|
---|
Category:Letter type:JAFP
MONTHYEARJAFP-23-0065, License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2023-12-14014 December 2023 License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications JAFP-23-0069, Supplemental Response to Part 73 Exemption Request Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements JAFP-23-0057, and Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 and Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation JAFP-23-0064, Emergency Plan Document Revision2023-11-15015 November 2023 Emergency Plan Document Revision JAFP-23-0063, Registration of Spent Fuel Cask Use2023-11-13013 November 2023 Registration of Spent Fuel Cask Use JAFP-23-0059, Registration of Spent Fuel Cask Use2023-10-24024 October 2023 Registration of Spent Fuel Cask Use JAFP-23-0048, Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-31031 August 2023 Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0050, Physical Security Plan, Revision 242023-08-31031 August 2023 Physical Security Plan, Revision 24 JAFP-23-0047, Correction to the 2022 Annual Radioactive Effluent Release Report2023-08-30030 August 2023 Correction to the 2022 Annual Radioactive Effluent Release Report JAFP-23-0040, License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-0303 August 2023 License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0043, 10 CFR 50.46 Annual Report2023-07-31031 July 2023 10 CFR 50.46 Annual Report JAFP-23-0038, License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance2023-07-28028 July 2023 License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance JAFP-23-0033, License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation2023-06-28028 June 2023 License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation JAFP-23-0025, 2022 Annual Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Annual Radiological Environmental Operating Report JAFP-23-0023, 2022 Annual Radioactive Effluent Release Report2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report JAFP-23-0010, 2022 REIRS Transmittal of NRC Form 52023-03-20020 March 2023 2022 REIRS Transmittal of NRC Form 5 JAFP-23-0008, Supplement to Inservice Inspection Summary Report Cycle 252023-02-22022 February 2023 Supplement to Inservice Inspection Summary Report Cycle 25 JAFP-22-0053, Inservice Inspection Summary Report Cycle 252022-12-20020 December 2022 Inservice Inspection Summary Report Cycle 25 JAFP-22-0046, Core Operating Limits Report Cycle 262022-10-17017 October 2022 Core Operating Limits Report Cycle 26 JAFP-22-0040, 10 CFR 50.46 Annual Report2022-07-29029 July 2022 10 CFR 50.46 Annual Report JAFP-22-0033, Core Operating Limits Report Mid-Cycle 252022-06-23023 June 2022 Core Operating Limits Report Mid-Cycle 25 JAFP-22-0032, Response to Request for Additional Information for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b..2022-06-16016 June 2022 Response to Request for Additional Information for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b.. JAFP-22-0030, Oswego County and New York State Participation in the Emergency Plan2022-05-13013 May 2022 Oswego County and New York State Participation in the Emergency Plan JAFP-22-0029, 2021 Annual Radiological Environmental Operating Report2022-05-11011 May 2022 2021 Annual Radiological Environmental Operating Report JAFP-22-0028, 2021 Annual Radioactive Effluent Release Report2022-04-27027 April 2022 2021 Annual Radioactive Effluent Release Report JAFP-22-0026, 2021 REIRS Transmittal of NRC Form 52022-04-0707 April 2022 2021 REIRS Transmittal of NRC Form 5 JAFP-22-2020, Supplemental Information No. 1 for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. and 10CFR 50.69, Risk-Info2022-03-0404 March 2022 Supplemental Information No. 1 for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. and 10CFR 50.69, Risk-Informed JAFP-22-0017, Amendments to Indemnity Agreements2022-02-15015 February 2022 Amendments to Indemnity Agreements JAFP-22-0007, Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102022-01-31031 January 2022 Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 JAFP-22-0010, Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments2022-01-24024 January 2022 Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments JAFP-22-0008, Response to Request for Supplemental Information by the Office of Nuclear Reactor Regulation to Support Review of a License Amendment Request to Eliminate Selected Response Time Testing for Reactor Protection System and Primary2022-01-14014 January 2022 Response to Request for Supplemental Information by the Office of Nuclear Reactor Regulation to Support Review of a License Amendment Request to Eliminate Selected Response Time Testing for Reactor Protection System and Primary JAFP-21-0093, Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation2021-10-18018 October 2021 Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position JAFP-21-0087, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-09-16016 September 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments JAFP-21-0083, Notification of Readiness for NRC 95001 Inspection2021-09-0909 September 2021 Notification of Readiness for NRC 95001 Inspection JAFP-21-0081, Supplement to Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2021-09-0303 September 2021 Supplement to Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements JAFP-21-0075, Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs2021-08-12012 August 2021 Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs JAFP-21-0073, Response to Request for Additional Information Regarding Application to Revise the James A. FitzPatrick Nuclear Power Plant Limiting Condition for Operation (LCO) 3.5.1, ECCS - Operating Surveillance.2021-08-0909 August 2021 Response to Request for Additional Information Regarding Application to Revise the James A. FitzPatrick Nuclear Power Plant Limiting Condition for Operation (LCO) 3.5.1, ECCS - Operating