OPERATING DATA REPORT DOCKET NO.
50-333 DATE Oct. w84 COMPLETED BY
.J Cook TELEPHONE (315)342-3840 OPERATING STATUS FitzPatrick Not*5
- 1. Unit Name:
840901-840930
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
2436 883
- 4. Namepiste Rating (Gross MWe):
821
- 5. Design Electrical Rating (Net MWe):
830
- 6. Maximum Dependable Capacity (Gross MWe):
810
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
None
- 9. Power Level To Which Restricted,if Any (Net MWe):
None
- 10. Reasons For Restrictions.lf Any:
This Month Yr to Date Cumulative II. Hours in Reporties Period 720 6575 80472
- 12. Number Of Hours Reactor Was Critical 349 5713 58241.8
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On Line 344 5578.8 120562114
- 15. Unit Reserve Shutdown Hours 0
0 0
811920 12825528 120562114
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Genersted (MWH) 268370 4269330 41488520 259740 4133175 39631815
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor 47.87.
84.87.
70.67.
- 20. Unit Availability Factor 47.8%
84.8%
70.6%
- 21. Unit Capacity Factor (Using MDC Net) 44.5%
77.6%
64.2%
- 22. Unit Capacity Factor (Using DER Net).
43.9%
76.6%
60.6%
07.
4.77.
13.77.
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):
REFUELING OUTAGE SCllEDULED FOR JANUARY 11, 1985 to last approximately 60 days
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: October 15. 1984
- 26. Units in Test Status (Prior io Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 0410170251 840930 h
PDR ADOCK 05000333 i
R PDR
(
AVERAGE DAILY UNIT POWER LEVEL DOCKETNO. 50-333 UNIT FitzPatrick Oct. 1984 DATE COMPLETED,8Y J. Cook TELEPHONE [315)342-3840 MONTH 1 September 1984 DAY AVERAGE DAILY POWER L'EVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
IMWe-Net) 739 0
37,
2 746 0
774 9
3 gg 776 0
4 770 0
5
' 21 776 0
6 3
771 0
7 775 0
s 24 778 0
9 3
779 0
to 26 780 0
31 27 779 0
12 3
781 0
33 2,
737 0
14 3,
62 0
is 3:
0 is
SUMMARY
The unit operated at near full thermal power for the first 14 days of the reporting period.
On 840915 the plant was shutdown for maintenance.
l Wa
,~.
o-,
~.,,.., -
a UNITSIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-333 UNIT NAME F1tzPatrick DATE Oct. 1984 REPORT MONTil September 1984 COMPLETED BY _ J._, Cook TELEPilONE (3151342-3840 "t.
w 0
.! E 3
yY3 Licensee E,
c*
Date
{
3g 3
jg; Event ui k*"L Cause & Currective Action to g$ E j p, g Repost =
AG Psevent Reevesence 0
12 840915 S
376 B
1 N/A N/A
'N/A 840915 Shutdown for maintenance and IHSI (cumulative hrs. 376) t 2
3 4
F: F.wced Reason:
Method:
Enhible G. Insient-sions 5: Scheduled A-Equipment Failure (Espisin) 1 Manual for Piepasatiini oI Data II. Maintenance of Test 2-Manual Scram.
Enity Sheets rur 1.icensee C.Refeeling 3 Automatic Scram.
Event Repine (l.ER) File INUREG.
D.Regulsioey Restriction 4-Oehee (Emplain) 0161)
E4)peratur Training A License Enaminatkm F.Adminisitative 5
G-Opena iunal Ensus (Eaplaint Ilothee lEmplain)
Esh6 bit 1 5ame Sinuse
p-4-
1 NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE SEPTEMBER 1904-The FitzPatrick Plant operated at rear full thermal power for the first 14 days of this reporting period.
On Septeatber 15 the unit was taken off line for maintenance which included Induction Heat Stress Inprovements.. The estimated return to service date is October. 15, 1984.
I L
i
'l k.,
7 NE#10RK POWER AUINORITY-JAMES A.FITZPATRICK llDCLEAR POWER PLANT i1
- 4 MAINIENANCE SN j'
{
hpromher 1984 i
VISItK REquESTNo.
HOW CAUSE OF RESULTS OF ACIl0N TAKEN REPAIR M
W ER j
COW 8HENT NO.
DETECTED MALFUNCh0N MALFUNCTION T rRE
. {
ggg g 840919 03 037343 OPS Indicator Module " Full-in light Replaced Module 12 38-07 was bad fails at 00 g-J 840924 03 037369 OPS Relay K51 Spurious Op. in Replaced 3A-K51 6
l' j
SVT. 2 shorted Rod-Out Direc.
and IC4 840922 05 023017 033 Hod. MI-84-080 Replace HFA Replaced out the 140 "B"
840922 03 023014 I&C Prep. for Outage Check / adjust HFA Calib. Relays 250 l
HFA'-s work Relays Per F-IMP-71.18 l
i
?
I 840919 06 033433 OPS Dirty gears &
Pens not on trac; LCleaned Pen &
4
?
