Response to Ti 2515/190: Inspection of the Proposed Interim Actions Associated with Near-Term Task Force Recommendation 2.1 Flooding Hazard
ML15343A505
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 12/09/2015
From: Adner C
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
IR 2015003, JAFP-15-0146, TI 2515/190
Download: ML15343A505 (3)


Text

~ Entergy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

James A . FitzPatrick NPP P.O. Box 110 Lycoming, NY 13093 Tel 315-342-3840 Chris M. Adner Regulatory Assurance Manager- JAF JAFP-15-0146 December 9, 2015 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Response to Tl 2515/190: Inspection of the Proposed Interim Actions Associated with Near-Term Task Force Recommendation 2.1 Flooding Hazard James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 License No. DPR-059

Reference:

NRC letter, James A. FitzPatrick Nuclear Power Plant - Integrated Inspection Report 05000333/2015003, ML15314A130, dated November 6, 2015

Dear Sir or Madam:

The Temporary Inspection (Tl) 2515/190, Inspection of the Licensee's Proposed Interim Actions as a Result of the Near-Term Task Force Recommendation 2.1 Flooding Reevaluation, was performed at James A. FitzPatrick Nuclear Power Plant (JAF) and the results were reported in inspection report dated November 6, 2015 [Reference]. During the inspection, the inspector identified a condition with doors seals which was entered into JAF's Corrective Action Process (CAP). The Attachment to this letter discusses the resolution of corrective actions to this condition.

This letter contains no new regulatory commitments. Should you have any questions, please contact me at (315) 349-6766.

Chris M. Adner Regulatory Assurance Manager CMA/mh

Attachment:

Resolution of Conditions Identified During Tl 2515/190 cc: Regional Administrator NRC Senior Resident Inspector Senior Project Manager

JAFP-15-0146 Attachment Resolution of Conditions Identified During TI 2515/190

JAFP-15-0146 Attachment Resolution of Conditions Identified During TI 2515/190 In September and October 2015 the NRC Resident Inspector performed TI 2515/190 at James A. FitzPatrick Nuclear Power Plant (JAF) for proposed interim actions as a result of the Near-Term Task Force Recommendation 2.1 Flooding Reevaluation [Reference 1]. The inspectors performed activities to verify Entergys conclusion that no interim actions were required. The inspection activities performed were based on questions provided by the NRC staff that reviewed Entergys near-term task force recommendation 2.1 flood hazard re-evaluation submittal, as well as the inspectors assessment of the hazard posed to safety-related equipment by the predicted flood levels. Results of this inspection were reported by Inspection Report 05000333/2015003 [Reference 2].

When the inspectors inspected the exterior doors that would present the path for water infiltration to assess the material condition of the doors and the door seals, they identified a condition which was placed in the corrective action program (CAP) as CR-JAF-2015-04387.

NRC Inspector identified plant doors with weather stripping that is degraded and/or missing. Weather stripping at these plant doors is credited with mitigating potential flood water intrusion from a BDBEE (Beyond Design Basis External Event) flooding event.

The degraded and/or missing weather stripping was investigated and corrected by the work management system.

Door Work Order Repair 88EOD-31 WO 00427171 Turbine building south west wall overhead door removed and replaced weather stripping 88EOD-32 WO 00427169 Turbine building north west wall overhead door repaired damaged weather stripping 88EOD-35 WO 00427168 Screenwell roll-up door removed and replaced weather stripping 52DR-SP-272-2 WO 00427164 Screenwell exterior personnel door added new weather stripping at the bottom of the door 52DR-A-272-13 WO 00427165 Administrative building exterior personnel door added new weather stripping at the bottom of the door In addition, a corrective action for periodic inspections of weather stripping to exterior doors identified as flood barriers for potential water intrusion has been initiated. It will be included in the Seasonal Weather Preparations procedure AP-12.04.

