JAFP-84-0471, Monthly Operating Rept for Apr 1984

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1984
ML20084J898
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 04/30/1984
From: Jackie Cook, Corbin McNeil
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
JAFP-84-0471, JAFP-84-471, NUDOCS 8405110021
Download: ML20084J898 (9)


Text

'

~

7/;

f OPERATING DATA REPORT DOCKET NO. 50-333 DATE ILLY.193.4 COMPLETED BY

.T r'n nk TELEPHONE (3151 342-3840 OPERATING STATUS

1. Unit Name:

FitzPatrick Notes 840401 - 840430

2. Reporting Period:

2436

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):

~

5. Design Electrical Rating (Net MWe):

821

6. Maximum Dependabic Capacity (Gross MWe):

830

7. Maximum Deperdable Capacity (Net MWe):

810

8. If Changes Occur in Capacity Ratings (Items Numba 3 Tfirough 7) Since Last Report, Give Reasons:

NONE

9. Power Level To Which Restricted,if Any (Net MWe):

NONE

10. Reasons For Restrictions. If Any:

This Morah Yr.-to-Date Cumulatise 719 2903 76800

11. Hours In Reporting Period
12. Number Of Hours Reactor War Critical 719 2593.3 55122.1
13. Reactor Reserve Shutdown Hours 0

0 0

14. Hours Generator On-Line 719 2520.6 53720.2
15. Unit Reserve Shuidown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 1721088 5751672 113 4 R R '> s a
17. Gross Electrical Energy Generated (MWH) 580280 1928470 39147660
18. Net Electrical Energy Generated (MWH) 562090 1866135 37364775
19. Unit Service Factor 100%

86.8%

69.9%

100%

86.8%

69.9%

20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net) 96.5%

79.4%

63.6%

22. Unit Capacity Factor (Using DER Net) -

95.2%

78.3%

59.3%

23. Unit Forced Outage Rate 0

3.9%

14.1%

24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

Maintenance outage to commence on or about 840901 to last anprox-1 imately 30 days.

j 1

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

J

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved j

A INITIAL CRITICALITY l

INITIAL ELECTRICITY COMMERCIAL OPERATION 4

8405110021 840430 i

PDR ADOCK 05000333 R

PDR 3

AVERAGE DAll.Y UNIT POWER LEVEL' DOCKET NO. 50-333 FitzPatrick' UNIT DATE May 1984 COMPLETED,8Y J.

Cook TELEPHONE (315) 342-38.40 April 1984 MONTH __

l.

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-NetI 786 794 g

37,

2 792 gg 794 795 794 3

g, 798 794 4

20 5

797

- 21 793 793 794 6

22 l

7 794 23 794 794 794 g

24 794 25 795 793 795 to 26 al 794 27 796 12 793 580 28 791 642 13 29 i

793 765 g4 3,

15 7'93 3,

16 741 f

SUMMARY

The FitzPatrick Platit operated at near full thermal power for this reporting period with one power re-duction for control rod sequence exchange.

So y

r

,-w

-,yy,-,

+

,we,

---,w--

UNITSilOTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT N AME FitzPatrick DATE May 1984 REPORT MONTil April 1984 COMPLETED ItY J. ' Cook TELEPilONE f_315) 342-3840 w.

E e

.g ?

"s j.!f 3 Licensee E*

gg Cause & Curicesive Nie.

Daic k

3g i5

.355 Event g?

gi, Action to H

gE E

5 ;=, =g Report

  • in u O

o Pievent Recurrence u

o i

6 840428 S

0 H

4 N/A N/A N/A Reduced power for rod pattern adjustment e

I 2

3 4

F: Forced Reason:

Method:

Exhibli G Insienctions S: Scheduled A-Equipment failure (Explala) l-Manual for Pseparation of Data II. Maintenance of Test 2-Manual Scram.

Entry Shecis for 1.icensee C. Refueling 3 Automatic Scram.

Event Repini (LElt) File INUREG-D Regulatory Restriction 4-Other iExplain) 0161)

E Operator Training & License Examination F.Ad minist ra tive 5

G Operational Eseur (Explaint Exhibii 1 SJme Somcc Il Other IExplain)

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE APRIL 1984 The unit operated at near full thermal power for this entire reporting period.

On 840428 power was reduced for control rod sequence exchange.

At the end of the reporting period, the FitzPatrick Plant is operating at approximately 765 MWe.

