JAFP-86-0296, Monthly Operating Rept for Mar 1986
ML20155B586 | |
Person / Time | |
---|---|
Site: | FitzPatrick |
Issue date: | 03/31/1986 |
From: | Radford Converse, Jackie Cook POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
To: | NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
References | |
JAFP-86-0296, JAFP-86-296, NUDOCS 8604160260 | |
Download: ML20155B586 (17) | |
Text
. . . _ . . _ _ . _
JAMES A. FITZPATRICK NUCLFAR POWER PLANT OPERATING DATA REPORT
$ D00ET No. 50-333 UNIT NAME FITZPATRICK DATE APRIL 1986 00MPIRIED BY JOHN COOK L~ TELEPHONE (315)342-3840 i
lj! OPERATING STATUS i
[~ 1. UNIT NAME: FITZPATRICK
=
- 2. REPORTING PERIOD: 860301-860331
- 3. LICENSED 'nERMAL POWER (MIT): 2436
- 4. NAMEPIATE RATING (GPOSS ME): 883 g 5. DESIGN ELECTRICAL RATING (NET ME): 816
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS ME): 823 5 ,. 7. MAXI 1'iM DEPENDABLE CAPACITY (tEr ME): 796
[- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (nuS 3 - 7) SINCE LAST REPORT, GIVE REASONS:
n-l
- 9. POWER LEVEL 10 MIIQI RESTRIUn.D, IF ANY (hTT ME): N0ht
!'s, 10. REASONS E R RESTRICTIONS, IF ANY:
f-i
- - ~ 1111S 50 NTH YR-10-DATE CUMUIATIVE R
l~ 11. HOURS IN REPUKuriG PERIOD: 744 2160 93601__
- 12. NUMBER OF HOURS REACIOR WAS CRITICAL: 415.8 1831.8 67247.4 i 13. REACIOR RESERVE SHUfDOLE HOURS: 0 0 0
!: 14. HOURS GENERATOR ON-LINE: 332.2 1748.2 65274.3
[ 15. UNIT RESERVE SHUrDOLE HOURS: 0 0 0
- 16. GROSS THERMAL ENERGY GDERATED OMI): 776856 4204416 139918090
- 5 17. GROSS ELECTRICAL DERGY GENERATED QWI): 263050 1435820 48029030
= 18. IEr ELECIRICAL ENERGY GEtERATED @WI): 254040 1386605 45951130
- 19. UNIT SERVICE FACIOR: 44.7 80.9 69.7 r- 20. UNIT AVAIIABILITY FACIOR: 44.7 80.9 69.7 L' 21. UNIT CAPACITY FACIOR (USING MDC NET): 42.9 80.6 63.5
- 22. UNIT CAPACITY FACIOR (USING DER hTr): 41.8 78.7 60.2 L 23. UNIT FORCED OUTAGE RATE: 0 0 12.9 L
[' 24. SHUrDOWNS SOEDULED ONER NEXT 6 l'ONDIS (TYPE, DATE AND DURATION OF EAOI):
5 b; 25. IF SHUR DOWN AT DO OF REPORT PERIOD, ESTD4ATED DATE OF STARTUP:
y
[
la 26. UNITS IN TEST STATUS (PRIOR 'IU C0tEERCIAL OPERATION): FDRECAST AOIIEVED
[L INITIAL CRITICALITY 9 INITIAL EIECTRICITY 7tEERCIAL OPERATION 8604160260 860331 PDR R ADOCK 05000333 js K-PDR
(
JAMES A, FITZPATRICK NUCLEAR P(XER FIANT AVERAGE DAIIX UNIT POWER 1EVEL DOCKER No. 50-333 UNIT nmATRICK DATE APRIL 1986 OWPIEIED BY JOHN COOK TELEPHONE (315)342-3840 FONIH MARCH 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1 802 17 0 2 800 18 0 3 801 19 0 4 801 20 0 5 801 _ _ _
21 0 6 802 22 0 7 798 23 0 8 802 24 0 9 801 25 0 10 801 26 0 11 802 27 0 12 801 28 0 13 709 29 0 14 12 30 0 15 0 31 251 16 0 SUMtdARY: The FitzPatrick plant operated at near full thenml powr for the first 13 days of the reporting period. On 860314 the unit was taken out of service for maintenance.
l I
JAMES A. FITZPATRICK NUCEAR POWER PUNr LNIT SHIJIDOWNS AND POWER REDUCTIONS
~
DOCKER NO. 50-333 LNIT NAME 'TTTHWfRIT-DATE APRIL 1986 REPORT M NIH MARCH 1986- 00MPLEIED BY JUm u m TEEPfDE (315)342-3840-D C UH R MEIN 0D S O RO E OF YC MC CAUSE AND 00RRECrlVE ACTIO!