Surveillance. JAFP-21-0069, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2021-07-30030 July 2021 Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors JAFP-21-0070, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b2021-07-30030 July 2021 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b JAFP-21-0071, 10 CFR 50.46 Annual Report2021-07-29029 July 2021 10 CFR 50.46 Annual Report JAFP-21-0064, Supplemental Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting2021-07-0707 July 2021 Supplemental Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting JAFP-21-0053, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-14014 June 2021 Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0052, Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-13013 June 2021 Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0051, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-13013 June 2021 Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0050, Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-12012 June 2021 Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0044, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-06-11011 June 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments JAFP-21-0042, Reply to a Notice of Violation; EA-20-1382021-06-0303 June 2021 Reply to a Notice of Violation; EA-20-138 JAFP-21-0041, Supplement to Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2021-05-17017 May 2021 Supplement to Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing JAFP-21-0040, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2021-05-14014 May 2021 Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs 2023-08-31
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARJAFP-23-0065, License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2023-12-14014 December 2023 License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications JAFP-23-0048, Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-31031 August 2023 Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0040, License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-0303 August 2023 License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0038, License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance2023-07-28028 July 2023 License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance JAFP-23-0033, License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation2023-06-28028 June 2023 License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21277A1932021-11-16016 November 2021 Enclosure 2, Draft Conforming License Amendments ML21181A0572021-11-0404 November 2021 Issuance of Amendment No. 344 Adoption of TSTF-545 JAFP-21-0093, Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation2021-10-18018 October 2021 Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position JAFP-21-0069, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2021-07-30030 July 2021 Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors JAFP-21-0053, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-14014 June 2021 Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0051, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-13013 June 2021 Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0050, Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-12012 June 2021 Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement ML21144A1072021-05-17017 May 2021 Acceptance of Requested Licensing Action License Amendment Request to Adopt TSTF-582 JAFP-21-0041, Supplement to Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2021-05-17017 May 2021 Supplement to Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing JAFP-21-0040, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2021-05-14014 May 2021 Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments ML21057A2732021-02-25025 February 2021 Application for Order Approving License Transfers and Proposed Conforming License Amendments JAFP-20-0080, Application to Revise Surveillance Requirement (SR) 3.5.1.62020-12-11011 December 2020 Application to Revise Surveillance Requirement (SR) 3.5.1.6 JAFP-20-0083, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule2020-12-11011 December 2020 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing JAFP-20-0047, License Amendment Request: Application to Modify Technical Specifications 3.6.1.3, Primary Containment Isolation Valves2020-06-30030 June 2020 License Amendment Request: Application to Modify Technical Specifications 3.6.1.3, Primary Containment Isolation Valves JAFP-20-0046, License Amendment Request for Adoption of TSTF-478-A, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control, Using the Consolidated Line Item.2020-06-30030 June 2020 License Amendment Request for Adoption of TSTF-478-A, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control, Using the Consolidated Line Item. RS-20-025, Supplement to Exelon Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2020-02-24024 February 2020 Supplement to Exelon Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls JAFP-20-0012, License Amendment Request - Application to Adopt Technical Specification Task Force Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, Using the Consolidated Line...2020-01-23023 January 2020 License Amendment Request - Application to Adopt Technical Specification Task Force Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, Using the Consolidated Line... ML19295G7832019-12-19019 December 2019 Issuance of Amendment No. 331 Regarding Change to Technical Specifications to Remove Ultimate Heat Sink Bar Rack Heaters ML19277D5522019-10-0404 October 2019 Draft James A. FitzPatrick Nuclear Power Plant - Emergency License Amendment Request - One Time Extension to the TS 3.8.1 Action A.3 Completion Time for an Inoperable Offsite Source ML19277G0852019-10-0404 October 2019 Emergency License Amendment Request: One Time Extension to the TS 3.8.1 Action A.3 Completion Time for an