OPERATING DATA REPORT DOCKET NO.

50-333 DATE February 1984 COMPLETED BY J. Cook TELEPHONE (315)342-3840 OPERATING STATUS Fitzpatrick Notes

1. Unit Name:
2. Reporting Period: 840101-840131 2436
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe): 883 821 -
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe): 810
7. Maximum Dependable Capacity (Net MWe): 810
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

NONE ONE

9. Power Level To Which Restricted,If Any (Net MWe):
10. Reasons For Restrictions,if Any:

This Month Yr.-to-Date Cumulative

11. Hours in Reporting Period 744 744 74641
12. Number Of Hours Reactor Was Critical 744 744 53272.8
13. Reactor Reserve Shutdown Hours 0 0 0
14. Hours Generator On-Line 744 744 51943.6
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 1807464 1807464 109544050
17. Gross Electrical Energy Generated (MWH) 609590 609590 37828780
18. Net Electrical Energy Generated (MWH) 589675 589675 36088315
19. Unit Service Factor 100% 100% 69.6%
20. Unit Availability Factor 100% 100%. 69.6%

4

21. Unit Capacity Factor (Using MDC Net) - 97.8% 97.8% 63.3%
22. Unit Capacity Factor (Using DER Net) . '96.5% 96.5% 58.9%
23. Unit Forced Outage Rate 0 0 14.4%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date,and Duration of Each):

Maifitenance outage to comence arotind March 2,1984 lasting approximately 10 days.

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved .

INITIAL CRITICALITY j INITIAL ELECTRICITY COMMERCIAL OPERATION 8402100258 840131

~

DR ADOCK 05000333 PDR -.

AVERAGE DAll Y UNIT POWER LEVEL b

e 50-333 I DOCKET NO.

IJNIT FITZPATRICK FEBRUARY, 1984 DATE CO.\lPLETED BY J. COOK TELEPHONE (315)342-3840 anuary, 1984 MONTH

. DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) .

IMWe-Net)

, 795 -

793 1 17 2 795 792 38 3 T o r, 793 19 4

794 789 20 s

3 793 791 21 788 79I 6 22 790 793 7 23 8 793 791 24 797 794 9 25 10 793 26 792 33 794 793 27 12 795 28 793 787 13 ~ D -

790 794 I4 3 792 794 33 Ji 16 792 .

SUMMARY

The Fitzpatrick plant operated at Near Full Thermal power for this entire reporting period. '

9  %

{ g * """ ***h. e #* ', g . * "* * % Wg

. j , ges** f 8 e ma_7 - .-" ^

UNIT SilVTDOWNS AND POWER REDUCTIONS DOCKET NO. _50-333 UNIT NAME _FITZPATRICK DATE FEBRUARY 1984 REPORT MONTil January 1984 COMPLETED fly J. COOK _

TELEPilONE _(3151142-1840 w.

e_ ee 's u 5 3 N. . . Date g

E. jE gg

!3  ?$mU vent

= gQ Cause & Currective c g g7 in 0 gg Atlion to 0- m ga Report a g Prevent Recurrence NONE -

l 1

- 1

.-- j 1

l

I 2 3 F: Forced 4 Reason: Method:

S: Scheduled A Equiprnent Failure (Expfsin) Exhibis G Instsuctions 1 Manual for Preparation of Data B Maintenance or Test 2 Manual Scram. Entry Sheets for 1.icensee C Refueling 3 Autumatic Scram.

D Regulatory Restriction Event Report (LElt) File (NultEG.

4 Other (Explain) 0161)

E Operator Tsaining & License Examination

. F Administrative 5

G OperatiUnJ) (f rur (Explaint Il Other (Explain) Exhibis 1 - Same Source O

C__ .m_ _ _ , _ _ _ _ _ _ _ - _ _ . _ _ _ _ _ _ _ _ _ - - -

1 1

3 NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT NARRITIVE SUl@fARY OF OPERATING EXPERIENCE JANUARY, 1984 d

The unit operated at near full thermal power for this entire reporting period.

At the end of the reporting period the Fitzpatrick Plant is i operating at approximately 794 MWe.

I I

a 4

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT '

SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

REPAIR DATE SYSTEM WORK REQUEST # HOW DETECTED CAUSE OF MALFUNCTION T# ACTION TAKEN TO PRECLUDE RECURRENCE TIME hours 1/9 71 20598 N/A None filled and charged s p r.r e 24Z SB-1 & 2 batte ry cells 1/17 27 31195 OPS Pump aeized Replaced pump & motor 9 DWA-PA P-2 1/20 10 20593 Visual Hydraulic Leak Replaced s n ubb e r 4 10-98-S ,

-287 1/23 10- 22804 OPS Worn impel,ler collet Replaced impeller, collets, 156 PI-C pump shaft and line bearing

// ?.5 12 32261 OPS Packing leak Electrically backseated 2 MOV-15 1/26 93 31006 OPS Normal operation Added lube o il 2 EOG-A 1/27- 46 27675 OPS Wear Replaced key 2 MOV-102A ,

L -- - - - - -- ------

POWER AUTHORITY OF THE STATE OF NEW YORK -

. JAMES A. FITZPATRidK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

DATE SYSTEM 8 HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE 1/16 10 31142 Visual Leaking gasket Replaced gasket, performed 34 MOV 57 & pr event ive maintenance MOV 67 1/16 76 31179 Visual Burned out lamp Replaced lamp 4

'CO2 PNL-4 .

