JAFP-83-0718, Monthly Operating Rept for June 1983

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for June 1983
ML20024C333
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 07/08/1983
From: Jackie Cook, Corbin McNeil
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
JAFP-83-0718, JAFP-83-718, NUDOCS 8307120527
Download: ML20024C333 (11)


Text

.

s OPERATING DATA REPORT DOCKET NO. 50-333 DATE JULY 1983 COMPLETED BY J.

COOK TELEPHONE (3151342-3840 OPERATING STATUS

1. Unit Name: FITZPATRICK Notes
2. Reporting Period: 830601-830630 2436
3. Licensed Thermal Power (MWt): 653
4. Nameplate Rating (Gross MWe):

d21

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe): 830
7. Maximum Dependable Cap.scity (Net MWe):

810

- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report, Give Reasons:

NONE

^

9. Power Level To Which Restricted. If Any (Net MWe):

NONE

10. Reasons For Restrictions,If Any:

This Month Yr..to Date Cumulative

11. hsurs in Reporting Period 720 4343 69480
12. Number Of Hours Reactor Was Critical 7 ""

D*

13. Reactor Reserve Shutdown Hours 0

0 0~

14. Hours Generator On Line 65.4 3353 48368.2
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 81264 7669944 1011936Uz
17. Gross Electrical Energy Generated (MWH) 25500 2598480 35033260
18. Net Electrical Energy Generated (MWU) 24510 2518780 33353103
19. Unit Service Factor 9.1%

77.2%

69.6%

20. Unit Availability Factor 9.1%

77.2%

69.67,

21. Unit Capacity Factor (Using MDC Net) 4 2A

/1 DA D J 4 l'

22. Unit Capacity Factor (Using DER Net) -

4.1%

70.6%

58.5%

23. Unit Forced Outage Rate 0

9.17, 13.3A

24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

-8307120527 830731 PDR ADOCK 0500G333 t

.R PDR

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-333 FITZPATRICK UNIT JULY 1983 DATE COMPLETED BY J. COOK (315)342-3840 TELEPHONE MONTH JUNE 1983 DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe-NeO 465 0

1 17 2

424 0

18 132 0

3 19 4

0 20 0

s 0

0 21 0

6 0

22 7

0 0

23 0

0 8

24 0

0 9

25 0

0 to 26 11 0

0 27 0

0 12 28 0

13 29 0

14 0

is.

~

31 16 0

SUMARY:

The FitzPatrick plant operated at approximately 57% of full-thermal power for the first three days of the reporting Period. On 830603 the unit was taken off line for refueling.

50-333 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

1 UNIT NAME # 112* PAMICK DATE JULY 1953 REPORTMONTH JUNE 1983 COMPLETED By J.

COOK TELEPif0NE (315)342-3840

% u3

.E _e E

75'A Licensee E*

5" c

Cause & Corrective c

N"-

Ddte R

58 s

2sE Event u?

8 '.,

8 Action to H

$E jig Report at 50 V

Prevent Recurrence 6

8 830603 S

654.6 C

1 N/A N/A N/A Refueling Outage Commenced at 1722.

i 1

2 3

4 F: Forced Reason:

Method:

Exhibit G-Instructions i

S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C-Refucting

3. Automatic Scram.

Event Report (LER) File INUREG.

D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & Ucense Examination F Administrative 5

G-Operational Error (Explain)

Exhibit I - Same Source 11-O her(Explain) e us

\\

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE JUNE, 1983 4

The Unit operated at approximately 57% of full thermal power for the first three days of the reporting period. On 830603 the unit was taken off line to commence refueling operations.

i i

_., ' p. 'Z_

_. L:l. % *, % l - ; f

'.^l '; '.,L _ t '.;; _

l;,j.N j'

_f

'.'?'

^%_' y.XL.L j,.l g.;;;;.; r '.Q,7 n t t.l *. - (, f ' :, s _

,[ L 9 _. - ' '

W'_ V_j :

^

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

M REEST#

DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T E COMPONENT #

HOURS 5/26/8; 70 21684 OPS Compressor Wear Rebuilt Compressor RWC-2A 122 6/25/8:

