. Cahill, Jr.
Chief Nuclear Officer STATE OF NEW YORK COUNTY OF WESTCHESTER Subscribed and sworn to before me this # day of 1995.
Ci L
Notg Public
[
t/
M4HLEEN D. GALLAGHER
% Public, State of New York No.6004481 Ouelined in Westchester Count Commission Expires Nov.16,19h