AU A SHUITING LICENSEE SO PO 10 NO. DATE TYPE T R- S DOWN EVENT TD 0D PREVEITT RECURRENCE IS O THE REPOKr EE NE O N REACIOR M E N N T
1 860314 S 411.8 B 1 N/A N/A N/A SHUIDOLW FOR CONIROL ROD DRIVE MAINTDIANCE 1 2 3 4 F: FORCED REASON: METHOD: EXHIBIT G.- INSTRUCITONS S: SCHEDUIED A. EQUIPMENT FAIUJRE (EXPIAIN) 1-MANUAL FOR PREPARATION OF DATA B. MAINIENANCE OF TEST 2-MAhTAL SCRAM ENIRY SHEEIS FOR LICENSEE C. REFUELItc 3-AUIO'ATIC SCRAM EVENT REPORT (IIR) FIII D. REGUIATORY PESTRICTION 4-0IHER (EXPIAIN) (IRREG-0161)
E. OPERATOR SAINING AtB LICENSE ETRIIN.UIai F. AIMINISTRATIVE G. OPERATIONAL ERROR (EXPIADi)
H. OTHER (EXPIARI)
NARRATIVE
SUMMARY
OF.0PERATING EXPERIENCE MARCH 1986 The FitzPatrick plant operated at near full thermal power for the first thirteen days of the reporting period. On March 14 the unit was taken out of service for control rod drive maintenance. Startup commenced on March 28 and the plant was back on line on March 31.
At the end of the reporting peroid the unit is operating at approximately 251 MWe.
s u _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ __...__ _ __ __._________ _ ____________ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
NEW YORK POKER AUTHORITY -
JAMES A, FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
~
MARQI 1986 ACTION TAKEN REPAIR WORK REQUEST NO. HOW CAUSE OF RESULTS OF TO PRECLUDE '"IME -
DATE SYSTEM COMPONENT NO. DETECTED MALFUNCTION MALFUNCTION RECURRENCE HOURS 860311 00 036350 OPS DRIFT SENSORS READ HIGI NONE, READHES E RE 16 D/W SENSORS ACCURATE 860319 00 _039082 I&C P.M. ENSURE SPAN LINKS PERF0FFED IMP-TIS 30 FOX XMITR TIGfr:ATTS 860312 02 041145 OPS NO PROBLEM FDUND COMPlJrER PT READS ISP-78; READ RID 2 TE-107B2 IIM RES. N O W P Fr 860317 02 039090 I&C SIL-418 CHECK IIU YOLT AIMUSTED IIM NULTAGE 10 INV 801A,B CUT OFF, IRIP PT SET PORTF 860318 03 039684 OPS SWIIGI STICKS, PUSH BUTION REPAILED SWIIDI 3 RSPB 22-11 AGE /USE SELECTS VERY HARD 860315 03 038927 OPS DRIFT IIM PRESSURE NJ2M AIUUSIED SETPOINr; 12 HCU 10-31 SOUNDED IMP-3.5 860315 03 041681 OPS BAD SWTIUI; ROD SELECT SWrIGI REPLACED SWIIDI 3 RSS 10-43 AGE /USE NOT WOFXING 860318 03 041687 OPS RELAY 00U. ROD WIINDRWL HIJDCK REPIACED REIAY AND 18 ROD BIDCK BURNED OUT FOR NO RFASON RESISIOR
.NEW YORR POWER AUTHORITY ~ -
JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
~
MARCH 1986 ACTION TAKEN REPAIR WORK REQUEST NO. HOW CAUSE OF RESULTS OF "'O PRECLUDE TIME D/.TE SYSTEM COMPONENT NO. DETECTED MALFUNCTION. MALFUNCTION RECURRENCE . HOURS 860321 03 041690 OPS BAD TRANSISIOR, REFUEL INIERIDCK REPIACED BOIII 44 RSCS BAD PUSHBUTION LETS XTRA SELECT i
860322 05 032769 I&C MDD. M1-84-080 REPIACE S/D SCRAM CQ4PIErED WORK IN 42 05A-K17A,B RESET REIAYS F0DIFICATION 1
8603?2 05 032869 I&C FDD. M1-84-080 REPIACE BACK-UP CCNPIEIED WORK IN 29 5A-K2]A,B SCRAM REIAYS MODIFICATION 860325 05 039469 OPS NEW TRANSMITIER CHECK 11E CALIBRATED PER 6 PT-14 ABCD DATA CALIBRATION ISP-200A-D 860316 06 032788 I&C PACKING OUT OF Dtfu;nVE VALVES AIUUSIED PACKHU 2 PT-53A,B ADJUSINENT 860316 06 038468 I&C OUT OF ADJUSIMENT IEAKS THRU PACKING ADJUSIED PACKING 1 LT-52A 860316 06 039087 I&C SIL-418 CHECK IIM NOLTAGE AIUUSTED SETPOIhT 10 INV-A,B cur-OFF, TRIP PI 4
860319 06 030637 I&C COVER REMNED: WNCTIONAL TST PERE RMED ISP-3-4, 10 L/PT-52,53 BURNr ODOR NOTICED LT-52A/C Pt-53A ISP-5-4
NEW YORK POWER AUTHORITY -
JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE SUl&!ARY MARCH 1986 l ACTION TAKEN REPAIR
~ WORK REQUEST NO.