10 27286 OPS Overload Relay Would Not Replaced Overload Relay 14 MOV-66A Trip 6/3/83 03 16278 OPS Normal Use Rebuilt Drive 29 CRD S/N 3054 6/7/83 03 25050 N/A No Failure' Limitorque Preventive Maintenance 11 MOV-20 6/6/83 11 17774 N/A No Failure Performed F-ST-6E 18 EV-14AGB 6/7/83 11 27639 LLRT Seat Leakage Lapped, Replaced Disc 6 spray 65 SLC-16 6/2/83 02 16263 N/A No Malfunction Performed Pre-inspection of Refuel Various Floor Equipment Prior to Vessel Dis-120 assembly 6/10/82 02 20731 N/A No Malfunction Disassembled Reactor Vessel For Refuelir g 625 V-1 i

6/10/82 02 24314 N/A No Malfunction Inspected Internals of Valve for Free-2 RV 71-J dom of Movement Vacuum Breaker 6/7/83 03 25114 N/A No Malfunction Perfonned Preventive Maintenance on 10 MOV-22 Motor Operator 6/9/83 13 25115 N/A No Malfunction Performed Preventive Mainten ince on 12 MOV-16 Motor Operator h-m

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT l

l SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

l WORK REQUEST #

REPAIR DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME f

HOURS 6/9/83 13 25051 N/A No blalfunction Performed Preventive h!aintenance on 8

h10V-15 blotor Operator 6/11/8i 27 18746 Operations Previous blaintenance Replaced Key 4

A0V-101B 6/11/6i 08 25958 Operations Leaking Fitting G Water In Replaced Union 6 Nipple G Blew Out 15 Refuel Bridge Lines Lines Air Compressor 6/9/83 13 17712 Visual Broken Sealtite Replaced Scaltite 4

A0V-22 6/14/8.i 08 20710 N/A No Failure Visual Inspection 10 Refuel Bridge 6/15/8 i 27 25911 LLRT Seat Leakage.

hiachined Plug, Ground Seat 30 CV-68 6/14/8 13 17752 N/A No Failure ISI Inspection 6

RCI-40 6/15/8i 23 25534 LLRT Packing Leakage Repacked 15 h10V-16 6/16/8.i 23 19480 N/A No Failure ISI Inspection 18 IIPI-61 6/14/8.i 15 19481 N/A No Failure ISI Inspection 3

RBC-59 6 61 6/18/8i 27 25789 LLRT Seat Leakage Replaced Seat, Disc 6 Piston Rings 7

SOV-123B

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

WORK REQUEST #

REPAIR DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME gf HOURS 6/18/8:

46 18000 N/A No Failure IS1 Inspection ESW-9B 6

6/20/8;,

08 25993 Operations Leaking Ilose Fittings Cut Off Iloses 6 Replaced Fittings 2

Refuel Bridge 6/29/8:

08 26672 Operations Loss of Power Replaced Fuse 1

Refuel Bridge 6/28/8:,

71 22999 Observation Dirty Cleaned 12 Station Batt.

A6B 6/29/8.;

93 22992 Preventive D.C. Fuel Oi'l Priming Pump Removed Jumper - Replaced Fuse 1

EDG-A,B 6 D Maintenance Fuse Jumpered 6/27/8.i 02 25780 LLRT Seat Leak Disassembled, Lapped, Reassembled 22 RWR-40A 6/27/8.;

02 25779 LLRT Seat Leak Disassembled, Lapped, Reassembled 23 RNR-13A 6/28/8.i 27 25787 LLRT Seat Leak Replaced Valve Internals 16 SOV-135B 6/28/8.i 76 25999 Ops S.T.

Governor Setting Increased Engine Speed 1

P-1 6/27/8.i 39 25917 LLRT Seat Leakage Disassembled, Lapped, Reassembled 30 SAS-11 6/24/8i 03 23000 Operations Faulty Switches Replaced Switches 92 P.I. Probes l

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT l

l SAFETY RELATED ELECTRICAL 8 MECHANICAL MAINTENANCE

SUMMARY

l l

DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE M

$/24/8i 08 26589 Operations Air Leaks Tightened Fittings 1

Refuel Bridge l

l c

s.

