MONTHYEARJAFP-99-0277, Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0261, Monthly Operating Rept for Aug 1999 for Jafnpp.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Jafnpp.With JAFP-99-0236, Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with JAFP-99-0211, Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0181, Monthly Operating Rept for May 1999 for Jafnpp.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Jafnpp.With JAFP-99-0166, Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With JAFP-99-0142, Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0092, Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0011, Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With JAFP-98-0396, Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with JAFP-98-0360, Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With JAFP-98-0322, Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With ML20151X6891998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0264, Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant JAFP-98-0222, Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0193, Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant JAFP-98-0168, Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0128, Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0091, Monthly Operating Rept for Feb 1998 for JAFNPP1998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for JAFNPP JAFP-98-0058, Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0009, Monthly Operating Rept for Dec 1997 for Ja FitzPatrick Nuclear Power Plant1997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0474, Monthly Operating Rept for Nov 1997 for Ja FitzPatrick Nuclear Power Plant1997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0435, Monthly Operating Rept for Oct 1997 for Ja FitzPatrick Nuclear Power Plant1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0375, Monthly Operating Rept for Sept 1997 for Ja FitzPatrick Nuclear Plant1997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Ja FitzPatrick Nuclear Plant JAFP-97-0341, Monthly Operating Rept for Aug 1997 for Jfnpp1997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Jfnpp JAFP-97-0297, Monthly Operating Rept for Jul 1997 for Ja FitzPatrick Nuclear Power Plant1997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0242, Monthly Operating Rept for June 1997 for Ja FitzPatrick Nuclear Power Plant1997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0203, Monthly Operating Rept for May 1997 for Ja FitzPatrick Npp1997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Ja FitzPatrick Npp JAFP-97-0178, Monthly Operating Rept for Apr 1997 for Ja FitzPatrick Nuclear Power Plant1997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0126, Monthly Operating Rept for Mar 1997 for JAFNPP1997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for JAFNPP JAFP-97-0093, Monthly Operating Rept for Feb 1997 for James A. FitzPatrick Nuclear Power Plant1997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for James A. FitzPatrick Nuclear Power Plant JAFP-97-0056, Monthly Operating Rept for Jan 1997 for Ja FitzPatrick Nuclear Power Plant1997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0012, Monthly Operating Rept for Dec 1996 for Ja FitzPatrick Nuclear Power Plant1996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0476, Monthly Operating Rept for Nov 1996 for James A. FitzPatrick Nuclear Power Plant1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for James A. FitzPatrick Nuclear Power Plant JAFP-96-0448, Monthly Operating Rept for Oct 1996 for Ja FitzPatrick Nuclear Power Plant1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0401, Monthly Operating Rept for Sept 1996 for Jfnpp1996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Jfnpp JAFP-96-0352, Monthly Operating Rept for Aug 1996 for Ja FitzPatrick Nuclear Power Plant1996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0300, Monthly Operating Rept for Jul 1996 for Ja FitzPatrick Nuclear Power Plant1996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0275, Monthly Operating Rept for June 1996 for Ja FitzPatrick Nuclear Power Plant1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0240, Monthly Operating Rept for May 1996 for Ja FitzPatrick Nuclear Power Plant1996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0196, Monthly Operating Status Rept for Apr 1996 for Ja FitzPatrick Nuclear Power Plant1996-04-30030 