Inoperable Offsite Source ML19276G3132019-10-0202 October 2019 Draft Exigent License Amendment Request - One Time Extension to the TS 3.8.1 Action A.3 Completion Time for an Inoperable Offsite Source JAFP-19-0092, Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers2019-09-26026 September 2019 Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers JAFP-19-0089, License Amendment Request - Proposed Changes to the Technical Specifications Related to Primary Containment Hydrodynamic Loads2019-09-12012 September 2019 License Amendment Request - Proposed Changes to the Technical Specifications Related to Primary Containment Hydrodynamic Loads JAFP-19-0083, License Amendment Request - Proposed Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation2019-09-0505 September 2019 License Amendment Request - Proposed Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation RS-19-044, License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions2019-08-28028 August 2019 License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions ML19157A2032019-07-11011 July 2019 Issuance of Amendment No. 325 Reactivity Anomalies Surveillance JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-19-040, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-06-25025 June 2019 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program RS-19-038, Supplement to the Application to Adopt TSTF-564, Safety Limit MCPR2019-03-0707 March 2019 Supplement to the Application to Adopt TSTF-564, Safety Limit MCPR JAFP-19-0033, License Amendment Request - Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Revision 02019-03-0707 March 2019 License Amendment Request - Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Revision 0 RS-19-003, Application to Adopt TSTF-564, Safety Limit Mcpr.2019-02-0101 February 2019 Application to Adopt TSTF-564, Safety Limit Mcpr. JAFP-18-0106, License Amendment Request: Proposed Change to the Technical Specifications to Remove Ultimate Heat Sink Bar Rack Heaters from Technical Specifications2018-11-29029 November 2018 License Amendment Request: Proposed Change to the Technical Specifications to Remove Ultimate Heat Sink Bar Rack Heaters from Technical Specifications RS-18-130, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO2018-11-0101 November 2018 Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO JAFP-18-0093, License Amendment Request - Reactivity Anomalies Surveillance2018-10-0202 October 2018 License Amendment Request - Reactivity Anomalies Surveillance ML18292A5282018-09-25025 September 2018 Technical Evaluation Input for License Amendment Request to Remove Requirements for Deicing Heaters from Technical Specification 3.7.2 RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement2018-06-15015 June 2018 Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement JAFP-18-0048, James A. Fitzpatrick, Unit 1, License Amendment Request - Safety Limit Minimum Critical Power Ration Change2018-05-17017 May 2018 James A. Fitzpatrick, Unit 1, License Amendment Request - Safety Limit Minimum Critical Power Ration Change RS-17-161, Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR)2018-03-0101 March 2018 Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR) JAFP-18-0014, James A. FitzPatrick Nuclear Power Plant - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors2018-01-31031 January 2018 James A. FitzPatrick Nuclear Power Plant - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors JAFP-18-0014, Attachment 1: License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors2018-01-31031 January 2018 Attachment 1: License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML18037A7872018-01-31031 January 2018 Attachment 1: License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors 2023-08-31
[Table view] Category:Technical Specifications
MONTHYEARML23095A3762023-04-0505 April 2023 Enclosure 4: Technical Requirements Manual (TRM) Revision 109 ML22196A0612022-08-23023 August 2022 Issuance of Amendment No. 352 Adoption of 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22166A4302022-07-15015 July 2022 Issuance of Amendment No. 351 Removal of Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation JAFP-22-0032, Response to Request for Additional Information for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b..2022-06-16016 June 2022 Response to Request for Additional Information for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b.. ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V JAFP-21-0022, Technical Requirements Manual Specifications - Redacted2022-03-29029 March 2022 Technical Requirements Manual Specifications - Redacted ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21131A1272021-08-0909 August 2021 Issuance of Amendment No. 343 Modifications to Technical Specification 3.6.1.3, Primary Containment Isolation Valves (Pcivs) ML21166A3662021-06-17017 June 2021 Correction to Amendment No. 342 Issued June 14, 2021, One Time Extension to Technical Specifications 3.5.1, 3.6.1.9, and 3.6.4.1 Completion Times to Support Residual Heat Removal Pump Motor Replacement (Emergency Circumstances) ML21162A0422021-06-14014 June 2021 Issuance of Amendment No. 342, One Time Extension of Completion Times to Support Residual Heat Removal Pump Motor Replacement (Emergency Circumstances) ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML20140A0702020-07-21021 July 2020 Issuance of Amendment No. 338 Application of Alternative Source Term for Calculating Loss-of-Coolant Accident Dose Consequences ML20094G9032020-06-0202 June 2020 Issuance of Amendment No. 335 Adoption of TSTF-372, Addition of LCO 3.0.8, 'Inoperability of Snubbers' RS-20-016, County, Nine Mile Point, Peach Bottom Atomic and Quad Cities - Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems2020-04-13013 April 2020 County, Nine Mile Point, Peach Bottom Atomic and Quad Cities - Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems ML20024C6612020-03-0202 