OPERATING DATA REPORT DOCKET NO. 50-333 DATE JUNE 1985 COMPLETED 15Y J. Cook TELEPHONE (315)342-3840

_0PERATING STATUS

1. Unit Name: FtizPatrick  : Notes  :
2. Reporting Period: 850501 - 850531  :  :
3. Licensed Thermal Power (MWt): 2436  :  :
4. Nameplate Rating (Gross MWe): 883  :  :
5. Design Electrical Rating (Net MWe): 821  :  :
6. Maximum Dependable Capacity (Gross MWe): 830  :  :
7. Maximum Dependable Capacity (Net MWe): ~8IU-"~
8. If Changes Occur in Capacity Ratings (Items 3 Through 7) Since Last Report Give Reasons:

NONE

9. Power Level To Which Restricted, If Any (Net MWe): NONE
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 743 3623 86304
12. Number Of Hours Reactor Was Critical 66.9 1163./ 0U//9./
13. Reactor Reserve Shutdown Hours 0 0 0
14. Hours Generator On-Line 0 1096.6 39U44.1
15. Unit Reserve Shutdown Hours 0 0 U
16. Gross Thermal Energy Generated (MWH) 960 2339/9z 1z3493/40
17. Gross Electrical Energy Generated (MWH) O B/3930 43134221U
18. Net Electrical Energy Generated (MWH) U 543b3) 4124300U
19. Unit Service Factor 0 30.3% 05.4%
20. Unit Availability Factor 0 3U.3% 06.4%
21. Unit Capacity Factor (l' sing MDC Net) , O Z5.54 bz.UI
22. Unit Capacity Factor (Using DER Net) 0 25.4% 35.zI
23. Unit Forced Outage Rate 0 0 13.3%
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup: June 1, 1985
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8506180319 850531 DR ADOCK 050 3 ghh I((f

I

, l

, AVERAGE DAILY UNIT POWER LEVEL l

l 1

l DOCKET NO. 50-333 l UNIT FitzPatrick

, DATE June 1985 COMPLETED BY J. Cook TELEPHONE (315)342-3840 MONTH May 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 17 2 18 3 19 4 20 5 21 6 22 7 23 8 24 9 25 10 26 11 27 12 28 13 29 14 30 15 31 16

SUMMARY

The FitzPatrick plant remained shutdown for this reporting period.

m . ._. . _ _ _ . --_ -.-_._ ._. _ _ . . . _ . . _ . . - _ - . , _ . _ . .

v.

UNIT SHUTDOWNS AND F0WER REDUCTIONS DOCKET NO. 50_-333 *

' UNIT NAME YitzPatrick

  • DATE June 1985 i REPORT MONTH MAY 1985 COMPLETED BY J. Cook TELEPHONE (315)342-3840 h

E :2: - LICENSEE b#ca ra CAUSE & CORRECTIVE >

NO. DATE $ }$ @ @U EVENT .M $ $$ ACTION TO U gh h .$ REPORT # $" PREVENT RECURRENCE 3 850214 S 743 C 3 85-006 TB N/A Shutdown for refueling (cumulative hours 2526.2) l 2

1 2 3 4 F: Forced Reason: Method: Exhibit G. Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Peparation of Data B-Maintenance of Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File NUREG

, D-Regulatory Restriction 4-Other(Explain) 0161 i E-Operator Training & License Examination F-Administrative G-Operational Error (Esplain)

H-Other(Explain)

]

i

. J/JiES A'. ' FII2 PATRICK NUCLEAR POWER PLANT POWER AUTil3RITY OF Ti1E STATE OF NEh* YORK REFUELING INFOT0!ATION

1. The date of the next scheduled refueling outage is October ,19_86_ .-
2. The scheduled date for restart following refueling is June ,19 85 .
3. Will refueling or resunption of operation thereafter require a technical specification change or other license amendment?

YES x If yes, describe in general what these will be and go to question S.

New }iaximum_ Average Pinnnr TAnaar Heat Generation-Rate-and-new-Minimum-Gritical-Powet

_ Rat.io_ Limits . - _ -

. N0_ If no, answer question 4. .;

-4. ANSWER ONLY IF ANSWER TO 3. AE0VE IS NO.

lias the reload fuel design and core configuration been reviewed by the Plant Safety Review committee to determine whether any unreviewed safety questions are associated

, with the core reload (Ref.10 CFR Section 50.59)?

