JPN-93-003, Forwards Application for Amend to License DPR-59,removing Spec 4.0.B Limit of 3.5 on Extending Surveillance Intervals & Associated Definition of Surveillance Frequency in Spec 1.0.T,per GL 89-14
| ML20034E808 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 02/22/1993 |
| From: | Ralph Beedle POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20034E809 | List: |
| References | |
| GL-89-14, JPN-93-003, JPN-93-3, NUDOCS 9303010394 | |
| Download: ML20034E808 (2) | |
Text
f U3 Main street
-(
WNte P:ains. New York 10601 914 681 6846 4 NewYo!kPawer e.,,, e. e...,,
& Aufhonty e ec t~e v.ce e,es>ae,1 tL; clear Generatron February 22,1993 JPN-93-003 U.S. Nuclear Regulatory Commission ATTN: Document Contro! Desk 1
Mail Station P1-137 Washington, D.C. 20555
SUBJECT:
James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Proposed Change to the Technical Specifications Removal of the 3.5 Limit on Extendina Surveillance Intervals (JPTS-89-026)
- REFERENCE
- 1. NRC Generic Letter 89-14, J. G. Partlow to All Licensees of Operating Plants, Applicants for Operating Licenses, and Holders of Construction Permits, dated August 21,1989 regarding " Removal of the 3.25 Limit on Extending Surveillance Intervals."
Dear Sir:
This application for an amendment to the James A. FitzPatrick Technical Specifications proposes to revise Specifications 1.0.T,4.0.B and associated Bases to be consistent with the Standard Technical Specifications and NRC Generic Letter 89-14 (Reference 1).
Specification 4.0.8 permits surveillance intervals to be extended up to 25 percent of the specified interval but limits any three consecutive extensions to 3.5 times the interval. The limitation in the Standard Technical Specifications is slightly lower at 3.25 times the specified interval. The limitation on extending surveillance intervals has been removed from the Standard Technical Specifications by Generic Letter 89-14 as a line item improvement. Generic Letter 89-14 provides guidance for license amendment requests to implement the improvement. Specification 1.0.T is being deleted for consistency with this change.
The signed original of the Application for Amendment to Operating License is enclosed for filing. Attachments I and il to this application contain the proposed changes to the Technical Specifications and the associated Safety Evaluation.
In accordance with 10 CFR 50.91, a copy of this application and the associated attachments are being provided to the designated New York State official.
4 010100 9303010394 930222 h>1 PDR ADDCK 05000333 7 t I
PDR p
~_. -..
. ~..
l If you have any questions regarding the proposed changes, please I
contact Mr. J. A. Gray, Jr.
Very truly yours,
/
?
b D)
Ralph.~ Beedle N-
.i f
I att: as stated cc: Regional Administrator i
U.S. Nuclear Regulatory Commission l
475 Allendale Road King of Prussia, PA 19406 i
i Office of the Resident inspector i
U.S. Nuclear Regulatory Commission l
P.O. Box 136 i
Lycoming, NY 13093
{
Mr. Brian C. McCabe Project Directorate 1-1 Division of Reactor Projects -l/11 U.S. Nuclear Regulatory Commission l
Mail Stop 14_B2 -
Washington, DC 20555 l
Ms. Donna Ross New York State Energy Office 2 Empire State Plaza i
16* Floor l
Albany, NY 12223 i