I

}

POWER AUTHORITY OF THE STATE OF NEW YORK p,1 g

JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

I&C JUNE 1983 i

WORK REQUEST #

CAUSE OF RESULTS OF ACTION TAKEN REPAIR DATE SYSTEM DUECTED COMPONENT #

MALFUNCTION MALFUNCTION TO PRECLUDE TIME RECURRENCE HOURS 6/8/83 02 017487 JIC Defective Bypass Bypass Valve Leaks Replaced Bypass 8

DPIS-116B Valve Valve 6/9/83 02 017488 JIC Defective Low Press Valve Leaks Replaced Valve 8

DPIS-116B ISOL Valve 6/8/83 02 017489 JIC Def'ective Bypass Bypass Valve Leaks Replaced Bypass 8

DPIS-118B Valve Valve 6/9/83 02 017490 JIC Defective Manifold Hi Side Isolation Replaced Manifold 13 DPIS-116C Leaks 6/9/83 02-3 017491 JIC Defective Test Rt. Hand Test Replaced Test 1

LITS-59A Valve Valve Threads Worn Valve 6/17/83 02-3 018912 JIC Needs Calibration Out of Calibration Calibrated 32 LIS-72C&D 6/21/83 02-3 021672 JIC Old Age Vents Are Leaking Replaced Vents 10 LITS-73 6/22/83 09.-3 022062 JIC Old Age Out of Tolerance Replaced Switch 26 LIS-72B

  1. 4 6/13/83 02-3 024936 JIC Old Age Leaky Isolation Replaced Manifolc 8

FT-64E Valve 6/22/83 02-3 025533 JIC New Scale Change Scale Needs to be Replaced Scale 4

LIS-101A-D Replaced 6/3/83 02-3 025555 JIC Dirty Traverse Rod Recorder Stuck Cleaned and Lubec 12 TR-89 Traverse Rod l

1 6/9/83 03 019972 OPS Loose Module Full Out Light Re-inserted 9

22-51 Not On Module

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

I&C JUNE 1983 WORK REQUEST #

CAUSE OF RESULTS OF ACTION TAKEN REPAIR DATE SYSTEM D UECTED hCU COMPONENT #

MALFUNCTION MALFUNCTION S

6/22/83 03 025995 OPS Defective Bulb Socket Can't Be Soldered Bulb 4

Z5 Socket Repaired To Socket 6/16/83 06 017455 JIC LI-94A-C & LR-97 Need To Change Removed & Redrew 3.5 LI-94A-C Need Scales Redrawr Instr Zero Scale 6/9/83 06 024367 JIC Defective Manifold Low Side Leaks Replaced Manifolc 4

LT-52C 6/11/83 07 02554 JIC Pre-Installation None Tested I:PRM's 46 LPRM's Test 6/1/83 07 025564 JIC Def High Voltage Replaced Power 3

SRM-B Power Supply Unstable Voltage Supply 4

6/9/83 13 016721 JIC Defective Nct Functionable Replaced Power 2

PT-68 Isolation Valve Supply 6/11/83 17 G25801 OPS Check Source Monitor Not Replaced Check 10 RIS-431 g g n,ing Source 6/15/83 76 025855 OPS Defective Relay Hi Temp Alarm Replaced RIA 56 CO2-PNL-7 For No Reason Relay 6/22/83 76 025882 OPS Dirty Fuse Holder Communication Inspected And 3

MPX-1 Line 2 Failure Cleaned 6/.7/83 76 025882 OPS Error When St Was Pump Failed To Test & Performed 2

P-1 Preformed Start ST-76C Sat 6/24/83 76 025963 OPS Switch Out Of

" Valve Open" IND Calibrated 12 FPP-1 Calibration Lite Not Function Switch I

6/23/83 76 026000 OPS Out Of Calibration Cauge Not Calibrated 2

i PI-103 Reading Properly Gauge

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

I&C JUNE 1983 WORK REQUEST #

DATE SYSTEM H

CAUSE OF RESULTS OF ACTION TAKEN REPAlR COMPONENT #

MALFUNCTION MALFUNCTION i

RECL R H

RS 6/20/83 93 020846 JIC Defective Meter Out' f Calibratior Replaced And 3

O AM-llD Calibrated Meter l

l l

A A

James A. FitzPatrick

  • Cuclear Power Plant P.O. Box 41 Lycoming NewYork13093 315 342.3840
  1. > NewWrkPbwer 4# Authority July 8, 1983 JAFP-83-0718 Director, Office of Inspection and. Enforcement U.S. Nuclear Regulatory Commission Washinghton, D.C. 20555 Attention:

Document Control Desk

Reference:

Docket No. 50-333

Dear Sir:

The Operating Status Report for the month of June, 1983 is enclosed. The refueling information remains the same as previosly submitted.

If there are any questions concerning this report contact John Cook at (315) 342-3840, Ext. 439.

Very truly yours, V.

W GURBIN A. McN LL, Jr.