YES NO The next scheduled review date is ,19 .

S. ANSWER ONLY IF ANShER TO 3. ABOVE IS YES.

The scheduled date for submitting proposed licensing action and supporting information is January ,19 85 -

6. Answer the following important licensing considerations YES NO a)_ New fuel design? 2 _

b) New fuel supplier? 1 c) Are there any new unreviewed design or performance analysis methods? g d) Are there any new operating procedures? X e) Other Specify:

7. There are normally 560 fuel assemblies in the core during operation, presently there are y L n ithe core.

'8. a) There are 1012 fuel assemblies of the licansed allowable 2244_in the spent fuel pool.

b) An increase in the licensed storage capacity:

is not being contemplated at this time.

X is not planned at this time, for an additional fuel assemblics.

has been requested for an additional _ fuel assemblies.

9. January ,19 90 is the last possible refueling date t hat can be projected at this time given the presently licensed spent fuel pool stor. ige capacity.

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE MAY 1985 The FitzPatrick plant remained shutdown for this reporting period. A reactor startup was commenced on May 28, 1985 for post outage testing with expected generator on line to be June 1, 1985.

~

NEW YORK POWER AUT110RITY - JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

MAY 19R5 ACTION TAKEN REPAIR WORK REOUEST NO. HOW CAUSE OF RESULTS OF TO PRECLUDE TIME DATE SYSTEM COMPONENT NO. DETECTED MALFUNCTION MALFUNCTION RECURRENCE HOURS 850517 02 036768 OPS POSSIBLY LEAR PEGGED HI USE IMP-2-3.1 TO 6.0 02-3-078G TESTING CHECK CALIBRATION 850502 02 038671 I6C N/A SIDE COVER THREATS CHASED TilREADS WITH 2 DPT-119A ARE ROUGH THREAD CHASER 850527 02 039588 OPS WIRING ERROR PRE-AMP BIAS WIRING CORRECTED 2.5 VMC-71A DURING MOD WON'T ADJUST TO PRINTS 850527 02 039588 OPS WIRING ERROR PRE-AMP BIAS WIRING CORRECTED 2.5 VMC-71B DURING MOD WON'T ADJUST TO PRINTS 850527 02 039588 OPS WIRING ERROR PRE-AMP BIAS WIRING CORRECTED 2.5 VMC-71C DURING MOD WON'T ADJUST TO PRINTS 850524 02 023246 JIC ACOUSTIC DETECTORS CHANNELS FAILED ELECTRICIANS REPLACED 6 VMC-71F/G FAILED F-ISP-92-1 DETECTORS 850523 02 039562 OPS TIMERS DRIFTED TIMERS OUT OF RE-ADJUSTED FOR 2 2A-KSA/B ADJUSTMENT CORRECT TIME 850504 02-3 033868 OPS N/A REPLACE GAUGES CALIBRATE CAUGE AND 8 PI-60A/B W/0-3000 GAUGES INSTALLED ON TEST VALVE i

NEW YORK POWER AUTHORITY - JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

MAY 1985 ACTION TAKEN REPAIR WORK REOUEST NO. HOW CAUSE OF RESULTS OF TO PRECLUDE TIME DATE SYSTEM COMPONENT NO. DETECTED MALFUNCTION MALFUNCTION RECURRENCE HOURS 850504 02-3 036654 I&C UNKNOWN CARD CAUSING OUT PERFORMED IMP T-13, 12 MTU-234B 0F FILE ALARM INSTALLED 850506 02-3 036683 OPS PRINTER AND PT NOT PRINTING /PT ADJUSTED PRINTER AND 21,5 TR-89 ASSEMBLY OUT OF ID OUT OF SYNC PT ASSEMBLY 850502 02-3 038670 I&C LOOSE LOCK-NUT ON HEAD (ELECTRONIC) TIGHTENED LOCK-NUT 4 PT-52D TRANSMITTER HEAD IS LOOSE 850510 02-3 032661 JIC N/A CHECK OPERATION NONE CHECKED OK 10 TE-66Al,B1 0F TE 850510 02-3 032661 JIC N/A CHECK OPERATION REPLACED "A" SFCTIONS 50 TE-66A2,B2 0F TE OF BOTH 850528 02-3 032689 JIC EVAPORATION OF B LEVEL INDICATES BACK FILLED LEG 8 LI-94B REFERENCE LEG HIGH 850526 02-3 032687 JIC NOT DETERMINED TRIP UNIT FAILED REPLACED TRIP UNIT 3 STU-253C AT THIS TIME TO TRIP 850518 02-3 023236 JIC VALVES EXTEND VENT VALVE li EXTENDED VALVES 8 LIS-101B INACCESSABLE