April 1996 Monthly Operating Status Rept for Apr 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0156, Monthly Operating Rept for Mar 1996 for Ja FitzPatrick Nuclear Power Plant1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0113, Monthly Operating Rept for Feb 1996 for Ja FitzPatrick Nuclear Power Plant1996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0066, Monthly Operating Rept for Jan 1996 for JAFNPP1996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for JAFNPP JAFP-96-0023, Monthly Operating Rept for Dec 1995 for Ja Fitzpatrick Nuclear Power Plant1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Ja Fitzpatrick Nuclear Power Plant JAFP-95-0535, Monthly Operating Rept for Nov 1995 for Jafnpp1995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Jafnpp JAFP-95-0486, Monthly Operating Rept for Oct 1995 for Ja FitzPatrick Nuclear Plant1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Ja FitzPatrick Nuclear Plant JAFP-95-0444, Monthly Operating Rept for Sept 1995 for Ja FitzPatrick Nuclear Power Plant1995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Ja FitzPatrick Nuclear Power Plant JAFP-95-0413, Monthly Operating Rept for Aug 1995 for Ja Fitzpatrick Nuclear Power Plant1995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Ja Fitzpatrick Nuclear Power Plant JAFP-95-0372, Monthly Operating Rept for July 1995 for Ja FitzPatrick Nuclear Power Plant1995-07-31031 July 1995 Monthly Operating Rept for July 1995 for Ja FitzPatrick Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARJAFP-99-0277, Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data JAFP-99-0261, Monthly Operating Rept for Aug 1999 for Jafnpp.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Jafnpp.With JAFP-99-0236, Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with ML20216D9541999-07-28028 July 1999 Safety Evaluation Authorizing Proposed Alternatives for Second 10-year Interval Pursuant to 10CFR50.55a(a)(3)(ii) ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept JAFP-99-0211, Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0175, Annual Summary of Changes,Tests & Experiments for 1997/1998. with1999-06-0202 June 1999 Annual Summary of Changes,Tests & Experiments for 1997/1998. with JAFP-99-0181, Monthly Operating Rept for May 1999 for Jafnpp.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Jafnpp.With JAFP-99-0166, Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With JAFP-99-0142, Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0092, Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With ML20207E9311999-02-26026 February 1999 Part 21 Rept Re Sprague Model TE1302 Aluminum Electrolytic Capacitors with Date Code of 9322H.Caused by Aluminum Electrolytic Capacitors.Affected Capacitors Replaced ML20202J0891999-02-0303 February 1999 Safety Evaluation Accepting Rev 2 of Third Interval Inservice Testing Program for Pumps & Valves for James a FitzPatrick Nuclear Power Plant ML20199M0891999-01-22022 January 1999 Part 21 Rept Re Failure of Square Root Converters.Caused by Failed Aluminum Electrolytic Capacitory Spargue Electric Co (Model Number TE1302 with Mfg Date Code 9322H).Sent Square Root Converters Back to Mfg,Barker Microfarads,Inc JAFP-99-0011, Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With ML20198F9991998-12-0404 December 1998 Assessment of Licensing Basis for Use of Containment Overpressure Credit for Net Positive Suction Head Analyses Power Authority of State of New York,James a Fitzpatrick Nuclear Power Plant ML20196J3501998-12-0404 December 1998 SER Accepting License Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves JAFP-98-0396, Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with ML20196F9251998-11-25025 November 1998 Safety Evaluation Re Thrid 10-year Interval Inservice Insp Program Relief Requests for Plant ML20195J7521998-11-18018 November 1998 Rev 7 to Jaf Colr ML20195K4211998-11-17017 November 1998 Safety Evaluation Authorizing Proposed Alternative in Relief Request VRR-05 Per 10CFR50.55a(a)(3)(i) & PRR-01,PRR-02R1, PRR-03,PRR-04,VRR-02,VRR-03 & VRR-04 Per 10CFR50.55a(a)(3)(ii) ML20195E1051998-11-13013 November 1998 Safety Evaluation Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves, Issued 950817 ML20197G6221998-11-0606 November 1998 Non-proprietary Rev 7 to HI-971661, Licensing Rept for Reracking of Ja FitzPatrick Sfp ML20155H5321998-11-0303 November 1998 Safety Evaluation Authorizing