! HOW CAUSE OF RESULTS OF TO PRECLUDE TIFT DATE SYSTEM COMPONENT NO. DETECTED MALFUNCTION MALFUNCTION RECURRENCE HOURS 860225 07 023174 I&C DRIFT RECORDERS OUT OF AIUUSTED 2 PR-46A,B,D PROC. TOLERANCE 860312 07 030493 OPS EDUND OPERATING READING IIM 'IDR TRACE;I/V PWr; 6 LPRM 44-45B NORMALLY ~1 ram 860312 07 039668 OPS FOUND OPERATING DEFECIOR FAILED TDR TPACE;I/V PWr; 8 LPRM 36-21A NORMALLY DOWNSCALE Tun w 24 Hours 860313 07 030626 I&C BAD HIGH VOLTAGE INOP TRIP REPIACED HI VOLTAGE 3 IRM-B POWER SUPPLY FLUCIUATES I%ER SUPPLY 860313 07 032861 I&C BAD HIGH VOLTAGE INOP TRIP REPIACED HI VOLTAGE 6 IIbT-U- poler SUPPLY FLUCIUATES POWER SUPPLY 860313 07 039704 OPS BAD SWITG ON FAILED DOWNSCALE REPALCED SWITCH; IMP-7.6 6 LPRM 36-45A LPRM CARD 860319 07 032887 I&C WFAR HI VOLTAGE BNC REPIACE 00NNECIOR 3 IRM-G CONNECIOR BPIEEN 860323 07 041029 OPS MDISTURE; DIRTY DRIFTED FRm 5010 CLEANED 00tECIOR; 15 LPRM 44-37C CABIE CONNECIOR 58 TO 50 RAN TDR
s NEW YORK POWER AUTHORITY- .
JAMES A.'FITZPATRICK NUCLEAR POWER PLANT.
MAINTENANCE
SUMMARY
~
MARCH 1986 ACTION TAKEN- REPAIR WORK REQUEST NO. HOW CAUSE OF RESULTS OF -TO. PRECLUDE TIME DATE. SYSTEM COMPONENT NO. DETECTED MALFUNCTION MALFUNCTION . RECURRENCE HOURS 860323 07 041788 OPS- CABLE CONtECIOR READ UPSCALE CEANED CONNECIOR AND 16 LPRM 12-21A DIRTY DURING CRD RAN TDR MAINIENANCE 860324 07 041791 OPS }0ISTURE IN FAIED UPSCAE DRIED AND USED NEW HEAT 2 LPRM 20-21A WNNECIOR SIRINK 860325 07 041774 OPS }OISIURE DURING "A,C,D" DAMAGED CLEANED, APPLIED NEW 8 LPRM 20-37 CRD REPIACEMENT UHILE BfNING HEAT SHRINK 860325 07 041780 OPS BAD CABLE READS UPSCAE REPAIRED CABLE 16 LPRM 38-27A CONNECIOR CONNECIOR 860326 07 030633 I&C PREPARATION FOR REMNE TIP TUBING: RESIORED AFIFR CRD 78 TI N MAINTENANCE - TIE OFF CABE WORK CCEPLEIED 860327 07 041857 OPS BAD OP-AMP CARD LPRM IS DRIFFING REPUCED OP-AMP CARD 16 LPRM 20-21A 860304 10 030610 I&C TEST GAUGE USED NEEDS RECALIBRATED 7 FT-103 WAS OUT OF CAL RECALIBRATION 860305 10 036847 OPS NO PROBLEM FOUND ' VALVE CONIROLER N/A 5 PCV-69B AIR LEAK
NEW YORK POWER AUTHORITY -
JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