NEW YORK POWER AUTHORITY - JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

MAY 14RS ACTION TAKEN REPAIR WORK REQUEST NO. HOW CAUSE OF RESULTS OF TO PRECLUDE TIME DATE SYSTEM COMPONENT NO. DETECTED MALFUNCTION MALFUNCTION RECURRENCE HOURS 850531 02-3 039616 OPS DAMAGED SEAT LEAKY VENT VALVE REPLACED VALVE 10 LT-85B 850516 03 036805 OPS N/A REPLACE K41 IN REPLACED K41 IN 4 K41 CABINET 9-28 PANEL 9-28 850520 03 039531 OPS LIGHT BLOWN MOD LIGHT FOR REPLACED MOD LIGHT 3 14-39 LITE ROD DISPLAY 850518 03 036813 OPS COLD SOLDER JOINT ROD 46-23 WON'T RESOLDERED CONNECTION 2 P.B. 46-43 ON PUSH BUTTON SELECT 850528 03 039597 OPS FAILED MODULE FULL OUT REPLACED FULL OUT 2 38-07 INDICATION MODULE INOPERABLE 850527 03 039587 OPS DRIED OUT PIPE NITROGEN LEAK AT REPLACED 0 RING / 14 HCU-14-43 DOPE /0 RING PI ON HCU CLEANED FITTINGS 850514 03-800 034645 OPS SWITCH WORN CR SELECT PUSH- REPLACED SWITCH, 2 CR SEL MTX BUTTON NOT WORK CHECKED OK 850513 03-800 034513 OPS SWITCH WORN CR SELECT PUSH- REPLACED SWITCH, 2 CR SEL MTX BUTTON NOT WORK CHECKED OK

NEW YORK POWER AUTHORITY - JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

MAY 14R5 ACTION TAKEN REPAIR ,

WORK REOUEST NO. HOW CAUSE OF RESULTS OF TO PRECLUDE TIME DATE SYSTEM COMPONENT NO. DETECTED MALFUNCTION MALFUNCTION RECURRENCE HOURS 850501 06 038679 I&C BAD TRANSMITTER POWER SUPPLY FUSE DISMOUNTED AND REPLACED 10 LT-52B BLOWS TRANSMITTER 850517 06 034278 OPS GEARS AND BUSHINGS CHART DOES NOT CLEANED AND LUBRICATED 28 PR/FR-98 BOUND UP ADVANCE 850506 07 027895 OPS BAD DETECTOR SPIKING REPALCED DETECTOR AND 140 NM-41A AND GEAR BOX ERRATICALLY GEAR BOX DURING START 850506 07 036678 OPS DIRTY CONTACTS WILL NOT DRIVE CLEANED CONTACTS ON 6

, NM-31C K9C and K2 850507 07 033778 OPS DRIFT CR IND. AND SRM PERFOPJfED STEPS 5.15 0F 4 SRM B IND. READS DIFF. IMP-7.1 850520 07 036887 OPS ADJ PER OPS FOR COUNT CIRCUIT NOT RE-SET SET POINT 1.5 APRM A LPRM REPLACEMENT AT SETPOINT 850420 07 033775 OPS DRIFT COUNT CIRCUIT ADJUSTED FOR PROPER 2 APRM D READS LOW OUTPUT 850520 07 033793 OPS SET PER OPS FOR COUNT CIRCUIT RE-SET TO NORMAL VALUE 2.5 APRM F LPRM REPLACEMENT SET LOW