)
LR/PR 97 bushings stick, & bind realigned assy.
[
j
]
840928 07 033455 OPS X: Amp failed IRM A failed Replaced DC Amp 26 i
}
A IRM Downscale I
1 4
i 840912 07 029171 I&C Encv ylete WR Erratic Info.
Completed
.![
t t j
TIP X-AXIS 37/33*95 on X-Y Plotter 07/33495
.i l 1
,i i
~
i 840921 07 037333 OPS remp. vent duct.
Signal leads havi rInspected 1
l.
j H 1RM fell on leads bent plugs Connectors s
ll l
840924 07 037152 OPS (o alarm light Relay K11 failed Replaced relay 1
}
ArxM-F
~
2n panel failed to give fj840921 07 037334 OPS 5tatic Charge on Incor. Respcuse Antistatic spray /. 6 I
j:
~
neter with detector washed meter 8
"A" SRM 840927 07 024644 OPS Bad detector Drifting, spikinl ; Replaced LPRM 3
5 j-EPHR17-13D high, normal card, IMP 7.6 i
840926 07 032300 OPS
) pen Detector Drifting high Replace Jan.
0
,j.LPRM36-21C 1985
}
~ ~^
r v
r.
NEWYORK POWER AUTHORITY-JAMES A.FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
j September 1984 WORK REQUEST NO.
Il0W CAUSE OF RESULTS OF ACTION TAKEN REPAIR DATE SYSTEM hCUR g
{9 R j
PE 1 E COMPONENT No.
DETECTED MALFUNCTION MALFUNCTION 840918 17 035111 OPS Failed during "A" Radwaste Replaced Detecto) 8 PM-458A normal operation vent monitor
}
f 840920 23 033426 OPS Switch corroded Supply line high Replaced switch 20 23-LS-90 press. drain
& calibrated 840921 93 024188 OPS Hi Trim pot was Load Control is Adjusted high/
40 93-LSB-lD clockwise erratic low Trim Pots 840924 93 037358 OPS Negative Ground Large ground on Isol. ground to 38 93EDG-D on Voltmeter "B"
125VDC 93-v3-13D 8
6 e
4 t
JAMt3 A. rrrcrnrnuvn MthT Itmit PUwa.M RE.ANI.
~-
.;cgf6 '
s
,j s.-
,y SAFETY RELATED ELECTRICAL Q MECHANICAL MAINTENANCE
SUMMARY
5.;9,.S, i REPAIl NU
" COMPONENT #
HOW DETECTED CAUSE OF MALFUNCTION
' ACTION TAKEN TO PRECLUDE RECURRENCE TIME DATE SYSTEM HOURE 9/11 03 23823 N/A No mal f un,ction,-
Rebuilt Crive 18 l
CRD-4230 normal ma1ntenance;
~
l l
s 'c.-
s 9/11 03 23762 N/A No malf uriction,.
Rebuilt Drive 38 CRD-3092 normal maintenance
.i 9/11 03 23981 N/A No malfunction, Rebuilt Drive 52 CRD-812 normal maintenance.
l' i
9/11 03 23982 N/.
No malfunction, Rebuilt Drive 22 CRD-3765 normal maintenance
.i "I
I
{
l 9/10 03 23824 N/A No; malfunction, Rebuilt Drive 25 CRD-5146 normalmaiptenance.
1
,e
=
l' JAMES A. FITZPATRICK NUCLEAR POWER PUUU l
." tith '
m y
-N.
SAFETY RELATED ELECTRICAL 'S MECl4ANICAL MAINTENANCE
SUMMARY
1 k;5f,khh c
REPAII M NST#
l DATE SYSTEM HOW DETECTED' CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME -
l COMPONENT #
HOURE 9/13 03 23984 N/A No. malfunction, Rebuilt Drive 44
(
CRD-4072 normal maintenance
~'~ ~
l 9/7 03 23980 Visual Bent Coll.et Housing Discarded 9
CRD-3030 i
9/6 C3 23977 N.D.E.
Cracked collet Discarded 10 CRD-5683 hopsing 9/7 03 23976 N.D.E.
Cracked collet Discarded 8
CRD-3115 housing e
9/10 93 23761 N/A No malfunction, Rebuilt Drive 25
]
CRD-3236 normal m'aintenance t.
3/11 03 23764 N/A No malfunction, Rebuilt Drive 46 CRD-3418 normal malptenance i
't 9/11 03 23763 N/A No malfunction, Rebuilt Drive 46 CRD-3262 not; mal maintenance 4
e we
- =
i
l
,.,iitO' SAFETY RELATED ELECTRICAL tj} lWEd4ANitAL MAINTENANCE
SUMMARY
- .' 'I 9;
,N
.~,
1
" COMPONENT #
HOW DETECTED' CAUSE OF - ALFUNCTION ACTION TAKEN TO PRECLUDE HECURRENCE NE NU DATE SYSTEM HOURE
.9/10 03 23825 N/A No. mal f un ct io n,-
. Rebuilt Drive 24 CRD A-normal maintenance-4197 i
9/11 03 23983 N/A No malfunction, Rebuilt Drive 42
^
CRD-2964 no rmal ma'in tenancei-l e.
