S-OPERA *flNG DATA REPORT DOCKET NO.

50-333 DATE April 1984 COMPLETED BY J. Cook TELEPHONE (313;342-3840

" OPERATING STATUS

1. Unit Name:

Fitzpatrick Notes

2. Reporting Period:

'~ '

2436

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe): 883
5. Design Electrical. Rating (Net MWe):

821

6. Maximum Dependable Capacity (Gross MWe): 830
7. Maximum Dependable Capacity (Net MWe): 810
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

NONE

9. Power Level To Which Restricted,If Any (Net MWe): NONE
10. Re'asons For Restrictions,If Any:

His Month Yr.-to.Date Cumulative I1. Hours in Reporting Period 744 2184 76081

12. Number Of Hours Reactor Was Critical 434.3 1874.3 54403.1
13. Reactor Reserve Shutdown Hours 0 0 0
14. Hours Generator On.Line 361.6 1801.6 53001.2
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 596112 4030584 111767170
17. Gross Electrical Energy Generated (MWH) 192370 1348190 3856/35o
18. Net Electrical Energy Generated (MWH) 185755 1304045 36802685
19. Unit Senice Factor 48.6% 82.5% 69.7% ~
20. Unit Availability Factor 48.6% 82.5% 69.7X
21. Unit Capacity Factor (Using MDC Net) - 30.8% 73.7% 63.2%
22. Unit Capacity Factor (Using DER Net) . 30.4% 72.7% 58.9%
23. Unit Forced Outage Rate 22.2% 5.4% 14.3x
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):

I l

1

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

l

26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l,

~~

8404180102 840331 PDR ADOCK 05000333

__R PDR #

AVERACE DAII.Y UNIT POWER LEVEL 50-333 I DOCKET NO.

UNIT Fitzpatrick, DATE Anril 1984 '

- CO.\lPLETED,8Y

~

TELEPHONE (315)342-3840 MONTH ; MARCH 1984

. DAY AVERAGE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (MWe-Net) .

IMWe. Net)

, 796 469

, ,7 2 681' gg 469 3 17 39 494 4 0 20 508 5 . 0 '

509 21 6 0 22 165 7 0 0 s 0 0 24

, 0 4 3

10 0 54 26 0 395 27 12 0 -

443 23 13 0 515 29 _

37 704 14 3, 15 278 7g 459 16 -

SUMMARY

The unit operated at near full thermal' power for the first two days cf the reporting period. On 840.303 the unit was taken 'out of service for -

maintenance. Startup commenced on 840314 and on .

840322 the unit trioned on low Reactor Water Level.

^

The-~ unit returned to service on 840326. .

G M '% . 7 .. m 9_ ? * * *,4 fl 3 , - - =**^^^h' - ' - - -

'^

UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-333 ,

  • UNIT NAAIE F_itzoatrick DATE ADril 1984 REPORT MONTli March 1984 COMPLETED RY. J . Cook TELEPilONE (315) 342.-3840

~ -

c es $ me :m: .

.E ,e s Q Licensee E, c 1, N". Daic ,,

  • { 3g g 7 .E 'A

,3 g 5 Event u7 E.3 Cause & Curreceive Action su

$E jU' E j5g Report sr AG Preveni Recurrence r5 3 84030.3 S 279 3 1- N/A N/A .N/A Shutdown for control rod drive

, , maintenance and IHSI.

4 840322 F 64.2 A 3 84-009 SJ P Reactor Srcam on Low Level caused by a Loss of Feedwater Pumo "B" due to a wiped bearing.

~

Feedwater pump "A" out of service for maintenance.

5- 840325 F 39.2 A 3 84-009 SJ P Reactor Scram during startup on Lou Level caused by loss of Feedwater pump "A" due to failure of a control oil'line.

I -2 3 4

-F: Forced Reason: Method:

S: Scheduled A. Equipment Failur'e(Explain) Exhibli G . Inst ructions 1 Manual i

II. Maintenance of Test for Preparaiion of Daiz

2. Manual Scrarn. Entry Sheets for I.icensee C. Refueling 3.Autonialle Scraen.

D. Regulatory Restriction Eveni Repori (I.ER) File INUREG.

4-Other (Explain) 0161)

E. Operator Training & License Examinailun F. Administrative 5

G Operational Error (Explain)

, ll Other (Explain) E.sliibis I .SJme Somcc ,

q

NARRATIVE

SUMMARY

0F OPERATING EXPERIENCE MARCH 1984 The unit operated at near full thermal power for the

.1 first two days of the reporting period. On 840303 the unit was taken out of service for control rod drive maintenance and Induction Heat Stress Improve-ments. FitzPatrick plant returned to service on 840314.

On 840322 the unit tripped on low reactor water level.

