Forwards Application for Amend to License DPR-59,revising Tech Spec 3.6.A, Pressurization & Thermal Limits, to Comply W/Generic Ltr 88-11 & Reg Guide 1.99,Rev 2
ML19354E053
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 01/12/1990
From: Brons J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19354E054 List:
References
RTR-REGGD-01.099, RTR-REGGD-1.099 GL-88-11, JPN-90-007, JPN-90-7, NUDOCS 9001250299
Download: ML19354E053 (2)


Text

- _ _ _ _

' $ife IUewwruosoi 6-s.

sn4 %16240' b ['

John C. Drons Executiw Vice President Nucioar Generation January 12, 1990

'JPN-90-007

- U.S. Nuclear Regulatory Commission ATTN: Document Control Desk.

Mall Station P1137 Washington, D.C. 20555

SUBJECT:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Proposed Changes to the Technical Specifications Regarding Pressure-Temperature Limits (JPTS-8S024)

REFERENCES:

1.

NYPA letter J. C. Brons to NRC (JPN-89 044), dated June 30, 1989, responding to Generic Letter 88-11.

Dear Sir:

This application for an amendment to the James A. FitzPatrick Technical Specifications revises Specification 3.6.A, " Pressurization and Thermal Limits," to comply

.l with Generic Letter 88-11 and Regulatory Guide 1.99, Revision 2. Specifically, the existing pressure-temperature curves in Figure 3.61 are replaced with new curves for operation to 12,14, and 16 Effective Full Power Years (EFPY) The Limiting Condition for i

Operation and the Bases Section are revised to reflect the new pressure-temperature limlu.

As committed in Reference 1, the Authority intends to implement these changes before startup following the March 1990 refueling outage. Approval by April 30,1990 is requested to support the planned restart date.

~

J Enclosed for filing is the signed original of a document entitled " Application for

- Amendment to Operating Ucense," with Attachments I and ll thereto, comprising a statement of the proposed changes to the Technical Specifications and the associated Safety Evaluation.

In accordanco with 10 CFR 50.91, a copy of this application and the associated attachments are being provided to the designated New York State official.

- i o

goo 12gfhoN e

\\\\

1 e

a

1 s-Should you or your staff have any questions regarding the proposed changes,' please ;

contact S. M. Toth of my staff.~

' Very truly yours, -

John C. Brons '

Executive Vice President Nuclear Generation ec:

U.S. Nuclear Regulatory Commission.

475 Allendale Road King of Prussia, PA 19406'

' Office of the Resident inspector.

U.S. Nuclear Regulatory Commission P.O. Box 136

~

. Lycoming, NY 13093 Mr. David E. LaBarge' Project Directorate 11 1

Division of Reactor Projects l/II' U.S. Nuclear Regulatory Commission Mail Stop 14 B2 Washington, DC 20555

' Ms. Donna Ross 1

Division of Policy Analysis and Planning -

Empire State Plaza -

th Building Number 2 16 Floor -

Albany, NY 12223 4

l m

a

.