March 2020 Issuance of Amendment No. 332 Adopt TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, Using the Consolidated Line Item Improvement Process ML19301C5552019-10-28028 October 2019 Technical Specification Bases B.3.3.5.2 and B3.3.6.1 Provided by Licensee to Support a 10/28/2019 Public Meeting to Discuss Draft Response to Request for Supplemental Information to Revise Allowable Value for RWCU System Primary Containment ML19277D5522019-10-0404 October 2019 Draft James A. FitzPatrick Nuclear Power Plant - Emergency License Amendment Request - One Time Extension to the TS 3.8.1 Action A.3 Completion Time for an Inoperable Offsite Source ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML18214A7062018-09-19019 September 2018 Issuance of Amendment No. 322, Revise Technical Specification 2.1.1, Reactor Core Sls, to Change Cycle 24 Safety Limit Minimum Critical Power Ratio Numeric Values RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement2018-06-15015 June 2018 Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement JAFP-16-0142, Revision to Technical Specification (TS) Administrative Controls for Staffing and Training Upon Permanent Cessation of Operation (CAC No. MF7280) - Supplement 22016-09-19019 September 2016 Revision to Technical Specification (TS) Administrative Controls for Staffing and Training Upon Permanent Cessation of Operation (CAC No. MF7280) - Supplement 2 JAFP-16-0077, Response to Request for Additional Information (RAI) Regarding Revision to Technical Specification (TS) Administrative Controls for Staffing and Training Upon Permanent Cessation of Operation (CAC No. MF7280) - Supplement 12016-06-0303 June 2016 Response to Request for Additional Information (RAI) Regarding Revision to Technical Specification (TS) Administrative Controls for Staffing and Training Upon Permanent Cessation of Operation (CAC No. MF7280) - Supplement 1 ML16062A3882016-04-0606 April 2016 Issuance of Amendment No. 311 Cyber Security Plan Implementation Schedule ML15014A2772015-02-0909 February 2015 Issuance of Amendment Application to Revise Technical Specifications for Technical Specification Low Pressure Safety Limit ML14202A3722014-12-0101 December 2014 Issuance of Amendment 308 License Amendment Request - Cyber Security Plan Implementation Schedule Milestone 8 ML14086A1522014-07-16016 July 2014 Issuance of Amendment Change to Renewed Facility Operating License Condition 2.T JAFP-14-0047, Proposed Change to Technical Specification Concerning the Safety Limit Minimum Critical Power Ratio2014-05-0101 May 2014 Proposed Change to Technical Specification Concerning the Safety Limit Minimum Critical Power Ratio ML14085A4462014-04-14014 April 2014 Issuance of Amendment Revision to the Definition of Shut Down Margin, by Adopting the Nuclear Regulatory Commission Approved Technical Specification Task Force (TSTF) Standard Technical Specification (STS) CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications ML1134308512012-02-14014 February 2012 License Amendment, Issuance of Amendment Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program JAFP-11-0046, 2011 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal2011-04-0606 April 2011 2011 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal ML1024604012010-09-27027 September 2010 ME3786, Letter - Issuance of Amendment to Renewed FOL SLMCPR JAFP-09-0132, Application for Amendment to Modify the Technical Specifications Requirements for Testing of Safety/Relief Valves2009-11-23023 November 2009 Application for Amendment to Modify the Technical Specifications Requirements for Testing of Safety/Relief Valves JAFP-09-0131, Application for Amendment to Modify Technical Specifications Section 5.5.7, Inservice Testing Program, to Reference the Current Code of Record2009-11-23023 November 2009 Application for Amendment to Modify Technical Specifications Section 5.5.7, Inservice Testing Program, to Reference the Current Code of Record JAFP-09-0070, Emergency License Amendment Request Application for Technical Specification 3.8.1 Required Action B.4 Completion Time2009-06-0404 June 2009 Emergency License Amendment Request Application for Technical Specification 3.8.1 Required Action B.4 Completion Time ML0915507232009-06-0303 June 2009 Emergency License Amendment Request Application for Technical Specification 3.8.1 Required Action B.4 Completion Time - (Draft) ML0828203902008-10-0303 October 2008 Technical Specification Relocation of Pressure and Temperature Curves to the Pressure and Temperature Limits Report Consistent with TSTF-419-A ML0810102422008-09-0808 September 2008 Renewed Facility Operating License No. DPR-59 / Appendix a - Technical Specifications JAFP-08-0034, Application for Amendment to Technical Specifications Regarding Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR) Consistent with TSTF-419-A2008-04-22022 April 2008 Application for Amendment to Technical Specifications Regarding Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR) Consistent with TSTF-419-A JAFP-08-0006, Application for Amendment to Technical Specifications Regarding Diesel Fuel Oil, Lube Oil, and Starting Air Consistent with TSTF-501 and Diesel Fuel Oil Testing Program Consistent with TSTF-3742008-01-22022 January 2008 Application for Amendment to Technical Specifications Regarding Diesel Fuel Oil, Lube Oil, and Starting Air Consistent with TSTF-501 and Diesel Fuel Oil Testing Program Consistent with TSTF-374 ML0800804572008-01-0303 January 2008 Technical Specifications, Issuance of Amendment Technical Specifications Regarding Control Room Envelope Habitability, Consistent with Technical Specification Task Force-448 JAFP-07-0124, Revision to Application for Technical Specifications (TS) Change Based on TSTF-477, Add Action Statement for Two Inoperable Control Room Air Conditioning Subsystems, Using the Consolidated Line Item Improvement Process (CLIIP)2007-11-0101 November 2007 Revision to Application for