The low level was caused by the loss of the "B" Feedwater pump due to a wiped bearing while the "A" pump was out of service for maintenance. Repairs were completed and .

startup commenced on 840325. During startup the unit again tripped'due to low level caused by the loss of "A"_ -

Reactor Feed Pump. Repairs were completed and the unit returned to service on 830326.

At the end of the reporting period the unit is operating ~

at.approximately 744 MWe. ,

o I

i

)

--_-___.___L--

l POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRl6K NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

DATE SYSTEM 0 T#

HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE E

3/7 03 28294 OPS Normal use Replaced CRD 25 CRD 14-23 3/9 03 19883 OPS Normal use Replaced CRD _

15 CRD 38-19 T/8 03 19876 OPS Normal use Replaced CRD 60 CRD 31 ,

3/6 03 19874 OPS Normal use Replaced CRD 32 C RD 10-47 -

3/S 03 19870 OPS Normal use Replaced CRD 28 CRD 06- ,

19

/.

POWER AUTHORITY OF THE STATE OF NEW YORK

, JAMES A. FITZPATRidK NOCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

DATE SYSTEM M S HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T E HOURS 3/4 03 19869 OPS Normal use Replaced CRD 50 CRD 02-23 3/12 29 20212 Incidental Loose baseplate Re-torqued bo lt s 4 PF SK observ. ancho r bo lt' 1531 3/14 02 22813 Visual Worn packing Re-torqued packing 2 MOV-54A ,

3/11 14 20590 N/A No malfunction St aked seat 8 MOV-5B -

3/13 29 27736 OPS ~ Packing leak over Repacked valve, rebuilt 49 HOV-102 heated Limito r. op. L imito rq ue ope r a t o r 3/14 Ad just ed 71 20218 OPS Poor connection on 5 MCC 15 3, stab lock plug-ins E2,E3,E4 ES, E6

, 3/9 03 18520 OPS Normal use Replaced C RDs 150 CRDs 34- '

15,22-19 14-07 26-19 ,

_ :1

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NOCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

DATE SYSTEM M ST#

, HOW DETECTED C@SE OF ., MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE 3// U) W6/> UF6 Normal use Heplaceo LHu o CRD 14-11 3/12 10 24668 Leak test Blown gasket Replaced bonnet gasket 374 A D V-6 8 B .

3/12 34 23935 OPS Limit switch out of Readjusted 2 NRV-111B adjustment 4

3/7 12 25207 N/A No malfunction '

Replaced motor per NRCb 24 MOV-15 79-018 -

3/11 12 & 20203 N/A No malfunction Replaced gears per Mo d . 96 13 12MOV-15 F1-83-41 12MOV-18 V-3/11 23 25126 N/A No, malfunction Verified gear ratio 15 MOV-60 .

4 3/11 29 25125 N/A No malfunction Modified MSIV internals per 586 A D V-8 0D Mo d . M 1-8 3- 5 5 g ADV-86D '

____l_______-___-_________ _ -______ . _ _ _

J

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRl6K NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION T ACTION TAKEN TO PRECLUDE RECURRENCE 3/12 93 23934 OPS Loose motor fan Installed set screw 3 AC-1B 3/6 14 24521 UPb beat backed out of neto rqued seat - st aked seat 29 MOV-SA valve -

to valve body 3/9 02 25279 OPS Grounded lead Taped lead 22 S C V- 71 H ,

3/5 12 32345 OPS Worn pa cki n g Re-pa cke d 10 MOV-15

  • 3/10 20 25208 N/A No malfunction Replaced motor per NRCb 24 MOV-82 79-018 3/6 20 25209 N/A No 'malf unction Re pl ac e d motor per NRCB 22 MOV-94 .79-01B 3/9 29 24724 OPS Stem twisted off Replaced valve 12 MS T-70 0D

_ _ _ ^~ - ------

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

REPAIR DATE SYSTEM WORK REQUEST # HOW DETECTED CAUSE OF MALFUNCTION ENT # ACTION TAKEN TO PRECLUDE RECURRENCE TIME HOURS 3 / 1 11 34 24661 OPS Valve stuck open neplaceo vaive is S OV-111 A 3/7 66 24747 OPS Breaker would not Replaced bre aker 4 UC22F shut ..

3/7 93 25357 N/A No malfunction Replaced air baffles & hea- 100 EDG 'D' ters. Fb dified heate r ci r-cuits per Mod. F1-80-027 3/8 93 25358 N/A No malfunction Repalced air baffles & hea- 100 EDG 'B' ters. Mo dified heate r ci r-cuits per Mod. F1-80-027 2/28 03 22975 N/A No malfunction Rebuilt drive after leak 64 CRD S/N testing and not installing 3054 . in RPV 3/4 29 25211 N/A No malfunction Replaced motor per NRCB 30 MOV-74 79-018

_ _ _ _ _ _ _ _ _-_ _ -_ m__- - .