NEW YORK POWER AUTHORITY - JAMES A. FITZPATRICK' NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

MAY 14R9 ACTION TAKEN REPAIR (

WORK REOUEST NO. HOW CAUSE OF RESULTS OF TO PRECLUDE TIME DATE SYSTEM COMPONENT NO. DETECTED MALFUNCTION MALFUNCTION RECURRENCE HOURS 850516 07 034620 OPS AGE FAILED DETECTORS REPLACED LPRM STRING 44 LPRM 12-13 IN STRING 850516 07 034622 OPS AGE FAILED DETECTORS REPLACED LPRM STRING 41.5 LPRM 36-05 IN STRING 850516 07 034623 OPS AGE FAILED DETECTORS REPLACED LPRM STRING 61.5 LPRM 36-21 IN STRING 850516 07 034624 OPS AGE FAILED DETECTORS REPLACED LPRM STRING 56.5 LPRM 20-29 IN STRING 850516 07 034621 OPS AGE FAILED DETECTORS REPLACED LPRM STRING 41.5 LPRM 20-45 IN STRING 850528 07 036831 OPS SERVO MOTOR BLACK PEN IS CLEANED / LUBRICATED 10 PR-46D BOUND UP DRIFTING MOTOR 850509 07 038673 JIC NEUTRON IRM E,H,G,D/SRM C REPLACED DRY TUBES 680 DRY TUBES EMBRITTLEMENT CRACKED TUBE 850525 07 039581 OPS BURNED OUT BULB D TIP EALL VALVE REPLACED BULB AND FUSE 12 D TIP BVLV

NEW YORK POWER AUTIIORITY - JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

MAY 1985 ACTION TAKEN REPAIR WORK REOUEST NO. I!OW CAUSE OF RESULTS OF TO PRECLUDE TIME DATE SYSTEM COMPONENT NO. DETECTED MALFUNCTION MALFUNCTION RECURRENCE HOURS 850523 07 023028 JIC ROUTINE REMOVE AND REPLACED AS REQUIRED 239 TIP TUBING MAINTENANCE REPLACE TUBINE 850526 07 123244 JIC LOSS OF GROUND IRM H IS READING GROUNDED PRE-AMP 20 IRM H TO PRE-AMP HIGH PROPERLY 850522 07 238668 JIC SRM DRIVEN INSPECT / REPAIR ADDED EXTRA CABLE GUARD 20 SRM B INTO PLATFORM CABLE CONNECTOR 850523 07 035556 OPS SEAT WEAR BALL VALVE LEAKED REPLACED BALL VALVE 18 C TIP BVLV DURING LLRT 850523 07 036804 01S LOOSE CONNECTOR SRM SPIKING REPAIRED CONNECTOR 20 SRM D AT PRE-AMP UPSCALE 850523 07 038669 JIC DRIVEN INTO INSPECT UNDER TIGHTENED CONNECTOR 20 l SRM D PLATFORM VESSEL CABLES 850506 09 032680 I&C BAD CONTACTS ON WILL NOT LATCH FIXED CONTACTS 6 09-96-Z3 BOARD CONNECTOR LED WHEN TRIPED 850503 09 036657 JIC NOT DETERMINED AT Z1 CALIBRATOR IS REPLACED CALIBRATION 2 PNL 9-95 THIS TIME INOPERABLE UNIT

~

NEW YORK POWER AUTHORITY - JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

MAY 14R9 ACTION TAKEN REPAIR WORK REQUEST NO. HOW CAUSE OF RESULTS OF TO PRECLUDE TIME DATE SYSTEM COMPONENT NO. DETECTED MALFUNCTION MALFUNCTION RECUP,RENCE liOURS 850521 09 032684 JIC UNDETERMINED AT 9-93 Z1 REPLACED CALIBRATION 2 CAL UNIT THIS TIME CALIBRATION UNIT UNIT HAS NO STOP 850503 10 034301 I&C INSTRUMENT MODULE SENDS SPURIOUS REPLACED WITH NEW 14 TE-104A FAULTY ALARMS TO APP #2 THERMOCOUPLE 850521 10 036839 OPS OUT OF ADJUSTMENT SWITCH INDICATINC MADE GAIN ADJUSTMENT 6 LS-102 IMPROPERLY 850521 10 036837 OPS OUT OF ADJUSTMENT SWITCH INDICATING MADE GAIN ADJUSTMENT 6 LS-100 IMPROPERLY 850521 10 036838 OPS FOUND BAD RELAY SWITCH INDICATING REPLACED RELAY 6 LS-104 IN CIRCUITRY IMPROPERLY 850523 10 029192 JIC DCAR 84-146 INSPECT WIRING IN INSPECTED SATISFACTORIL7 1 LS-100 SWITCHES 850523 10 029192 JIC DCAR 84-146 INSPECT WIRING IN INSPECTED SATISFACTORIL' r 1 LS-101 SWITCHES 850523 10 029192 JIC DCAR 84-146 INSPECT WIRING IN INSPECTED SATISFACTORIL' '

1 LS-102 SWITCHES

NEW YORK POWER AUTHORITY - JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