PARCH 1986 ACTION TAKEN REPAIR WORK REQUEST NO. HOW CAUSE OF RESULTS OF TO PRECLUDE TIME DATE SYSTEM COMPONENT NO. DETECTED MALFUNCTION MALFUNCTION RECURRENCE HOURS 860327 10 032891 I&C FAILED SWIICH FAILED REPIACED SWrIG 22 PS-120B DIAPHRAW DURING ISP-6 (M1-86-033) 860313 11 030552 OPS BAD lETER READS UPSCALE; REPIACE MEIER; 4 LI-46 NEEDS CALIBRATION ISP-82 860318 13 039089 I&C SIL-418 IN/HIGH VOLTAGE AIUUST IN VOLTAGE 6 INV-152 CUIDFF AND TRIP CUIDFF;SETPOINT 860318 17 032731 I&C AGE /WFAR BAIL GR&NEIS REPAILED GRafETS 4 RM-251-ABCD NEED REPIACItK; 860227 17 039844 OPS GAIN ON FDNITOR RECORDER READING REDUCED GAIN ON 4 BR-433 100 HIGH ERRATIC FDNITOR 860321 20 032863 I&C BAD AMPS R-18 AND INTEGRAIOR RUNS REPIACED AFTS, 20 FQ-530 C-1, SLIDERIRE C0YrINUOUSIX SLIDEWIRE 860316 23 032700 I&C P.M. ATTS INTERPOSING REPIACED REIAYS 4 A-K129/130 REIAYS 860317 23 038423 OPS VIBRATION NEEDLE BROKEN ON RESET IEEDLE, 7 PI-123A PRESSURF GAUGE CALIBRATED I I
NEW YORK POWER AUTHORITY -
JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
MARCH 1986 ACTION TAKEN REPAIR WORK REQUEST NO. HOW CAUSE OF RESULTS OF TO PRECLUDE TIME DATE SYSTEM COMPONENT NO. DETECTED MALFUNCTION MALFUNCTION RECURRENCE HOURS 860317 23 039088 I&C SIL-418 CHECK IN VOLTAGE AIUUSTED SETPOINT 6 INV-79 cur-OFF, TRIP Pr 860326 23 032894 I&C TRANSMITTER OUT XMIR AND TU CALIBRATED PER 6 PT-68D OF CALIBRATION INDICATE PRESSURE ISP-225B AT S/D 860228 2~; 037987 OPS BAD CH0PPER ERRATIC Drau;1vK REPIACED BAD CH0PPER 160 RM-104B RESPONSE 860310 27 034930 OPS NORMAL WEAR FLOR 00NTROL REPAIRED CALIBRATED 240 D/W AIR W N VALVES NEED CONTAIMENT AIR REPAIR ENITOR 860315 29 036196 JTS E.Q. UPGRADE N/A INSTALLED AND 16 PS-201/2AB CALIBRATED 860316 29 039850 OPS STRIPPED SWITCH 1RNGS UP REPIACED SWIICH ARM; 17 AOV-80B SWITCH ARM ISP-65-1 860316 29 041083 OPS N/A WILL NOT PICK UP PERFORMED ISP-65-1 9 LS-7 AT FULL OPEN SATISFACIORY 860320 71 030741' OPS DRIFT AMEIER FEADING AIUUSTED ZERO 10 INV-3A IN
NEW YORK POWER AUTHORITY -
JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE SU) DIARY MARCH 1986 ACTION TAKEN REPAIR WORK REQUEST NO. HOW CAUSE OF RESULTS OF TO PRECLUDE TIME D/6TE SYSTUI COMPONENT NO. DETECTED MALFUNCTION MALFUNCTION RECURRENCE HOURS 860314 76 038619 OPS DRIFT GAUGE NEEDS CALIBPATED CAUGE 4
'IK-10 CALIBRATION 860321 76 041708 OPS BAD POWER FIRE PROTECTION CHANGED POWER 8 FPP SUPPLIES PANEL IUr WRKING SUPPLIES 860315 93 030615 I&C N&TE OUT OF "C" SWIICHES RE-CALIBRATED PER 8 PS-5/13/14 CALIBRATION NEED IMP-93.1 RE-CALIBRTION 860315 93 030634 I&C M&TE OUT OF "A" SWrICHES RE-CALIBRATED PER 8 PS-5/13/14 CALIBRATION NEED IMP-93.1 RE-CALIBRATION 860319 93 033113 OPS FDD F1-84-041 VERIFY / CALIBRATE CALIBRATED 5 REL\YS TIME DEAY REIAYS 860323 93 030777 JMD " PUSH 'ID TEST" ENGINE FAULT AUSM AJDUST BUTION AND CAL; 3 EDG-C BUTION IUr RESET ON DIESEL C IMP-93.2 860317 02-3 032739 I&C AGE / WEAR ISOIATION VALVE REPIACED VALVE 36 N LEAIG C MANIFOID 860319 02-3 030638 I&C AS FOUND/LEFT FUNCTIONAL TEST PERFDRMED ISP-201B&C 3 LT-101B,C VOLTAGE > .10VDC REQUIRED
~
NEW1 YORK POUER AUTHORITY- -
- i,; ,
JAMES A. FITZPATRICK NUCLEAR ~ POWER PLANT MAINTENANCE
SUMMARY
MARCH 1986 ACTION TAKEN REPAIR
' WORK REQUEST NO. HOW CAUSE.GE RESULTS OF- .TO PRECLUDE TIME-DATE SYSTDI - COMPONENT NO. DETECTED MALFUNCTION MALFUNCTION RECURRENCE . HOURS, 860319 02-3 032724 I&C P.M. REPUCE IDOSE PERFORMED IMP-TIS 90 ROLTTRRIT TXMIT LEADS:ATTS 860321 02-3 038572 OPS- TRANSMEITER IDW INDICATES IDW, All1USTED TRANSMITTER 10 LI-86 OUT OF SPEC NO RESPONST 02-3 LT-61 LFREL CHANGE
NEW YORK POWER AUIHORITY JAMES A. FITZPA'IRICK NUCLEAR POWER PIANT SAFEIY REIATED ELECIRICAL & MECHANICAL MAINTENANCE StPHARY .
MARCH 1986 foTAIR WORK RMUEST f TIME DATE SYSTEM CCNP0FENT HOW DtThcrtu CAUSE OF MALFUNCTION ACTION TAKEN 'IO PRECLUDE RECURRENCE HOURS 3/21 16 41784 IIRT Ioose packing. Adjusted handwheel packing. 3 X
-____--______________'A ____________________________________-________________-_-_-__----____--_-_-_-__---_-_----_-__---__________
3/21 10 41754 OPS Bonnet Gasket Imak. Replaced gasket. 180 A0V-68A 3/19 34 30770 OPS Seat Imaks. Replaced valves. 61 JVS-14A &
15A 3/22 16 33112 OPS Irose Bolt, Retorqued bolt. 3 X-200B 3/23 71 S0761 Inspection Damaged Arc Chute. Replaced arc chute. 5 11516 3/23 03 27068 OPS Wom Seals. Replaced CRD mechanism. 50 50-35 3/23 03 27069 OPS Worn Seals. Replaced CRD mechanism. 60 50-27 3/23 03 39045 OPS Worn Seals. Replaced CRD mechanism. 55 50-19
__________-_______________-__________-_------_-_ -__---_________________________-------__-__--_____-_______--____======-_____.
3/23 03 25469 OPS Wom Seals. Replaced CRD mechanism. 50 42_11 3/23 03 40969 OPS Worn Seals. Replaced CRD mechanism. 60 26-03 3/23 03 41489 OPS Worn Seals. Replaced CRD mechanism. 60 18-23
____-_________________--_ ..________________-----_-_-_---_-________-_-________________===_-______. _-__ -----______-_----___ .
3/23 03 41482 OPS Worn Seals. Replaced CRD meclunism. 50 06-35
e NER YORK POWER AUIHORITY JAMES A. FITZPATRICK NUCUAR POWER PIANT SAFELY REIATED ELFLTRICAL & MECHANICAL MAINTENANCE SlM1ARY .