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

DATE SYSTEM M ST HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T ME HOURS 2/29 03 22765 Leak test Unknown Hebuilt Drive >z CRD S/N A4058 2/29 03 22768 N/A No malfunction Leak tested CRDs 140 CRD S/N .

A3859, A4 017., ..

M8H -

-A5188: , .

A}180,33&

lim;' Bib 3/6 03 19872 OPS Normal u s e. Replaced CRD 57 CRD 06- -

27 3/6 10 25206 N/A No malfunction Replaced motor per NRCB 32 MOV-32 79-018 3/20 24 23296 OPS Int erlo ck . solenoid Replaced solenoid, cleaned & 3 Door K16 burned out. lubricated latch 3/20 66 23939 OPS MCC starter found to Corrected stab and tested 16 UC-22A have bent stab 2/29 OPS 70 24514 Worn belts Replaced belts 8

, AHU12 A,

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRl6K NUCLEAR POWER PLANT 9

SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

DATE SYSTEM M ST HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T ME HOURS 3,/21 27 23283 OPS Solenoid valve stic- Replaced coil, cleaned and 17 S 0V-12 5B king; coil burned ou t r e bu i l t valve 3/21 29 24741 OPS Leaking solenoid Replaced solenoid valve 12 SOV 86B2 valve .

SOV 8683 3/22 03 22763 N/A Pr event ive Maint. Dis ass emb l e, inspect and d ry 20 CRD S/N

  • dry internals of CRD 5160 3/26 03 22761 N/A Pr event ive Main t. Dis ass emb l e, inspect and d ry 6 CRD S/N internals of CRD -

3050 3/26 03 22762 N/A Pr event ive Main t. Dis ass emb l e, inspect and d ry 6 CRD S/N internals of CRD 7928 3/26 -29 23941 OPS V a liv e operator Cleaned & lub r ic a t e d valve 2 MOV-79 t o rq u e s-ou.t be fo r e stem closing 1

3/27 24 23940 Visual Interlo ck not Replaced door latch 4 Door'R- working - latch bent 272/10 2

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

DATE SYSTEM M S HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T E HQURS 3/27 03 21418 OPS No position indica- Iest.eu a replaceo exisiioy i&

CRD 02- tion at 48 position indicating probe 27 N/A P r ev e n t iv e Maint. Disassemble, inspect and dry 6 3/28 03 22863 CRD S/N int e rn a ls of CRD 3765 3/28 03 22758 N/.A Prev e ntiv e .Maint. Disassemble, inspect and dry 6 CRD S/N internals of CRD 5082 3/28 03 22756 N/A P revent iv e. Ma int. Disassemble, inspect and dry 6 CRD S/N internals of CRD .

3115 03 22759 N/A P r ev e n t iv e Maint. Disassemble, inspect and dry 6 3/ 28 CRD S/N int ern a ls of CRD 3030 03 22757 N/A P r ev e n t iv e Maint. Disassemble, inspect and dry 4 3/28 CRD S/N , in t ern a ls of CRD 5683 9

e

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRidK NOCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

DATE SYSTEM M ST#

HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T E HOURS Disassemble, inspect and dry 3 4/2 03 22862 .

N/A P r ev e n t iv e Maint.

CRD S/N internais of CRD 2964 Disassemble, inspect and dry 3 4/2 03 22860 N/A P r ev e n t iv e Maint.

CRD S/N in t er n a ls of CRD 4072 P r ev e n t iv e Maint. Disassemble, inspect and dry 10 4/2 03 22760 N/A CRD S/N in t e rn a ls of CRD 81 2 OPS Leaking solenoid Replaced solenoid valve 6 4/2 34 23440 NRV-1118 valve

~

_ = _ - - _ . _- - - - _ - . . _ - - _-. . _ . . . - _ .

NEWYORK POWER AUTil0RITY-JAMES AeFITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

1&C M A R C il , 1984 WORK REQUEST NO. HOW CAUSE OF RESULTS OF ACTION TAKEN REPAIN DATE SEEM PE

! 3/7/84 02-3 020390 COMPONENT NO. DETECTED JIC MALFUNCTION Old Age MALFUNCTION Need to be hCUR Replaced Lits

]R E LITS Replaced 72B,C,D,57B&58B 7 .