Technical Specifications (TS) Change Based on TSTF-477, Add Action Statement for Two Inoperable Control Room Air Conditioning Subsystems, Using the Consolidated Line Item Improvement Process (CLIIP) JAFP-07-0098, Supplement to Application for Amendment to Technical Specifications Regarding Control Room Envelope Habitability, Consistent with TSTF-448 Revision 32007-08-13013 August 2007 Supplement to Application for Amendment to Technical Specifications Regarding Control Room Envelope Habitability, Consistent with TSTF-448 Revision 3 JAFP-07-0088, James A. FitzPatrick, Application for Amendment to Technical Specifications Regarding Control Room Envelope Habitability, Consistent with TSTF-448 Revision 32007-07-17017 July 2007 James A. FitzPatrick, Application for Amendment to Technical Specifications Regarding Control Room Envelope Habitability, Consistent with TSTF-448 Revision 3 ML0717601272007-06-21021 June 2007 Technical Specifications (Ts), Revised TS 3.10.1, Inservice Leak and Hydrostatic Testing Operation, Consistent with Technical Specification Task Force-484 ML0714303022007-05-17017 May 2007 Technical Specifications, Allow Additional Startup and Operating Flexibility and an Expanded Operating Domain JAFP-07-0023, Application for Amendment to Technical Specifications 3.10.1. Re Inservice Leak and Hydrostatic Testing Operation, Consistent with TSTF-4842007-02-15015 February 2007 Application for Amendment to Technical Specifications 3.10.1. Re Inservice Leak and Hydrostatic Testing Operation, Consistent with TSTF-484 ML0625802332006-09-14014 September 2006 Tech Spec Pages for Amendment 286 Technical Specifications on DC Electrical System Requirements 2023-04-05
[Table view] |
Text
" Entergy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
James A. Fitzpatrick NPP P.O. Box 110 Lycoming, NY 13093 Pete Dietrich Site Vice President JAFP-09-0131 November 23, 2009 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555
SUBJECT:
Application for Amendment to Modify Technical Specifications Section 5.5.7, Inservice Testing Program, to Reference the Current Code of Record James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 License No. DPR-59
REFERENCE:
Entergy Letter, Proposed Relief Requests for the James A. FitzPatrick Nuclear Power Plant Fourth Interval In-Service Testing Program, JAFP-07-0050, dated April 11, 2007
Dear Sir or Madam:
Pursuant to 10 CFR 50.90, Entergy Nuclear Operations, Inc. (Entergy) hereby requests an amendment to the Technical Specifications (TS) for the James A. FitzPatrick Nuclear Power Plant (JAF).
This license amendment submittal requests replacing the TS 5.5.7 (Inservice Testing Program) references from the ASME Boiler and Pressure Vessel Code to the current code of record, the ASME Operation and Maintenance Nuclear Power Plants Code. This is an administrative amendment, to maintain the TS current with the NRC accepted code of record for JAF. provides a description and evaluation of the proposed TS additions. provides the proposed TS changes as marked up pages. provides the proposed TS changes in final typed format with change bars. provides the proposed TS Bases changes as marked up pages.
The Bases changes are provided for NRC information only. The final TS Bases pages will be submitted with a future update consistent with the code change in TS 5.5.7.
Entergy requests NRC approval of the proposed TS amendment by May 23, 2010, with the amendment being implemented within 30 days from approval.
In accordance with 10 CFR 50.91, a copy of this application, with the associated attachments, is being provided to the designated New York State official.
ýOLt?
JAFP-09-0131 Page 2 of 3 There is no new commitment made in this letter.
Questions concerning this request may be addressed to Mr. Joseph Pechacek, Licensing Manager, at (315) 349-6766.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on the 23 dA o November 2009.
PD/JP/ed Attachments: 1. Application for Amendment to Modify Technical Specifications Section 5.5.7, Inservice Testing Program, to Reference the Current Code of Record
- 2. Proposed Technical Specification Changes (Marked up)
- 3. Proposed Technical Specification Changes (Final Typed)
- 4. Proposed Technical Specification Bases Changes (Marked up) (Information Only) cc: next page
JAFP-09-0131 Page 3 of 3 cc:
Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Resident Inspector's Office U.S. Nuclear Regulatory Commission James A. FitzPatrick Nuclear Power Plant P.O. Box 136 Lycoming, NY 13093 Mr. Bhalchandra Vaidya, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8-C2A Washington, DC 20555-0001 Mr. Paul Eddy New York State Department of Public Service 3 Empire State Plaza, 1 0 th Floor Albany, NY 12223 Mr. Francis Murray, President NYSERDA 17 Columbia Circle Albany, NY 12203-6399
JAFP-09-0131 Attachment 1 Description and Evaluation Application for Amendment to Modify Technical Specifications Section 5.5.7, Inservice Testing Program, to Reference the Current Code of Record (3 Pages)
JAFP-09-0131 Attachment 1
1.0 DESCRIPTION
The proposed amendment would modify the Technical Specification (TS) 5.5.7, Inservice Testing Program, by replacing the references from the ASME Boiler and Pressure Vessel Code to the current code of record, the ASME Operation and Maintenance Nuclear Power Plants Code (ASME OM Code). This is an administrative amendment to maintain the TS current with the NRC accepted code of record for JAF.
2.0 PROPOSED CHANGE
S Currently, TS 5.5.7, Item a. refers to "Section XI of the ASME Boiler and Pressure Vessel Code" and to the "ASME Boiler and Pressure Vessel Code." However, those references are outdated and should be changed to the ASME OM Code, so that the TS is current with respect to the code of record for the James A. FitzPatrick Nuclear Power Plant (JAF) Inservice Testing Program as referenced in the Fourth Inservice Testing Interval Relief Requests submitted to the NRC on April 11, 2007 (Reference 1).