Alternative to ASME Code Requirements for CRD Bolting ML20155H5801998-11-0303 November 1998 Safety Evaluation Authorizing Postponement of Beginning of Augmented Exam Requirements of 10CFR50.55a(g)(6)(ii)(A)(2) Re ASME Code,Section XI JAFP-98-0360, Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With ML20155C2821998-10-30030 October 1998 Non-proprietary Rev 0 to GENE-187-30-1598 Np, CRD Bolting Flaw Evaluation for Ja FitzPatrick Nuclear Power Plant ML20154L6591998-10-14014 October 1998 Safety Evaluation Accepting Licensee Proposed Alternative to Snubber Visual Inservice Exam Intervals & Sampling Rates Requirements Contained in ASME Code,Section Xi,Subsection Iwf,Article IWF-5000 JAFP-98-0322, Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With ML20153D2591998-09-21021 September 1998 SER Accepting Proposed Alternative Testing of Containment Following ECCS Suction Strainer Replacement ML20153B5611998-09-0101 September 1998 Rev 1 to JAF-SE-98-013, RHR & Core Spray Suppression Pool Suction Strainer Replacement ML20151X6891998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Ja FitzPatrick Nuclear Power Plant ML20237E8361998-08-25025 August 1998 Rev 6 to Colr ML20237E9471998-08-0808 August 1998 Rev 6 to Colr JAFP-98-0264, Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant ML20236X5881998-07-29029 July 1998 Safety Evaluation Supporting Amend 245 to License DPR-59 ML20236V8181998-07-29029 July 1998 Safety Evaluation Accepting Request for Relief from Implementation of Requirements of 10CFR50.55a Related to Containment Repair & Replacement Activities for James a FitzPatrick Nuclear Power Plant ML20153B5781998-07-28028 July 1998 Rev 0 to JAF-SE-98-025, HPCI & RCIC Suppression Pool Suction Strainer Replacement ML20236X3831998-07-14014 July 1998 Rev 2 to JAF-RPT-MULTI-02671, Summary of Detailed Evaluation for NRC Generic Ltr 96-06 ML20154L9201998-07-10010 July 1998 SER Accepting Rev to Reactor Vessel Surveillance Capsule Withdrawal Schedule for James a Fitzpatrick Nuclear Power Plant JAFP-98-0222, Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0193, Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant ML20248F3531998-05-21021 May 1998 Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted JAFP-98-0168, Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0128, Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant ML20217A4631998-03-23023 March 1998 Safety Evaluation Accepting Use of Three Heats/Lots of Hot Rolled XM-19 Matl in Core Shroud Repair Assemblies Re Licenses DPR-16 & DPR-59,respectively JAFP-98-0091, Monthly Operating Rept for Feb 1998 for JAFNPP1998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for JAFNPP ML20202G9081998-02-0606 February 1998 Safety Evaluation Re Amend to License DPR-59 to Revise TS Tables 3.2-2 & 4.2-2 JAFP-98-0058, Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant 1999-09-30
[Table view] |
Text
~
, 7/;
f
,' OPERATING DATA REPORT DOCKET NO. 50-333 DATE ILLY.193.4 r'n nk
,- COMPLETED BY .T TELEPHONE (3151 342-3840 OPERATING STATUS FitzPatrick Notes
- 1. Unit Name:
- 2. Reporting Period: 840401 - 840430
- 3. Licensed Thermal Power (MWt):
2436 ..
- 4. Nameplate Rating (Gross MWe):
~
- 5. Design Electrical Rating (Net MWe): 821
- 6. Maximum Dependabic Capacity (Gross MWe): 830
- 7. Maximum Deperdable Capacity (Net MWe): 810
- 8. If Changes Occur in Capacity Ratings (Items Numba 3 Tfirough 7) Since Last Report, Give Reasons: -
NONE
- 9. Power Level To Which Restricted,if Any (Net MWe): NONE
- 10. Reasons For Restrictions. If Any:
This Morah Yr.-to-Date Cumulatise
- 11. Hours In Reporting Period 719 2903 76800
- 12. Number Of Hours Reactor War Critical 719 2593.3 55122.1
- 13. Reactor Reserve Shutdown Hours 0 0 0
- 14. Hours Generator On-Line 719 2520.6 53720.2
- 15. Unit Reserve Shuidown Hours 0 0 0
- 16. Gross Thermal Energy Generated (MWH) 1721088 5751672 113 4 R R '> s a
- 17. Gross Electrical Energy Generated (MWH) 580280 1928470 39147660
- 18. Net Electrical Energy Generated (MWH) 562090 1866135 37364775 l
- 19. Unit Service Factor 100% 86.8% 69.9% ;
- 20. Unit Availability Factor 100% 86.8% 69.9%
- 21. Unit Capacity Factor (Using MDC Net) 96.5% 79.4% 63.6%
- 22. Unit Capacity Factor (Using DER Net) - 95.2% 78.3% 59.3%
- 23. Unit Forced Outage Rate 0 3.9% 14.1%
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
Maintenance outage to commence on or about 840901 to last anprox- 1 imately 30 days.