MAY 1985 ACTION TAKEN REPAIR WORK REOUEST NO. HOW CAUSE OF RESULTS OF TO PRECLUDE TIME DATE SYSTEM COMPONENT No. DETECTED MALFUNCTION MALFUNCTION RECURRENCE HOURS 850523 10 029192 JIC DCAR 84-146 INSPECT WIRING IF ROTATED 90 DEGREES 1 LS-103 SWITCHES 850523 10 029192 JIC DCAR 84-146 INSPECT WIRING IF ROTATED 90 DEGREES 1 LS-105A SWITCHES 850523 10 029192 JIC DCAR 84-146 INSPECT WIRING IN ROTATED 90 DEGREES 1 LS-105B SWITCHES 850523 10 029192 JIC DCAR 84-146 INSPECT WIRING IN INSPECTED SATISFACTORIL i 1 LS-104B SWITCHES 850523 10 029192 JIC DCAR 84-146 INSPECT WIRING IN INSPECTED SATISFACTORIL F 1 LS-104A SWITCHES 850520 13 036711 OPS WIRING ERROR UNABLE TO RESET CORRECTED ERROR 36 AK33 IN 09-21 PANEL RCIC ISOLATION 850530 13 039412 OPS MECHANICAL GOVERNOR FAILED ELECTRONICS SAT /SENT 3 RCIC GOV. TO TAKE CONTROL WR TO MAINTENANCE 850528 13 039650 OPS SWITCH OUT OF HIGH TEMP ALARM CALIBRATED SWITCH 8 TS-1 ADJUSTMENT AT NORM TEMP

_ _ m

NEW YORK POWER AUTHORITY - JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

MAY 1985 ACTION TAKEN REPAIR WORK REOUEST NO. HOW CAUSE OF RESULTS OF TO PRECLUDE TIME DATE SYSTEM COMPONENT NO. DETECTED MALFUNCTION MALFUNCTION RECURRENCE HOURS 850528 13 039401 OPS RELAY COIL WIRE PWR SUPPLY LANDED LEAD PER MOD 2 2F-K1B LANDED WRONG FAILURE ALARM ON F1-82-053 850524 13 023245 JIC DAMAGED DURING CONNECTOR TO EGR REPLACED CONNECTOR 3 EGR TURBINE MAINT. IS BROKEN 850524 13 023240 JIC DAMAGED DURING BROKEN WIRES AT REPAIRED WIRES 7 SPEED P/UP TURBINE MAINT. PICK UP 850521 13 023189 JIC MOD F1-84-080 REPLACE RELAYS REPLACED / TESTED RELAYS 130 HFA RELAYS 850512 14 036718 OPS BROKEN WIRE ON HI PRESS LEAK REPAIRED WIRE /RAN 6.0 PS-47A TERNIMAL A ALARM NOT IMP-14.1, OK ANNUNCIATING 850318 16 034648 OPS BREAKER FOR POWER IND ON GRAPHIC NONE TAG 85-0162 VALID 6 GRAPH DISP OPEN DISPLAY INOP 850510 16-1 033718 OPS N/A CALIB RTD's IN COMLT 16-1-RTC-101-112 80 101 & 117 ACCORD W/ PRE-OP 117-120 850518 16-1 032683 JIC LEADS SHORTED IN RTD INDICATES A REPAIRED SHORT 6 RTD-103 CONNECTION BOX NEGATIVE TEMP

NEW YORK POWER AUTHORITY - JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

MAY 1985 ACTION TAKEN REPAIR WORK REOUEST NO. HOW CAUSE OF RESULTS OF TO PRECLUDE TIME DATE SYSTEM COMPONENT NO. DETECTED MALFUNCTION MALFUNCTION RECURRENCE HOURS 850520 17 036853 OPS BLACK PEN OUT GREATER THAN 10% CALIBRATED 3 RM-050A 0F CALIBRATION DIFF BETWEEN MONITOR & RECORD 850527 17 036846 OPS LOOSE PEN ON REC FAILED F-ST-11 REPAIRED / CALIBRATED 15 RM-150B OUT OF ADJUSTMENT 850523 17 036852 OPS VOLTAGE REGULATOR METER IS REPLACED REGULATOR 6 RM-050B SHORTED DOWNSCALE 850502 23 029106 I6C BAD RELAY, SOCKET COIL APPEARS OPEN REPLACED: RELAY, 22 23A-K119B AND DIODE SOCKET, DIODE 850521 23 035588 JIC MOD F1-84-080 REPLACE RELAYS REPLACED / TESTED RELAYS 150 HFA RELAYS 850526 27 035192 JTS NEW INSTALLATION CALIBRATE CALIBRATED RECORDERS 20 PCR-101A/B MOD F1-84-003 RECPRDERS 850527 27 036324 JTS MOD F1-84-024 PERFGRM LOOP LOOP CHECKED 24 E/P-103A/B CHECK 850522 29 039563 OPS NEW MODULE NEEDED SLOW CLOSURE TOO ADJUSTED AS REQUIRED 4 A0V-86A/D ADJUSTMENT SLOW