TS Bases will be revised to also address the ASME OM Code.
3.0 BACKGROUND
10 CFR 50.55a, Codes and standards, (Reference 2) has been modified, to allow the use of the ASME OM Code for inservice testing, affectively replacing Section Xl of the ASME Boiler and Pressure Vessel Code. Plus, Regulatory Guide 1.192 (Reference 3) was issued to provide guidance on the acceptability of the ASME OM Code.
Consistent with References 1, 2, and 3, the JAF code of record for its Inservice Testing Program has been changed to the ASME OM Code. This is reflected in the Reference 4 NRC Safety Evaluation which states "The James A. FitzPatrick Nuclear Power Plant fourth 10-year IST interval began on September 27, 2007. The program was developed in accordance with the 2001 Edition through 2003 Addenda of the ASME OM Code."
Currently, JAF TS 5.5.7 still references to the ASME Boiler and Pressure Vessel Code, and thus, those references need to be revised.
4.0 TECHNICAL ANALYSIS
There is no technical change being requested. TS changes simply revise two outdated references to reflect the NRC accepted code of reference for the JAF Inservice Testing Program Fourth 10-Year Interval.
Page 1 of 3
JAFP-09-0131 Attachment 1 5.0 REGULATORY SAFETY ANALYSIS 5.1 No Significant Hazards Consideration
- 1. Will operation of the facility in accordance with this proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No.
The proposed TS changes are non-technical, and are provided for consistency. There is no plant change involved, and thus, proposed TS changes do not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Will operation of the facility in accordance with this proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No.
The proposed TS changes are non-technical, i.e., there is no plant change involved, and thus, do not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Will operation of the facility in accordance with this proposed change involve a significant reduction in a margin of safety?
Response: No.
The proposed TS changes are non-technical, i.e., there is no plant change involved.
The changes are consistent with the regulations, and only update the TS to refer to the current code of reference. No design or safety margin is involved. Therefore, the proposed changes do not involve a significant reduction in any margin of safety.
5.2 Applicable Regulatory Requirements / Criteria 10 CFR 50.55a allows the use of the ASME OM Code for inservice testing. Consistent with 10 CFR 50.55a, the JAF code of record for its Fourth 10 Year Interval Inservice Testing Program has been changed to the ASME OM Code, and the TS are to be revised to reflect the change to the ASME OM Code.
In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner; (2) such activities will be conducted in compliance with the Commission's regulations; and (3) the approval of the proposed change will not be inimical to the common defense and security or to the health and safety of the public.
Page 2 of 3
JAFP-09-0131 Attachment 1 6.0 ENVIRONMENTAL ASSESSMENT A review has determined that the proposed changes would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement.
However, the proposed changes do not involve: (i) a significant hazards consideration; (ii) a significant change in the types or significant increase in the amounts of any effluents that may be released offsite; or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed changes meet the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed changes.
7.0 REFERENCE(S)
- 1. Entergy Letter, Proposed Relief Requests for the James A. FitzPatrick Nuclear Power Plant Fourth Interval In-Service Testing Program, JAFP-07-0050, dated April 11, 2007
- 2. USNRC, Code of Federal Regulations, Section 10 CFR 50.55a, "Codes and standards."
- 3. USNRC, Regulatory Guide 1.192, "Operation and Maintenance Code Case Acceptability, ASME OM Code," Revision 0, June 2003.
- 4. NRC (Mark G. Kowal) letter to Entergy (Michael A. Balduzzi), "JAMES A. FITZPATRICK NUCLEAR POWER PLANT - RELIEF REQUESTS FOR THE FOURTH INTERVAL INSERVICE TESTING PROGRAM (TAC NOS. MD5396, MD5397, MD5398, MD5399, MD5400, MD5401, MD5402, MD5403, AND MD5404)," November 27, 2007.
Page 3 of 3
JAFP-09-0131 Attachment 2 Proposed Technical Specification Changes (Marked up)
Page 5.5-6
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.6 Primary Containment Leakage Rate Testing Program (continued)
- d. The provisions of SR 3.0.3 are applicable to the Primary Containment Leakage Rate Testing Program.
- e. Nothing in these Technical Specifications shall be construed to modify the testing Frequencies required by 10 CFR 50, Appendix J.