References

1. NRC inspection procedure, Inspection of the Licensee's Proposed Interim Actions as a Result of the Near-Term Task Force Recommendation 2.1 Flooding Reevaluation, TI 2515/190, ML15176A790
2. NRC letter, James A. FitzPatrick Nuclear Power Plant - Integrated Inspection Report 05000333/2015003, ML15314A130, dated November 6, 2015 Page 1 of 1

~ Entergy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

James A . FitzPatrick NPP P.O. Box 110 Lycoming, NY 13093 Tel 315-342-3840 Chris M. Adner Regulatory Assurance Manager- JAF JAFP-15-0146 December 9, 2015 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Response to Tl 2515/190: Inspection of the Proposed Interim Actions Associated with Near-Term Task Force Recommendation 2.1 Flooding Hazard James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 License No. DPR-059

Reference:

NRC letter, James A. FitzPatrick Nuclear Power Plant - Integrated Inspection Report 05000333/2015003, ML15314A130, dated November 6, 2015

Dear Sir or Madam:

The Temporary Inspection (Tl) 2515/190, Inspection of the Licensee's Proposed Interim Actions as a Result of the Near-Term Task Force Recommendation 2.1 Flooding Reevaluation, was performed at James A. FitzPatrick Nuclear Power Plant (JAF) and the results were reported in inspection report dated November 6, 2015 [Reference]. During the inspection, the inspector identified a condition with doors seals which was entered into JAF's Corrective Action Process (CAP). The Attachment to this letter discusses the resolution of corrective actions to this condition.

This letter contains no new regulatory commitments. Should you have any questions, please contact me at (315) 349-6766.

Chris M. Adner Regulatory Assurance Manager CMA/mh

Attachment:

Resolution of Conditions Identified During Tl 2515/190 cc: Regional Administrator NRC Senior Resident Inspector Senior Project Manager

JAFP-15-0146 Attachment Resolution of Conditions Identified During TI 2515/190

JAFP-15-0146 Attachment Resolution of Conditions Identified During TI 2515/190 In September and October 2015 the NRC Resident Inspector performed TI 2515/190 at James A. FitzPatrick Nuclear Power Plant (JAF) for proposed interim actions as a result of the Near-Term Task Force Recommendation 2.1 Flooding Reevaluation [Reference 1]. The inspectors performed activities to verify Entergys conclusion that no interim actions were required. The inspection activities performed were based on questions provided by the NRC staff that reviewed Entergys near-term task force recommendation 2.1 flood hazard re-evaluation submittal, as well as the inspectors assessment of the hazard posed to safety-related equipment by the predicted flood levels. Results of this inspection were reported by Inspection Report 05000333/2015003 [Reference 2].

When the inspectors inspected the exterior doors that would present the path for water infiltration to assess the material condition of the doors and the door seals, they identified a condition which was placed in the corrective action program (CAP) as CR-JAF-2015-04387.

NRC Inspector identified plant doors with weather stripping that is degraded and/or missing. Weather stripping at these plant doors is credited with mitigating potential flood water intrusion from a BDBEE (Beyond Design Basis External Event) flooding event.

The degraded and/or missing weather stripping was investigated and corrected by the work management system.

Door Work Order Repair 88EOD-31 WO 00427171 Turbine building south west wall overhead door removed and replaced weather stripping 88EOD-32 WO 00427169 Turbine building north west wall overhead door repaired damaged weather stripping 88EOD-35 WO 00427168 Screenwell roll-up door removed and replaced weather stripping 52DR-SP-272-2 WO 00427164 Screenwell exterior personnel door added new weather stripping at the bottom of the door 52DR-A-272-13 WO 00427165 Administrative building exterior personnel door added new weather stripping at the bottom of the door In addition, a corrective action for periodic inspections of weather stripping to exterior doors identified as flood barriers for potential water intrusion has been initiated. It will be included in the Seasonal Weather Preparations procedure AP-12.04.

References

1. NRC inspection procedure, Inspection of the Licensee's Proposed Interim Actions as a Result of the Near-Term Task Force Recommendation 2.1 Flooding Reevaluation, TI 2515/190, ML15176A790