JAFP-16-0109, Transmittal of Emergency Plan Updates

From kanterella
(Redirected from JAFP-16-0109)
Jump to navigation Jump to search
Transmittal of Emergency Plan Updates
ML16188A162
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/21/2016
From: Jackie Jones
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML16188A177 List:
References
JAFP-16-0109
Download: ML16188A162 (5)


Text

Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

James A FitzPatrick NPP P.O. Box 110 Lycoming, NY 13093 Tel 315-342-3840 James D. Jones Emergency Preparedness Manager JAFP-16-01 09 June 21, 2016 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555

Subject:

Transmittal of Emergency Plan Updates James A. FitzPatrick Nuclear Power Plant Docket No.50-333 License No. DPR-059

Dear Sir or Madam:

The documents enclosed with this letter are changes to the James A. FitzPatrick Nuclear Power Plant's (JAF) Emergency Plan made pursuant to 10 CFR 50.54(q). This transmittal fulfills the requirements of 10 CFR 50.54(q), 10 CFR 50 Appendix E Section V, '

10 CFR 70.32(i), and 10 CFR 72.44(f) to inform the commission of changes that have been made which do not decrease the effectiveness of the Emergency Plan.

The following documents (including change documentation) are attached:

  • Appendix N, Revision 21 (periodic review date only)
  • Appendix F, Revision 19 (periodic review date only)
  • EAP-13, Revision 22 (periodic review date only)

This letter contains no new regulatory commitments.

If you should have any questions, please contact Mr. James D. Jones at (315) 349-6030.

Sincerely,

~~

James D. Jones

,~*'

Emergency Preparedness Manager JDJ:cfv

JAFP-16-0109 Page 2 of 2 Enclosure(s):

Including change documentation:

  • Appendix D, Revision 9 (periodic review date only)
  • Appendix E, Revision 1O (periodic review date only)
  • EAP-13, Revision 22 (periodic review date only) cc w/o procedure documentation:

USNRC (l&E) Regional Administrator, Region I - Controlled - 2 Copies NRC Resident Inspector - Controlled - 1 Copy NRC Director NMSS - Uncontrolled - 1 Copy NRC Director Division of Spent Fuel Storage and Transportation - Uncontrolled - 1 Copy NRC Director, Division of Security Policy- Uncontrolled - 1 Copy NYSEMO - Controlled - 1 Copy OCEMO - Controlled - 1 Copy

JAFP-16-0109 Enclosures Including change documentation:

  • Appendix D, Revision 9 (periodic review date only)
  • Appendix E, Revision 10 (periodic review date only)
  • EAP-13, Revision 22 (periodic review date only)
  • ~Entergy NUCLEAR MANAGEMENT MANUAL QUALITY RELATED INFORMATIONAL USE NRC Correspondence EN-Ll-106 PAGE 1 OF2 REV.15 ATTACHMENT 9.4 NRC SUBMITTAL REVIEW Le~et #: JAFP-16-0109 Response Oue: 6/25/2016

Subject:

Transmittal of Emergency Plan Updates Date ls~lied for Review: 7/1/2016 Correspondence Preparer I Phone#: .Cathee Vickery 319-349"'.6777 Section I Letter Concurrence and Agreement to Perform Actions POSITION I NAME Action SJgnature (concurrence, certification, etc.) (sign, interoffice memo, e-mail, pt telecom)

Emergency Planning Dept. Preparer/Reviewer Cathee Vickery I (};rj t?P~y, J ~

(/,

Licensing Department Concurrence Mark Hawes I ~ .~

W

/

Emergency Preparedness Manager Approver James D. Jones I COMMENTS

- Appendix D, Revision 9 (periodic review date only)

- Appendix E, Revision 10 (periodic review date only)

- EAP-13, Revision 22 (periodic review date only)

Section II Correspondence Screening Does this letter contain commitments? If "yes," identify the commitments with due Yes D dates in the submittal and in Section Ill. When fleet letters contain commitments, a No 12:)

PCRS LO (e.g., LO-LAR, LO-WT) should be initiated with a CA assigned to each applicable site to enter the commitments into the site's commitment management system.

Does this letter contain any information or analyses of new safety issues performed at Yes D NRC request or to satisfy a regulatory requirement? If "yes, reflect requirement to No 12:)

update the UFSAR in Section Ill.

EN-Ll-106 REV 15

  • ~Entergy NUCLEAR MANAGEMENT MANUAL QUALITY RELATED INFORMATIONAL USE NRC Correspondence EN-Ll-106 PAGE 20F2 REV.15 ATTACHMENT 9.4 NRC SUBMITTAL REVIEW Does this letter require any document changes (e.g., procedures, DBDs, UFSAR, TS Yes D Bases, etc.), if approved? If "yes," indicate in Section Ill an action for the responsible No [8]

department to determine the affected documents. (The Correspondence Preparer may indicate the specific documents requiring revision, if known or may initiate an action for review.)

Does this letter contain information certified accurate? If "yes," identify the information Yes D and document certification in an attachment. (Attachment 9.5 must be used.) No [8]

Section Ill Actions and Commitments Required Actions Note: Actions needed upon approval should be captured in the Due Date Responsible Dept.

appropriate action tracking system N/A Commitments ... ..

Note: When fleet letters contain commitments, a PCRS LO should be initiated with a CA assigned to each applicable Due Date Responsible Dept.

site to enter the commitments into the site's commitment management system.

N/A Section IV

  • Final Document Signoff for Submittal Correspondence Preparer Cathee Vickery 1kli-LP~

Final Submittal Review (optional) NIA Responsible Department Head James. D. Jones I EN-Ll-106REV15