NEW YORK POWER AUTHORITY - JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

MAY 1985 ACTION TAKEN REPAIR WORK REOUEST NO. HOW CAUSE OF RESULTS OF TO PRECLUDE TIME DATE SYSTEM COMPONENT NO. DETECTED MALFUNCTION MALFUNCTION RECURRENCE HOURS 850522 29 036848 OPS OUT OF ADJUSTMENT FAST CLOSURE TOO ADJUSTED SPEED AS 1 A0V-80C SLOW REQUIRED 850520 30-1 040877 OPS DROPPED NEEDS NEW PROBE E REPLACED CHAMBER 6 11 CHAMBER CAL ROOM AND METER 850503 66 033860 OPS SCREWS LOOSE ON CHECK OPERATION TIGHTENED SCREWS ON 6 RELAY 62C RELAY OF RELAY RELAY 850503 71 023195 I6C FAULTY K4 RELAY REMOVE RELAY AND REPLACED RELAY AND 16 10042 BRKR ON TC-778 BOARD TROUBLESHOOT TESTED OK 850501 76 025075 SEC BAD MAGNET SUPPORT AIR LOCK DOOR IN REPLACED SCREWS IN 4 DOOR 204 SCREWS REACTOR BUILDING MAGNET SUPT 850531 76 033825 OPS FAILED EXTENDER SPURIOUS REPLACED TRANSMITTER 8 ZONE 41 MODULE SUPERVISORY EXTENDER ALARMS

NEW YORK POWER AUIHORITY -

.. JAMES A. FITZPATRICK NUCLEAR POWER FIANT SAFELY RELATED ELEC1RICAL & MECHAMCAL PAINIENANCE SlWARY

  • PAY 1985 REPAIR WORK REQUEST f TIME DATE SYSTFM C WPONENT HOR Dhar m o CAUSE OF PAIRJNCTION ACTION TAKEN 'IO PRECLUDE RECURRENCE HOURS 3/8 10 35560 11RT Seat Irak Lapped seat and disc. 142 NOV-26A 3/1 10 36872 OPS Faulty torque switch Replaced torque switch. 6 MOV-17 2/23 02 35409 IlRT Seat IEak Lapped seat and disc. Replaced 25 RWR-13A spring.

4/30 03 33782 OPS Packing Irak on 111 Repacked 111 valve. 1 HCU 38-27 valve 4/30 03 36660 OPS Packing Irak on 111 Repacked 111 valve. 1 HCU 22-23 valve 4/30 03 36661 OPS Packing Irak on 111 Repa; led 111 valve. 1 HCU 26-27 valve 5/7 03 22603 Hydro 0-ring Irak Re-torqued. 2 CRD-14-27, 22-07, 14-19, 46-35, 38-35, 18-35 4/19 02 35412 IJRT Seat Irak Replaced valve. 120 RWR-14B 5/5 23 33893 LLRT Seat Irak Lapped seat and disc 159 HPI-12 3/8 23 35418 LIRT Body to bonnet leak Replaced bonnet gasket; cleaned 60 HPI-11 internals.

5/5 20 36234 N/A No Malfunction deplaced solenoid and position 26 A0V-83 indication switches per M1-84-098.

4/17 20 36235. N/A No Malfunction Replaced solenoid and position 20 A0V-95 indication switches per M1-84-098.