3/1/84 02 024631 OPS Defective Switch Not working Replaced Switch 8 VMR-71G properly 3/7/84 02 018766 OPS Defective Thermo Point not Replaced Thermo 22 TE-145A Couple tracking Couple 3/26/84 02 023363 OPS Out of Adjustment A-High,G-Low,& Adjusted 3 VliR- 71, II-E r ra t ic 3/4/84 03 032239 OPS Unknown Cage out of Ran IMP-3.5, Gage 46 '

HCU-18-47 Calibration Test Alright 1

3/10/84 03 024638 OPS Defective Switch Hard to Select Replaced Selector 11 Rod 26-47 Switch t 3/19/84 03 023299 OPS Defective Buffer Not Working Replaced Card 4 Rod 26-47 Card Properly j 3/11/84 03 023264 OPS Defective Relay Can't Select Replaced R-3A&B 6 CR-14-07 Card Above Rod

! 3/10/84 07 032387 OPS Grease on Gears Black Pen Drift Cleaned Gears 20 PR-46B ,

and Bushings &RD PN Sticky and Bushings 3/16/84 07 024642 OPS Defective PC Only Reading Replaced PCB & 32 '

i RBM-B Board 50% 3UX 1st Level 3/23/84 07 023316 OPS Dirty Connector Failed During Disassembled and 4 IRM-B Operation Cleaned Con 3/7/84 07 032278 OPS Old Age Defective Pot Replaced Pot 10 F-APRM

NEWYORK POWER AUTHORITY-JAMES A.FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

< I&C MARCH 1984 .

l i

WORK REQUEST NO. HOW CAUSE OF RESULTS OF ACTION TAKEN REPAIR DAH SE EM COMPONENT NO. DETECTED MALFUNCTION MALFUNCTION TO PRECLUDE TIME RECURRENCE HOURS 3/2/84 07 029113 JIC Defective Power High Voltage Replaced Power 2

. IRM-A Supply Power Supply Supply .

Drift l 3/23/84 07 023263 OPS Defective Cable IRM Trips Up- Replaced Cable & 4 IRM-C & Connector Scale Connector 3/3/84 10 027794 OPS Out of Calbratior Calibration Calibrated 10 FI-132B 4 l i

3/21/84 10 023369 OPS Defective Sensor Switch Indicates Rpled Sensor & 8 ,

LS-104 Dry Pipe Adj. Gain 3/20/84 10 023425 OPS Zero Out of Adj. Appeared to Readjusted the z PI-130B be stuck Zero

, 3/11/84 11 024663 OPS Improper Wiring Relay did not Corrected 40 MR-67B & Meter Relay open Wiring Error i

3/21/84 17 023361 OPS Shorted Pen in Failed Upscale Repaired under 32 RIS-452A RR-455A Wr-17/023315

) 3/15/84 27 023355 OPS Out of adjustmeni A&B Reads Adjusted 9 j 02AZ-101AB Different by 2%

i 2/24/84 27 031113 JIC Dirty and out of Found Inoper- Cleaned and 12 i PR-100 Calibration ative Calibrated 3/22/84 29 023424 OPS Out of Adjust- Switch will not Adjusted Switch 30

! A0V-86D ment reset 1

i 3/10/84 93 023262 OPS Loose Air Input Air Leak Tightened Loose 1 I PS-9D Fitting Fitting I 3/5/84 93 026430 JIC Test Equip. out PI-1B,2B,4B,5B, Recalibrated 15 PI & PS of Calibration 6B & 9B & 10B PI's &PS's i

. _,._ _ _. _ . . _ . . _ ~ . _ . _ __ . . _ . _ _

NEWYORK POWER AUTHORITY-JAMES A.FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

I & C March 1984 ',

WORK REQUEST NO. HOW CAUSE OF RESULTS OF ACTION TAKEN REPAIR DATE SYSTEM TO PRECLUDE TIME COMPONENT NO. DETECTED MALFUNCTION MALFUNCTION RECURRENCE HOURS 3/16/84 93 024731 OPS Defective Meter Needle Upscale Replaced Meter 3 FM-lD

  • l 3/4/84 93 r026431 JIC Test Equip. out PI-lD,2D,4D,5D, Recalibrated 16 l PI & PS of Calibration 6D & PS-9D,10D PI's & PS's

, 3/10/84 93 023256 OPS Broken Stall Speed Lag Replaced broken 17 D-EDG part I

I l

4 l _ . _

J ma A. FlyP . trick Nucle:r Pow 1r Pl;nt PO. Box 41 t.ycoming, New York 13093 315 342.3840

  1. > NewYorkPower 4# Authority April 9, 1984 JAFP-84-0384 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washinghton, D.C. 20555 Attention: Document Control Desk

Reference:

Docket No. 50-333

Dear Sir:

The Operating Status Report for the Month of March 1984, is enclosed. The refueling information remains the same as previously submitted.

If there are any questions concerning this report contact John Cook at (315) 342-3840, Ext. 439.

Very truly yours, l

Y ww ,

Corbin A. McNeill, Jr.

CAM:JPC:jls Enclosures CC: Internal Distribution i