j 1
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
J
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved j.
A INITIAL CRITICALITY l INITIAL ELECTRICITY COMMERCIAL OPERATION 4
8405110021 840430 i; PDR ADOCK 05000333 R PDR !
$ .' ___ _ 3
AVERAGE DAll.Y UNIT POWER LEVEL' DOCKET NO. 50-333 UNIT FitzPatrick' DATE May 1984 COMPLETED,8Y J. Cook TELEPHONE (315) 342-38.40 April 1984 MONTH __
- l. -
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) .
(MWe-NetI g
786 37 , 794 2 792 -
gg 794 3 795 g, 794 798 794 4 20 5 797 - 21 793 6
793 794 22 ,
l 7 794 23 794 g 794 794 24
, 794 25 795 to 793 26 795
. al 794 27 796 12 793 28 580 13 791 29 642 i
g4 793 3, 765 15 7'93 3, 16 741 .
f
SUMMARY
- The FitzPatrick Platit operated at near full thermal power for this reporting period with one power re-duction for control rod sequence exchange.
So y -- , r ,-w -,yy,-, - - - - - -.
+ - . , - . , , , _ . - - ,we, ---,w-- -
UNITSilOTDOWNS AND POWER REDUCTIONS DOCKET NO.
, UNIT N AME FitzPatrick DATE May 1984 REPORT MONTil April 1984 COMPLETED ItY J . ' Cook TELEPilONE f_315) 342-3840
' w.
.g ? "s j .!f 3 Licensee E*, gg Nie. Daic Cause & Curicesive k 3g i5 .355 Event g? gi, Action to H gE E Report
- in u o O 5 ;=, =g u Pievent Recurrence i
o 6 840428 S 0 H 4 N/A N/A N/A Reduced power for rod pattern adjustment e
I 2 3 4 F: Forced Reason: Method:
S: Scheduled A-Equipment failure (Explala) Exhibli G Insienctions l-Manual for Pseparation of Data II. Maintenance of Test 2-Manual Scram. Entry Shecis for 1.icensee C. Refueling 3 Automatic Scram.
D Regulatory Restriction Event Repini (LElt) File INUREG-4-Other iExplain) 0161)
E Operator Training & License Examination F.Ad minist ra tive 5
G Operational Eseur (Explaint Il Other IExplain) Exhibii 1 SJme Somcc
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE APRIL 1984 The unit operated at near full thermal power for this entire reporting period. On 840428 power was reduced for control rod sequence exchange.
At the end of the reporting period, the FitzPatrick Plant is operating at approximately 765 MWe.
1
POWER AlfrHORITY OF THE STATE OF NEW YORK-JAMES A. FITZPATRidK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL 8 MECHANICAL MAINTENANCE
SUMMARY
DATE SYSTEM M RE M # HOW DETECTED OvMPONENT # CAUSE OF MALFUNCTION
' ACTION TAKEN TO PRECLUDE RECURRENCE T ME
)
HOURS 4/5 23 23443 OPS 81'own gasket Replaced gasket 42 HPCI Gland Seal Conden. .