1/13 93 32210 OPS Misadjustment Adjusted 2 ECP-B "

1/12 23 32206 Visual Eroded Pipe Replaced pipe 48 Steam Line Drain 1/12 08 32089 INPO None Bent cotter pins 2 Refuel Rigging t

POWER AUTHORITY OF THE STATE OF NEW YORK .

JAMES A. FITZPATRICK NOCLEAR POWER PLANT '

SAFETY RELATED ELECTRICAL a MECHAN! CAL MAINTENANCE

SUMMARY

DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION T ,

ACTION TAKEN TO F-RECLUDE RECURRENCE T

'1/25 10 32323 N/A N/A Performed F-ST-2T 3 MOV-20 1/30 08 32314 Visual Grapple Mast Repaired mast, replaced 8 Refuel inspection Binding; during out. wire rope Bridge .. :

1/30 88 23913 Visual Improper Placed cable in connector 4 CR-2 inspection installation O

e 0

_ _ . _ . _ _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . _ - - _ _ _ _ _ _ _ _ __ _ _ _ . _ _ _ _ _ _ _ _ _ _ ._ _ ~ __6

NEWYORK POWER AUTHORITY-JAMES A.FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

1 & C JANUARY, 1984 WORK REQUEST NO. HOW CAUSE OF RESULTS OF ACTION TAKEN REPAIR ,

DATE SYSTEM TO PRECLUDE TIME COMPONENT NO. DETECTED MALFUNCTION MALFUNCTION RECURRENCE HOURS 11/28/83 00 026448 JIC Various electronic Spare Amplifiers Troublesbot, repair-Various Comp. Faulty needed repair ed, and tested 49 1/12/84 02-02 030964 OPS Transmitter worn, Gemac-Intermittant Replaced Xmittr , 36 i LI-86 Failing Downscale Tested Operable 1/3/84 02-03 031101 OPS Licar on Switch Switch failed to Repled SW 2, LIS-72C operate performed ISP-3-2 8 12/27/8J 03 031163 OPS K-11 Relay had bad Unable to CLR Cntrl REPLCD K-11 on RMCS contact Rd withdrw PS32 In 9-14 8 12/21/83 07 028527 OPS Licar, Age needed Unable to get 0% Rpled frnt pnl mtr APRM ,idj us tment Flow, ISP-20 A, ADJ A, C, F 6 1/26/84 07 032325 OPS Dirty Switch Failed Downscale Cleaned Switch 2.5 ,

LPRM 0421B Solder Connctnq 1/21/84 16-1 029108 JIC Did not Test PT. Needed troubleshoot Reprd DRV Chain DPIT-101 1100 and repair to encodr SRVO 30 1/29/84 17 031114 JIC Faulty Ratemeter Unable to obtain REPLCD Ratemtr card 45 RIS-431 card Sat. meter RDG Re-aligned i

12/26/82 17 031162 OPS Llear, Age, out of Erratic Alarm Adj. dwnscle trim 8 RM-251B Adj ustment Signal pot, ISP-64-1 12/29/82 17 031167 OPS Out of Adjustment Exh. Rad. Mon. Trip Adj . Hi TRP, Corret<

RIS-432B Setpnt Out of Spec 3600 cpm CKT

! 6 i 1/23/84 17 032318 OPS Jut of Adjustment Mtr & Recrdr RR051 ADJ Cenerator, 25 i -

RM-050A Failed ST CALB Meter 1,l/7/83 23 025302 OPS Jear, Process Lines HPCI Flo indicator Repaired, Calibratec 52 l , FI-108 had leak malfunction l

NEWYORK POWER AUTHORITY-JAMES A.FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

1 & C JANUARY, 1984 '

I WORK REQUEST NO. HOW CAUSE OF RESULTS OF ACTION TAKEN REPAIR DATE SYSTEM PRE T E COMPONENT NO. DETECTED MALFUNCTION MALFUNCTION yCUR H R 1/20/84 27 028460 OPS Age, Wear of Parts Chart Rcrding Rpled Ampl Cleaned RM-102A Mechnsm Statnry Adj. and Calb. 320 l

1/6/84 27 029090 JIC Drift after Replemt Diff. In readng of Adj. Zero Perf 02 AZ 101A of Bulb A&B Analysis ISP-31 4 1/10/84 27 030976 Valve does not Controller aligned 30 PCV-122 OPS Use, out of Alignmnt operate right valve seated 1/3/84 27 031151 Lamp Burned out Drywll An1zr reads Rpled Exciter Lamp 20

! DWA_PA, r?S Dwnscale Lo Calib/ISP-31 1/12/84 68 029348 OPS Wear, failed parts Temp recrdrs not Repled Retfr, Temp t

TR-102, 103 working proprly Brd, Adj. 52 1/17/84 70 026842 OPS Wear, Age Oil Press, Guage Replcd, Cal & Instal .

RWC-2A needle Broken new guage 6 10/14/83 71 026435 Prep for Change in N/A Tested, Adjusted i RPS RELAYS JIC Jan. Outage and Returned 140 i

i 1

l l

l i

i *

,e. . ,, J;mes A. FitzPttrick NucleTr Power Plant Po. Box 41 i Lycom.ng, New York 13093 315 342.3840

  1. > NewYorkPbwer tv Authority February 7, 1984 JAFP-84-0149 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washinghton, D.C. 20555 Attention: Document Control Desk

Reference:

Docket No. 50-333

Dear Sir:

The Operating Status Report for the Month of January, 1984 is enclosed. The refueling information remains the same as previously submitted.

If there are any questions concerning this report contact John Cook at (315) 342-3840, Ext. 439.

Very truly yours, a

Corbin A. McNeill, Jr.

CAM:JPC:jis Enclosures CC: Internal Distribution

j$

'/