~

NEW YORK P0(ER AUIHORITY -

JAMES A. FITZPATRICK hTCLEAR poler PIMr SAFETY RELATED ELECTRICAL & FECHANICAL FAINIENANCE SlM4ARY MAY 1985 REPAIR kORK REQUEST # TIME DATE SYSTEM C&PONENT HOW Dtu ato CAUSE OF MALFL'NCTION ACTION TAKEN TO PRECLUDE RECURRENCE HOURS 5/2 14 33443 OPS Iraking solenoid Replaced solenoid. 6.5 A0V-13B valve 5/1 13 21103 OPS loose Packing Adjusted packing. 2 RCI-703 & 704 3/12 13 35408 LLRT Body to Bonnet Iapped seat and disc; repaired 337 MDV-15 Leakage steam, cut in bonnet, repacked.

5/9 10 34252 OPS Broken Stem Replaced stem. 4 RHR-756A 5/8 10 27108 OPS Leaking Solenoid Valve Replaced solenoid. 13 A0V-68B 5/1 93 27123 N/A No Maltunction Preventive Maintenance. 704 EDG-B 5/1 93 27124 N/A No Malfunction Preventive Maintenance. 721 EDG-D 5/2 93 35428 OPS Ioose Fittings Repaired air leaks. 271 EDG-A,B,C & D 4/25 29 38665 Pressure Seat Leak Peplaced valve. 10 1 PST-1002B Test 4/25 29 38666 Pressure Seat Irak Replaced valve. 10 MST-1002C Test 3/26 27 35421 LIRT Seat Leak Replaced internals. 30 A0V-131A I

l 5/8 27 35575 LIRT Seat Irak Replaced valve. 74 SOV-125B l

l

}

~

NEW YORK POWER AUIHORITY J/FES A. FITZPATRICK NUCLFAR IGER FIAhT SAFEIY PEIATED ELECIRICAL & FECHANICAL PAINIUMNCE SIM4ARY -

FAY 1985 REPAIR kORK REQ 1EST # TIFE DATE SYSTEM C&PONENT HOW DETECIED CAUSE OF MALFUNCITON ACTION TAKEN TO PRECILDE RECURRENCE HOURS 5/22 23 35416 LIRT Packing Irak Repacked, repaired operator. 126 F0V-59 5/4 23 35417 IJRT Seat Leak Ground seat and disc. 245 HPI-65 5/2 10 & 27 25428 N/A No Malfunction Replaced carbon steel cotter pin 12 10SV-74A & B with stainless steel cotter pin per 27SV-113 NRC I.E. 84-33 5/5 46 35574 IJRT Seat Irak Impped disc and seat. 19 ESW-16A 3/28 46 35484 OPS Unreliable E.C. Replaced E.C. devices. 13 P-2A Devices 3/6 46 23875 N/A No Malfunction Disassarbled and reassaabled 4 ESW-16B for temporary d.w. cooling.

5/2 71 22696 OPS Unreliable E.C. Replaced E.C. devices with solid 44 Circuit Bkrs: Devices state devices per F1-85-033.

12510 & 12610 4/29 71 22698 Visual Maintenance in Area Cleaned batteries. 20 SB-1A & IB

5/2 71 21079 N/A No Malfunction Provide temporary p mer during bus 2 IBC-3 & 4 maintenance.

5/7 29 22504 Visual Irose Packing Adjusted packing. 2 FDV-102 5/3 93 27133 Visual Vibration Installed new brushes and tightened 2 EDG-D holders.

NEW YORK POPER AUmORITY

. JAMES A. FITZPAIRICK NEX1FAR POLIR FIANT SAFETY RELATED ELECIRICAL & MECHANICAL MAINITRfECE SlWARY

  • FAY 1985 -

REPAIR kORK REQUEST f TIME DA'IE SYSTE CTPONFRT IKE DETECTED CAUSE OF MALFUNCI' ION ACTION TAKEN 'ID PRECLUDE RECURRENCE FOURS 5/13 15 22704 OPS Overtorqued using Replaced broken drive sleeve cap. 8 F0V-103 handwheel 5/13 71 22705 Alarm Dirt in fan motor Imbricated fans, 46 INV-3A bearings 5/13 10 28616 OPS Loose Iamitorque Torqued bolts. 8 F0V-25A mounting bolts 5/13 10 35493 OPS Oil Contaminated with Peplaced oil. 24 P-IC Water 5/8 29 23582 Visual Packing Leak Adjusted packing 2 A0V-80D 5/13 29 23883 Visual Packing leak Repacked valve. 16 A0V-80C 5/11 27 36774 OPS No Position Indication Installed new position indicator. 2 A0V-118 5/11 29 22619 Visual Packing Leaks Adjusted packing. 2 A0V-80A & B 5/10 10 34251 Visual Packing Ieaks Replaced stem and bonnet. 3 PER-755A 5/9 34 35562 LLRT Seat Irak Replaced valve seat. 951 NRV-111B 5/13 23 36669 Testing Motor Failure Replaced motor. 40 FDV-58 5/14 29 37322 Hydro Packing Ieak Packing adjustment. 3 F0V-102