MARCH 1986 REPAIR WDRK REQUEST # TIME DATE SYSTEM CWPONENT HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE HOURS 3/23 03 41482 OPS Wom Seals. Replaced CRD mechanism. 60 10-39 3/23 03 41490 OPS Wom Seals. Replaced CRD mechanism. 50 14-35 3/23 03 25470 OPS Worn Seals. Replaced CRD mechanism. 50 26-51 3/23 03 25470 OPS Wom Seals. Replaced CRD mechanism. 60 34-31 3/23 03 41491 OPS Wom Seals. Replaced CRD mechanism. 50 w
w_JJ 3/23 03 40970 OPS Wom Seals. Replaced CRD mechanism. 50 26-31 3/23 03 27066 OPS Wom Seals. Replaced CRD mechanism- 60 34-43 s 3/23 03 40395 OPS Wom Seals. Replaced CRD mechanism._ 50 30-35 3/23 03 27067 OPS Wom Seals. Replaced CRD mechanism. 50 30-39 3/23 03 40357 OPS Failed Reed Switches. Replaced PI Probe. 6 46-11 3/23 03 39502 OPS Failed Reed Switches. Replaced PI Probe. 5 34-35 3/23 03 40358 OPS Failed Reed Switches. Replaced PI Probe. 5 14-19
NEW YORK POWER AUIHORITY JAMES A. FITZPATRICK NUCEAR POWER PIANT SARTY REIATED ELECIRICAL & MECHANICAL MAINIENANCE SIMRRY .
MARCH 1986 nrEAIR WORK REQUEST # TDE DATE SYSTEM C@20NENT HOR DETECTED CAUSE OF MAIRJNCTION ACTION TAKEN 10' PRECLUDE RFLURRENCE H0t.RS 3/23 03 38906 OPS Failed Reed Switches. Replaced PI Probe. 2 42-07 3/23 03 38925 OPS Failed Reed Switches. Replaced PI Probe. 2 06-31 3/23 03 38944 OPS Failed Reed Switches. Replaced PI Probe. 2 30-07 3/24 71 30772 OPS Failed Card A-3. Replaced A-3 card. 4 INV-3B
_________________________________________________________________________________________________________________________=
3/24 03 30773 OPS Failed Reed Switches. Replaced PI Probe. 5 50-19 3/26 10 38594 OPS Seat Imak. Replaced valve. 30 RHR-712 3/26 29 41753 OPS Pressure Seal Imak. Replaced pressure seal. 80 t0V-74 3/26 33 39035 OPS Worn Packing. Replaced packing. 12 F0V-16 3/26 13 35188 OPS Worn Packing. Replaced packing. 8 RCIC_697
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - === ______.
3/18 02-2 38965 OPS Wom Packing. Replaced packing. 8 F0V-54B 3/30 23 21220 OPS Stuck overspeed trip Remnved burr from trip weight. 24 TU-1 device.
3/27 12 37043 OPS Worn Packing. . Replaced packing. 6 bOV-15
_________________________________________== =-- ====________________________==-- ____________________________________________.
NER YORK POWER AUINORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT .
SAFELY REIAIED ELECIRICAL & MECHANICAL MAINIENANCE SlfNARY' :.
MARCH 1986 REPATR WORK REQUEST f TINE DATE SYSTEM C(NPONENT HOR Duuntu CAUSE OF MALFLNCTION ACTION TAKEN 'IO PRECIUDE RECURRENCE HOURS 3/23 13 37611 OPS- Worn Packing. Replaced packing. 3 POV-131 3/23 23 27888 OPS Worn Packing. Replaced packing. 10 HPI_898 3/26 20 30781 OPS Gear Limit Switch Adjusted gear limit switch. I 1%V-82 out of adjustment.
3/24 03 41715 OPS Failed position Replaced PI probe. 43 50-19 indication.
3/15 34 41768 OPS Failed SOV. Replaced SOV. 16 SOV-Illa 3/23 03 41709 OPS Failed PI Probe. Replaced PI probe. 14 30-35
J: me) A. FitzP; trick Nucle:r Power Plant PO Bos 41 Lycoming. New York 13093 315 342.3840 Radford J. Converse
- > NewYorkPower
(# Authority April 10, 1986 JAFP 86- 0296 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ATTENTION: DOCUMENT CONTROL DESK
REFERENCE:
DOCKET NO. 50-333
Dear Sir:
Enclosed please find the J. A. FitzPatrick Operating Status Report for. the month of March, 1986. Refueling information remains the same as previously submitted.
If there are any questions concerning this report, please contact John Cook at (315) 342-3840, Ext. 439.
/ aaan RADFORD J. CONVERSE RESIDENT MANAGER RJC:J :mac Enclosures cc: Distribution rE2M ljg