4/5 03 23383 OPS Leaking Valve III Replaced valve -- 1 HCU 18-19 4/5 03 22755 N/A Preventive Maint. Dis a s s emb l e , inspect and 4 i CRD S/N dry internals of CRD 3236 -
4/5 03 22859 N/A Pr even t ive Maint. Dis as s emb l e , inspect and 4 CRD S/N dry internals of CRD 3092 4
4/5 03 22857 N/A Preventive Maint. Dis as s emb l e, inspect and 3 CRD S/N -
dry internals of CRD 3418
=
4
3 POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRI K NOCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE
SUMMARY
DATE SYSTEM
" 6 HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T
,4/5 03 ~22858 N/A P r ev e n t iv e Maint. Disassemble, inspect and 4 CRD S/N d ry internals of CRD 3262 4/6 71 24240 Control Rm Ground on 'B' Corrected cause of ground 48 SB-2 Alarm Battery .
t 4/10 71 25137 N/A Wide range of float Depo le r ized batteries '46 INV 3A& vo lt ages on LPCI 3B bdttery 4/10 76 24205 OPS Br oken dr ive belt Heplaced belt 10 3 TON -
CO2 I
4/13 11 24211 Visual Worn packing leaking Repacked, replaced cylinder 48 P2B gaskets head and valve cover gaskets 4/11 70 24221 OPS Worn belt s Replaced belts 12 AHU 3B 4/17 27 23353 OPS Corroded He bu ilt valve 24 A0V-1278 l
1 POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRidK NOCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE
SUMMARY
t DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T T
l .
4/26 01- 24194 Iodine failed Replaced charcoal 40 125 F-28 Testing I
.. i a
f e
t e
e
-h .. . .. - . .; - .- . - - -g
NEWYORK POWER AUTHORITY-JAMES A.FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
I&C APRTT. 1984 WORK REQUEST NO. HOW CAUSE OF RESULTS OF ACTION TAKEN REPAIR DATE SYSTEM PRE E COMPONENT NO. DETECTED MALFUNCTION MALFUNCTION yCUR p Pointer is loose; Corrective act-4/4/84 02-3 DI - 8G OPS Bent Pointer indicates lo ion-reposit. 10 pointer on meter 4/6/84 02 020127 M d. needs per- Corr. action-VMS-71 OPS Improvement f #*I"8 P*[f[*yd*d 80 4/27/84 03 024730 Light out for Corr. action-ROD 42-07 OPS Broken display of I/O reglacedlight 029151 Cable pulled out Corr. action-4/4/84 07 LPRM12-21B JIC Loose connect- out connector cleaned & re-ion paired connector 3 4/13/84 07 024105 OP AMP U3 De- Goes Inop when Corr. action-RBM-B OPS fective 34-47 is select replaced OP AMP 12 4/2/84 13 023433 Loose Switch No high level Corr. action-LS-74 OPS annunciator tightened switcl- 6 Loose conn. on Internal TST val Corr. action-4/10/84 17 026427 mon card out of spec's tightened conn. 2 RIS-452 JIC 4/6/84 20 024208 Defective power Annun. 9.4.1.10 Corr. action-LR-121 OPS SUPP ly sealed in replaced power 8 nunni v 4/6/84 20 023495 Defective power Starts pump prior Corr. action-LS-120A&B OPS supply to Hi-Alarm replaced power 4/27/84 76 024508 Defective parts MUX trouble Corr.' action-FIRE PANEL OPS alarm replaced defect- 9 ive narts 4/27/84 76 024209 OPS Defective Alarms without Corr. action-8 FPP DG 272 Relay flashing lite replaced relay e
e
' J:m:s A. FitzP: trick Nucle:r Pow:t PI:nt Ro. Box 41 Lycomena, New York 13093 315 342.3840
- > NewYorkPower 4# Authority May 4, 1984 JAFP-84-0471 Director, Office of Inspection and Enforceme'nt U.S. Nuclear Regulatory Commission Washinghton, D.C. 20555 Attention: Document Control Desk
Reference:
Docket No. 50-333
Dear Sir:
The Operating Status Report for the Month of April 1984, is enclosed. The refueling information remains the same as previously submitted.
If there are any questions concerning this report contact John Cook at (315) 342-3840, Ext. 439.
Very truly yours, byde Corbin A. McNeill, Jr.
CAM:JPC:Imd Enclosures CC: Internal Distribution
+% ,