NEW YORK PGIR AUIFORITY

.. JAMES A. FITZPATRICK NUCIFAR POWER PIR4T SAFEIY REIATED ELECIRICAL & MECIMNICAL PAIhTENANCE SD2'ARY FAY 1985 REPAIR LORK RECEST # TIME DATE SYSIE4 C&PONENT 110W DETECTED CAUSE OF PALFLUCTION ACTION TAKEN TO PRECLUDE RECUPPERCE TERS 5/14 12 22703 OPS Drive Sleeve Gear Repaired Limitorque. 76 F0V-80 Failure 5/17 10 23885 OPS Bent Inpeller Shaft Ecpaired shaft. 228 P-IC 5/17 76 35518 OPS Packing Irak Repacked pump. 48 P-2 5/17 12 22606 Hydro Packing Irak Adjusted packing. 2 FDV-15 5/17 10 23886 Hydro Gasket Irak Replaced gasket. 108 AOV-68A 5/17 27 33760 OPS Limit Switch Failure Replaced limit switch. 30 AOV-116 5/17 71 22707 OPS Breaker Will Not I11bricated latch monitor switch. 4 10650 Charge 5/17 10 36783 OPS Torque Switch Setting Adjusted torque switch. 5 FDV-89B 5/17 10 23231 OPS Seat Iraks Repaired valve seats. 16 FJiR-664 & 665 5/18 76 37393 OPS Gasket Irak Replaced gasket. 8 FPS-52 5/17 71 21153 Testing Old Age Replaced instrument batteries. 90 IB-1,2,3, 4 5/21 10 36820 OPS Torque Switch Reset torque switch. 4 F0V-13A & C

NEW YORK FOWER AUIHORITY

. JAFES A. FITZPATRICK NUCLEAR POWER FIANT SAFELY PEIATED ELECTRICAL & MECHANICAL MAINID'MCE SlWARY ~

FAY 1985 REPAIR kOPK REQUEST f TIFE DATE SYSTEM C mPONENT F0W DETFLTED CAUSE OF MALR1NCTION ACTION TM'EN TO PRECLUDE RECURREtrE FOURS 5/20 76 33761 OPS Bumed out light bulb Replaced light bulb. 2 SD-41 5/20 76 33763 OPS Burned out light bulb Replaced light bulb. 2 SD-51 5/20 02 23889 Hydro Worn Packing Replaced valve. 1 F0V-54B 5/20 03 36885 OPS Seat Leak Replaced HCU-lll Valve. 1 HCU 14-43 5/24 03 39627 OPS Wom Seat Peplace 120 Valve. 6 HCU 30-31 5/24 27 39564 OPS Valve Will Not Operate Pepaired valve. 24 AOV-127B 5/23 02 36788 OPS Seat Leak Repaired valve. 48 AOV-17 5/23 02 36736 OPS Seat leak Repaired valve. 48 AOV-18 5/22 03 36840 OPS Failed read switches Replaced PI rod. 2 CRD-26-23 5/22 07 23238 OPS Switch Replaced switch. 6 NM-82B 5/22 29 36792 OPS Oil Leak Repaired leak. 70 AOV-80C 5/21 27 36808 OPS Broken Shear Pin Replaced shear pin. 16 AOV-116 5/21 76 34089 OPS Packing Irak Replaced packing. 12 P-3

Jrm:n A. Fit:P: trick

. Nucircr Pow:r Pl;nt PO. Bom 41 Lycoming, New York 13033 315 342.3840 Harold A. Glovier

  1. b NewYorkPower 4# Authority June 10, 1985 JAFP 85- 0497 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ATTENTION: DOCUMENT CONTROL DESK

REFERENCE:

DOCKET NO. 50-333

Dear Sir:

Enclosed please find the J. A. FitzPatrick Operating Status Report for the month of May, 1985. Refueling information has been updated and is attached to this transmittal.

If there are any questions concerning this report, please contact John Cook at (315) 342-3840, Ext. 439.

/f HAROLD A. GLOVIER HA h :mac Enclosures cc: Distribution I