5.5.7 Plant Staff This program provides controls for inservice testing of certain ASME Code Class 1, 2, and 3 pumps and valves. The program shall include the following:
- a. Testing Frequencies specified in Seeti*n XI of the ASME Beiler-anid-Pressure Vcssel OM Code and applicable Addenda are as follows:
ASME Boiler and Pressure Vessel OM Code and applicable Addenda terminology for Required Frequencies inservice testing for performing inservice activities testing activities WAeekly At. least once per 7 days Month!ly At, le-ast oence per 31 days Quarterly or every 3 months At least once per 92 days Semanna"ye PUPR9 n rgAR+F4.q At least once per 184 days Every 9 moenths At least once per 276 days YseayOFanually- eas one-per 366 days At Biennially or every 2 years At least once per 731 days
- b. The provisions of SR 3.0.2 are applicable to the above required Frequencies for performing inservice testing activities;
- c. The provisions of SR 3.0.3 are applicable to inservice testing activities; and (continued)
JAFNPP 5.5-6 Amendment
JAFP-09-0131 Attachment 3 Proposed Technical Specification Changes (Final Typed)
Page 5.5-6
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.6 Primary Containment Leakage Rate Testing Program (continued)
- d. 'The provisions of SR 3.0.3 are applicable to the Primary Containment Leakage Rate Testing Program.
- e. Nothing in these Technical Specifications shall be construed to modify the testing Frequencies required by 10 CFR 50, Appendix J.
5.5.7 Plant Staff This program provides controls for inservice testing of certain ASME Code Class 1, 2, and 3 pumps and valves. The program shall include the following:
- a. Testing Frequencies specified in the ASME OM Code and applicable Addenda are as follows:
ASME OM Code and applicable Addenda terminology for Required Frequencies inservice testing for performing inservice activities testing activities Quarterly or every 3 months At least once per 92 days Biennially or every I 2 years At least once per 731 days
- b. The provisions of SR 3.0.2 are applicable to the above required Frequencies for performing inservice testing activities;
- c. The provisions of SR 3.0.3 are applicable to inservice testing activities; and (continued)
JAFNPP 5.5-6 Amendment
JAFP-09-0131 Attachment 4 Proposed Technical Specification Bases Changes (Marked up)
(Information Only)
Pages B 3.5.1-12 B 3.5.1-17 B 3.6.1.9-4 B 3.6.1.9-5 B 3.6.2.3-4
ECCS-- Operating B 3.5.1 BASES (continued)
SURVEILLANCE SR 3.5.1.6 REQUIREMENTS (continued) Cycling the recirculation pump discharge valves through one complete cycle of full travel demonstrates that the valves are mechanically OPERABLE and will close when required. Upon initiation of an automatic LPCI subsystem injection signal, these valves are required to close to ensure full LPCI subsystem flow injection in the reactor via the recirculation jet pumps. De-energizing the valve in the closed position will also ensure the proper flow path for the LPCI subsystem. Acceptable methods of de-energizing the valve include de-energizing breaker control power, racking out the breaker or removing the breaker.
The specified Frequency is once during reactor startup before THERMAL POWER is > 25% RTP. However, this SR is modified by a Note that states the Surveillance is only required to be performed if the last performance was more than 31 days ago. Verification during reactor startup prior to reaching > 25% RTP is an exception to the normal Inservice Testing Program generic valve cycling Frequency of 92 days, but is considered acceptable due to the demonstrated reliability of these valves. If the valve is inoperable and in the open position, the associated LPCI subsystem must be declared inoperable.
SR 3.5.1.7. SR 3.5.1.8. and SR 3.5.1.9 The performance requirements of the low pressure ECCS pumps are determined through application of the 10 CFR 50, Appendix K criteria (Ref. 8). This periodic Surveillance is performed (in accordance with the ASME Operation and Maintenance Nuclear Power Plants Code (ASME OM Code. Ref. 14),-,Seetii-X*X, requirements for the ECCS pumps) to verify that the ECCS pumps will develop at least the flow rates required by the respective analyses. The low pressure ECCS pump flow rates ensure that adequate core cooling is provided to satisfy the acceptance criteria of Reference 10. The pump flow rates are verified against a system head equivalent to the RPV pressure expected during a LOCA. The total system pump outlet pressure is adequate to overcome the elevation head pressure between the pump suction and the vessel discharge, the piping friction losses, and RPV pressure present during a LOCA. These values may be established during preoperational testing.
The flow tests for the HPCI System are performed at two different pressure ranges such that system capability to provide rated flow against a system head corresponding to (continued)
JAFNPP B 3.5.1-12 Revision
ECCS- Operating B 3.5.1 BASES (continued)
SURVEILLANCE SR 3.5.1.13 (continued)
REQUIREMENTS The Frequency of 24 months on a STAGGERED TEST BASIS ensures that both solenoids for each ADS valve are alternately tested. The Frequency is based on the need to perform the Surveillance under the conditions that apply during a startup from a plant outage.
Operating experience has shown that these components usually pass the SR when performed at the 24 month Frequency, which is based on the refueling cycle. Therefore, the Frequency was concluded to be acceptable from a reliability standpoint.
REFERENCES 1. UFSAR, Section 6.4.3.
- 2. UFSAR, Section 6.4.4.
- 3. UFSAR, Section 6.4.1.
- 4. UFSAR, Section 6.4.2.
- 5. NEDC-31317P, Revision 2, James A. FitzPatrick Nuclear Power Plant SAFER/GESTR-LOCA, Loss-of-Coolant Accident Analysis, April 1993.