9/12 03 23974 N/A No malfunction, Rebuilt Drive 28 CRD-7928 normal ma'i'ntenance I
i 9/12 03 23979 N/A No malfunction, Rebuilt Drive 22 CRD-5082 normal maihtenance'
. i' I
9/10 03 23973 N/A No malfune, tion, Rebuilt Drive 28 CRD A-normal maintenance 5180 9/11 03 23975 N/A No malfunction, Rebuilt Drive 75
~
CRD-3050 normal maihtenance e
- i I
~9/5 88 25435 Operation-Hisadjusted control Inspected Magnatorque, 239 i
CR-2 al Check circuit adjusted control circuit l'
load tested crane Y
9/18 13 25778 LLRT Seat Leakage Ground and lapped wedge 134 RCI-03 and seats j
4
JAMES ~A7FITZPATRICK NUCLEAR POWER PUWT-
,>,g #
g ma SAFETY RELATED ELECTRICAL 'b MEd4ANICAL MAINTENANCE
SUMMARY
~
k;y.j$
~
REPAll NU
" COMPONENT #
HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECL.UDE HECLERENCE TIME DATE SYSTEM HOURE 9/29 07 29045 OPS Bad switch contacts Replaced switch 6
S-1B
.,?
j
%tih W19 03 21437 OPS Bad positi,on Replaced probe 1
CRD indication probe;?"'
31 9/23 03 23421 OPS Bad position Replaced probe 10 CRD 26-indication probe 23 I
9/23 03 23395 OPS Bad position Replaced probe 4
CRD 22-indication: probe 35 2
i 9/23 03 23811 OPS Bad position Replaced probe 4
CRD 02-indication! probe-27
.' l 9/23 03 23368 OPS Bad position Replaced probe 4
CRD 22-indication: probe 27 t
~
we I
m---
,, y SAFETY RELATED ELECTRICAL O MECHANICAL MAINTENANCE SUMMARV??
l
}.
g
^
_=
REPAt:
" COMPONENT #
- HOW DETECTED CAUSE OF MALFUNCTION ACTION TAMEN TO PRECUA2 fECURREMI TIME DATE SYSTEM HOUR!
9/21 03 27382 OPS Bad position Replaced probe 6
i CRD 46-indication probe, 43 9/27 03 -
19871 OPS Worn seals Replaced Drive 50 CRD 06-23
'J/26 03 26907 OPS Worn seals Replaced Drive 40 CRD 18-35 9/28.
03 24439 OPS Worn seals Replaced Drive 50 CRD 22-31 l
t y
9/28 03 26908 OPS Worn seals e
Replaced Drive 30 CRD 26-
).
27
'i'
-l
. cf k
. [j /,.
i i
30 9/28 03 24660 OPS Worn seals-Replaced Drive p3; 4. j.'
CRD 38-
.b 11
- f.
~
J.
-f.
.{
,.c
- e fe s..
~%
1l l
l1
.l\\
j En MU
's l
i TIO 2
l H
ECN E
R RU s
C w.<.Cr.
E s
- e e,
t' I
i?
. t
- 3I.
t's. ' ?
q
.Y E
R D
A U.
M d
M ER U
P S
e e
O v
v T
i i
4 2
r r
N D
D K
E A
K d
d A
N T
e e
E c
c T
N a
a N
lo l
l p
p I
T A
C 4
e e
R R
M A
L e.
A C
N.
N e
I
. A.M O
- y. N 4.6 C
-.C N
E U
F M
LA
!ii M'
s l~
.J s
l F
a a
L O
e e
A s
s C
ES n
n IR U
r r
eILl T
A*
o o
, h
~,C C
W W
ELE D
D ET E
C T
E A
T L
E RE D
S S
P P
W O
O O
Y H
TE F
T #
A S
S E T 8
4 U N P3 43 Q E E N G
6 R O 5D 0D P
9R9 7R7 K
M 0C3 2C2 RO O C
W M
ET S
3 3
Y 0
0 S
8 8
E 2
2 T
/
/
A 7
9 9
D
-nell l
ll1'
, James A. FitaPetrick Nucted Power Plant Po. Box 41 Lycoming. New York 13093 315 342.3840 Corbin A.McNeill,Jr.
- > NewWrkPbwer 4# Authority October 9, 1984 JAFP-84 -0946 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 ATTENTION; DOCUMENT CONTROL DESK
REFERENCE:
DOCKET NO. 50-333
Dear Sir:
The Operating Status Report for the month of September 1984 is enclosed.
The refueling information remains the same as previously submitted.
If there are any questions concerning this report, contact John Cook at (315) 342-3840, Ext. 439.
Very truly yours, dy b 7 Corbin A. McNeill, Jr.
CAM:JPC: tis cc:
Internal Distribution Enclosures
>$