POWER AlfrHORITY OF THE STATE OF NEW YORK-JAMES A. FITZPATRidK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL 8 MECHANICAL MAINTENANCE

SUMMARY

M RE M #

DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T ME OvMPONENT #

)

HOURS

' 4/5 23 23443 OPS 81'own gasket Replaced gasket 42 HPCI Gland Seal Conden.

4/5 03 23383 OPS Leaking Valve III Replaced valve 1

HCU 18-19 4/5 03 22755 N/A Preventive Maint.

Dis a s s emb l e, inspect and 4

i CRD S/N dry internals of CRD 3236 4/5 03 22859 N/A Pr even t ive Maint.

Dis as s emb l e, inspect and 4

CRD S/N dry internals of CRD 3092 4

4/5 03 22857 N/A Preventive Maint.

Dis as s emb l e, inspect and 3

CRD S/N dry internals of CRD 3418

=

4

3 POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRI K NOCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

DATE SYSTEM "

6 HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T

,4/5 03

~22858 N/A P r ev e n t iv e Maint.

Disassemble, inspect and 4

CRD S/N d ry internals of CRD 3262 4/6 71 24240 Control Rm Ground on

'B' Corrected cause of ground 48 SB-2 Alarm Battery.

t 4/10 71 25137 N/A Wide range of float Depo le r ized batteries

'46 INV 3A&

vo lt ages on LPCI 3B bdttery 4/10 76 24205 OPS Br oken dr ive belt Heplaced belt 10 3 TON CO2 I

4/13 11 24211 Visual Worn packing leaking Repacked, replaced cylinder 48 P2B gaskets head and valve cover gaskets 4/11 70 24221 OPS Worn belt s Replaced belts 12 AHU 3B 4/17 27 23353 OPS Corroded He bu ilt valve 24 A0V-1278 l

1 POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRidK NOCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

t DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T

T l

4/26 01-24194 Iodine failed Replaced charcoal 40 125 F-28 Testing I

.. i a

f e

t e

e

-h

. - - -g

NEWYORK POWER AUTHORITY-JAMES A.FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

I&C APRTT. 1984 WORK REQUEST NO.

HOW CAUSE OF RESULTS OF ACTION TAKEN REPAIR DATE SYSTEM yCUR PRE E

COMPONENT NO.

DETECTED MALFUNCTION MALFUNCTION p

Pointer is loose; Corrective act-4/4/84 02-3 indicates lo ion-reposit.

10 DI - 8G OPS Bent Pointer pointer on meter 4/6/84 02 020127 M d. needs per-Corr. action-VMS-71 OPS Improvement f #*I"8 P*[f[*yd*d 80 4/27/84 03 024730 Light out for Corr. action-Broken display of I/O reglacedlight ROD 42-07 OPS 029151 Cable pulled out Corr. action-4/4/84 07 LPRM12-21B JIC Loose connect-out connector cleaned & re-ion paired connector 3

4/13/84 07 024105 OP AMP U3 De-Goes Inop when Corr. action-RBM-B OPS fective 34-47 is select replaced OP AMP 12 4/2/84 13 023433 Loose Switch No high level Corr. action-annunciator tightened switcl-6 LS-74 OPS Loose conn. on Internal TST val Corr. action-4/10/84 17 026427 mon card out of spec's tightened conn.

2 RIS-452 JIC 4/6/84 20 024208 Defective power Annun. 9.4.1.10 Corr. action-l LR-121 OPS SUPP y sealed in replaced power 8

nunni v 4/6/84 20 023495 Defective power Starts pump prior Corr. action-LS-120A&B OPS supply to Hi-Alarm replaced power Corr.' action-4/27/84 76 024508 Defective parts MUX trouble FIRE PANEL OPS alarm replaced defect-9 ive narts Defective Alarms without Corr. action-4/27/84 76 024209 OPS 8

FPP DG 272 Relay flashing lite replaced relay e

e

J:m:s A. FitzP: trick Nucle:r Pow:t PI:nt Ro. Box 41 Lycomena, New York 13093 315 342.3840

  1. > NewYorkPower 4# Authority May 4, 1984 JAFP-84-0471 Director, Office of Inspection and Enforceme'nt U.S. Nuclear Regulatory Commission Washinghton, D.C. 20555 Attention:

Document Control Desk

Reference:

Docket No. 50-333

Dear Sir:

The Operating Status Report for the Month of April 1984, is enclosed.

The refueling information remains the same as previously submitted.

If there are any questions concerning this report contact John Cook at (315) 342-3840, Ext. 439.

Very truly yours, byde Corbin A. McNeill, Jr.

CAM:JPC:Imd Enclosures CC:

Internal Distribution

+%

L

._