- 6. UFSAR, Section 14.6.1.5.
- 7. UFSAR, Section 14.6.1.3.
- 8. 10 CFR 50, Appendix K.
- 9. UFSAR, Section 6.5.
- 10. 10 CFR 50.46.
- 11. 10 CFR 50.36(c)(2)(ii).
- 12. Memorandum from R.L. Baer (NRC) to V. Stello, Jr. (NRC),
Recommended Interim Revisions to LCOs for ECCS Components, December 1, 1975.
- 13. UFSAR, Section 4.4.5.
- 14. ASME Operation and Maintenance Nuclear Power Plants Code, 2001 Edition through 2003 Addenda.
JAFNPP B 3.5.1-17 Revision
RHR Containment Spray System B 3.6.1.9 BASES (continued)
SURVEILLANCE SR 3.6.1.9.1 (continued)
REQUIREMENTS also allowed to be in the nonaccident position provided it can be aligned to the accident position within the time assumed in the accident analysis. This is acceptable since the RHR Containment Spray System is manually initiated. This SR does not require any testing or valve manipulation; rather, it involves verification that those valves capable of being mispositioned are in the correct position. This SR does not apply to valves that cannot be inadvertently misaligned, such as check valves.
The 31 day Frequency of this SR is justified because the valves are operated under procedural control and because improper valve position would affect only a single subsystem. This Frequency has been shown to be acceptable based on operating experience.
SR 3.6.1.9.2 Verifying each required RHR pump develops a flow rate > 7750 gpm while operating in the suppression pool cooling mode with flow through the associated heat exchanger ensures that pump performance has not degraded during the cycle. It is tested in the pool cooling mode to demonstrate pump OPERABILITY without spraying down equipment in the drywell. Flow is a normal test of centrifugal pump performance required by the ASME Operation and Maintenance Nuclear Power Plants Code (ASME OM Code)-Gode-Seti*n- XI (Ref. 6). This test confirms one point on the pump performance curve and is indicative of overall performance. Such inservice tests confirm component OPERABILITY, trend performance, and detect incipient failures by indicating abnormal performance.
The Frequency of this SR is in accordance with the Inservice Testing Program.
SR 3.6.1.9.3 This Surveillance is performed every 10 years by introduction of air to verify that the spray nozzles are not obstructed and that flow will be provided when required. The 10 year Frequency is adequate to detect degradation in performance due to the passive nozzle design and its normally dry state and has been shown to be acceptable through operating experience.
(continued)
JAFNPP B 3.6.1.9-4 Revision
RHR Containment Spray System B 3.6.1.9 BASES (continued)
REFERENCES 1. UFSAR, Table 5.2-1.
- 2. UFSAR, Section 5.2.4.4.
- 3. UFSAR, Section 14.6.
- 4. GE-NE-T23-00737-01, James A. FitzPatrick Nuclear Power Plant Higher RHR Service Water Temperature Analysis, August 1996.
- 5. 10 CFR 50.36(c)(2)(ii).
- 6. ASMET Operation and Maintenance Nuclear Power Plants Code, 2001 Edition through 2003 Addenda.Belcr and , PressUrc Vessel Godc, Sectin Xl.
- 7. JAF-RPT-06-00063, Rev. 0, Drywell Spray Flow Rate Design and Licensing Bases, September 19, 2006.
JAFNPP B 3.6.1.9-5 Revision
RHR Suppression Pool Cooling B 3.6.2.3 BASES (continued)
SURVEILLANCE SR 3.6.2.3.1 (continued)
REQUIREMENTS event requiring initiation of the system is low, and the system is a manually initiated system. This Frequency has been shown to be acceptable based on operating experience.
SR 3.6.2.3.2 Verifying that each required RHR pump develops a flow rate
> 7700 gpm while operating in the suppression pool cooling mode with flow through the associated heat exchanger ensures that pump performance has not degraded during the cycle. Flow is a normal test of centrifugal pump performance required by ASME Operation and Maintenance Nuclear Power Plants Code, Sec-tien -X!((ASMEOM Code Ref. 5). This test confirms one point on the pump performance curve, and the results are indicative of overall performance. Such inservice tests confirm component OPERABILITY, trend performance, and detect incipient failures by indicating abnormal performance.
The Frequency of this SR is in accordance with the Inservice Testing Program.
REFERENCES 1. UFSAR, Section 14.6.1.3.3.
- 2. GE-NE-T23-00737-01, James A. FitzPatrick Nuclear Power Plant Higher RHR Service Water Temperature Analysis, August 1996.
- 3. NEDC-24361-P, James. A FitzPatrick Nuclear Power Plant Suppression Pool Temperature Response, August 1981.
- 4. 10 CFR 50.36(c)(2)(ii).
- 5. ASME Operation and Maintenance Nuclear Power Plants Code, 2001 Edition through 2003 Addenda.ASME, Boiler and Pressure Vessel Code, Section Xl.
JAFNPP B 3.6.2.3-4 Revision