JPN-91-057, Forwards Application for Amend to License DPR-59,proposing Administrative Change to Update RHR Pump Surveillance Test Acceptance Flow Rate from 9900 to 8910 Gpm.Change Updates Spec Added in Amend 168 Oto Reflect Amend 171

From kanterella
(Redirected from JPN-91-057)
Jump to navigation Jump to search
Forwards Application for Amend to License DPR-59,proposing Administrative Change to Update RHR Pump Surveillance Test Acceptance Flow Rate from 9900 to 8910 Gpm.Change Updates Spec Added in Amend 168 Oto Reflect Amend 171
ML20079K386
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 10/11/1991
From: Ralph Beedle
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20079K366 List:
References
JPN-91-057, JPN-91-57, NUDOCS 9110220194
Download: ML20079K386 (2)


Text

w , --

{

1?J M&n Stre,rt

. wnae neins tww w tw?1 914 tel tm46

  1. > NewYorkPower wa me

<st Authority tJitr Octobor 11,1091 JPN 91-057 U.S. Nuclear Rogulatory Commiss!on ATTN: Documont Control Desk Mall Station P1 137 Washington, D.C. 20555

SUBJECT:

James A. FitzPatrick Nuclear Power Piant Dockot No.60-333 Proposed Changes to the Technical Specifications Modification of RHR Flew_ Rato Requirements (JPTS 01013)

Rotorencos: 1. Amendmont 108 to tho Jemos A. FitzPatrick Oporating Uconso, February 13,1991.

2. NYPA lottor, J. C. Brons to the NRC. dated Juno 21,1990, (JPN 93449), roquestir's changos to the RHR Pump Technical Specifications.
3. Amendmont 171 to the James A. FlMPatrick Opor ting Uconso, July 1,1991

Dear Sir:

This application for an amondmont to tho James A. FitzPatrick Technical Specifications proposes an administrativo chango to updtto tho Rosidual Hoat Romoval (RHR) pump survol!!anco tost acceptar.o flow rato from 9900 to 8910 gpm on pago 122. This page was part of Amendment 108 (Reforenco 1) which was added to incorporato now operability roqultomonts, survolitanco requiremonts, and corresponding bases for minimum Emorgoney Coro Cooling System availabihty when the plant is in the cold shutdown condition. A subsoquent submittal was mado (Referenco 2) to modify the RHR pump survollianco tost acceptanco flow rato for porlodic testing but was based upon tho Tochnical Specifications existing beforo approval of Amondmont 168. This submntal was approved as Amondmont 171 (Roforenco 3). This proposed chango will up%tu thc Spocification added in Amondmont 168 to rofloct Amondmont 171.

Tho cl0nod originar of the Application for Amendmont to Operating Uconso is onclosod 1or filing. Attachmonts I and il to this application contaln the proposod changes to the Technical Specifications and the associated Safety Evaluation, t

,\

i m o=om m m 1 7 e \

PDR nDOCK Off.OD E 3 M \

P FDR Q l

., i

, , A copy of this app!! cation and the associated attachmonts oro being provided to tho designated Now York Stato official in accordanco with 10 CFR 50.91.

i if you havo any questions, pleaso contact J. A. Gray, Jr.

I Very truly yours, ,

b .( j G3f S .

Ralph E. Boodlo Exocutivo Vico President Nuclear Gonoration att: as stated cc: Roglonal Administrator.

U.S. Nuclear Regulatory Commission 475 Allondalo Road King of Prussia, PA 10400 Offico of the Rosidont inspector U.S. Nucloor Rogulatory Commission P.O. Box 13G Lycomlng,NY 13093 Mr. Brian C. McCabo Projoct Directorato 11 Divisionof ReactorProjocts l/ll U.S. Nucioar Regulatory Commission Mall Stop 14 B2 Washington, DC 20555 Ms. Donna Ross New York Stato Enorgy Offico

- 2 Empiro Stato Plaza 1G* Floor Albany, NY 12223 >

_ . . _ . _ __