|
---|
Category:Letter type:JAFP
MONTHYEARJAFP-24-0055, Response to Request for Additional Information for License Amendment Request to Add Temporary Change to TS 3.3.2.1, Condition C, Control Rod Block Instrumentation2024-10-29029 October 2024 Response to Request for Additional Information for License Amendment Request to Add Temporary Change to TS 3.3.2.1, Condition C, Control Rod Block Instrumentation JAFP-24-0051, Reply to Preliminary White Finding and Apparent Violation in NRC Inspection Report 05000333/2024011; EA-24-0882024-10-0303 October 2024 Reply to Preliminary White Finding and Apparent Violation in NRC Inspection Report 05000333/2024011; EA-24-088 JAFP-24-0046, Request for Enforcement Discretion for Technical Specification (TS) 3.3.2.1 Control Rod Block Instrumentation2024-09-25025 September 2024 Request for Enforcement Discretion for Technical Specification (TS) 3.3.2.1 Control Rod Block Instrumentation JAFP-24-0047, License Amendment Request – Temporary Addition to TS 3.3.2.1 Condition C, Control Rod Block Instrumentation to Support Upgrade to Rod Worth Minimizer Software2024-09-25025 September 2024 License Amendment Request – Temporary Addition to TS 3.3.2.1 Condition C, Control Rod Block Instrumentation to Support Upgrade to Rod Worth Minimizer Software JAFP-24-0045, Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2024-09-20020 September 2024 Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications JAFP-24-0044, Core Operating Limits Report Cycle 272024-09-16016 September 2024 Core Operating Limits Report Cycle 27 JAFP-24-0043, Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues2024-09-12012 September 2024 Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues JAFP-24-0034, 10 CFR 50.46 Annual Report2024-07-31031 July 2024 10 CFR 50.46 Annual Report JAFP-24-0036, Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-07-29029 July 2024 Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-24-0033, Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test2024-07-23023 July 2024 Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test JAFP-24-0027, EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket2024-06-24024 June 2024 EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket JAFP-24-0026, Supplement to License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (Srvs) Setpoint Lower Tolerance2024-06-12012 June 2024 Supplement to License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (Srvs) Setpoint Lower Tolerance JAFP-24-0023, 2023 Annual Radiological Environmental Operating Report2024-05-0909 May 2024 2023 Annual Radiological Environmental Operating Report JAFP-24-0020, 2023 Annual Radioactive Effluent Release Report2024-04-25025 April 2024 2023 Annual Radioactive Effluent Release Report JAFP-24-0019, 2023 REIRS Transmittal of NRC Form 52024-04-18018 April 2024 2023 REIRS Transmittal of NRC Form 5 JAFP-24-0014, Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-03-25025 March 2024 Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-24-0010, Response to Request for Additional Information for License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance2024-02-29029 February 2024 Response to Request for Additional Information for License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance JAFP-24-0009, Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-02-28028 February 2024 Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0065, License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2023-12-14014 December 2023 License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications JAFP-23-0069, Supplemental Response to Part 73 Exemption Request – Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request – Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements JAFP-23-0057, And Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 And Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation JAFP-23-0064, Emergency Plan Document Revision2023-11-15015 November 2023 Emergency Plan Document Revision JAFP-23-0063, Registration of Spent Fuel Cask Use2023-11-13013 November 2023 Registration of Spent Fuel Cask Use JAFP-23-0059, Registration of Spent Fuel Cask Use2023-10-24024 October 2023 Registration of Spent Fuel Cask Use JAFP-23-0050, Physical Security Plan, Revision 242023-08-31031 August 2023 Physical Security Plan, Revision 24 JAFP-23-0048, Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-31031 August 2023 Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0047, Correction to the 2022 Annual Radioactive Effluent Release Report2023-08-30030 August 2023 Correction to the 2022 Annual Radioactive Effluent Release Report JAFP-23-0040, License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-0303 August 2023 License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0043, 10 CFR 50.46 Annual Report2023-07-31031 July 2023 10 CFR 50.46 Annual Report JAFP-23-0038, License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance2023-07-28028 July 2023 License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance JAFP-23-0033, License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation2023-06-28028 June 2023 License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation JAFP-23-0025, 2022 Annual Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Annual Radiological Environmental Operating Report JAFP-23-0023, 2022 Annual Radioactive Effluent Release Report2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report JAFP-23-0010, 2022 REIRS Transmittal of NRC Form 52023-03-20020 March 2023 2022 REIRS Transmittal of NRC Form 5 JAFP-23-0008, Supplement to Inservice Inspection Summary Report Cycle 252023-02-22022 February 2023 Supplement to Inservice Inspection Summary Report Cycle 25 JAFP-22-0053, Inservice Inspection Summary Report Cycle 252022-12-20020 December 2022 Inservice Inspection Summary Report Cycle 25 JAFP-22-0046, Core Operating Limits Report Cycle 262022-10-17017 October 2022 Core Operating Limits Report Cycle 26 JAFP-22-0040, 10 CFR 50.46 Annual Report2022-07-29029 July 2022 10 CFR 50.46 Annual Report JAFP-22-0033, Core Operating Limits Report Mid-Cycle 252022-06-23023 June 2022 Core Operating Limits Report Mid-Cycle 25 JAFP-22-0032, Response to Request for Additional Information for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b..2022-06-16016 June 2022 Response to Request for Additional Information for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b.. JAFP-22-0030, Oswego County and New York State Participation in the Emergency Plan2022-05-13013 May 2022 Oswego County and New York State Participation in the Emergency Plan JAFP-22-0029, 2021 Annual Radiological Environmental Operating Report2022-05-11011 May 2022 2021 Annual Radiological Environmental Operating Report JAFP-22-0028, 2021 Annual Radioactive Effluent Release Report2022-04-27027 April 2022 2021 Annual Radioactive Effluent Release Report JAFP-22-0026, 2021 REIRS Transmittal of NRC Form 52022-04-0707 April 2022 2021 REIRS Transmittal of NRC Form 5 JAFP-22-2020, Supplemental Information No. 1 for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. and 10CFR 50.69, Risk-Info2022-03-0404 March 2022 Supplemental Information No. 1 for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. and 10CFR 50.69, Risk-Informed JAFP-22-0017, Amendments to Indemnity Agreements2022-02-15015 February 2022 Amendments to Indemnity Agreements JAFP-22-0007, Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102022-01-31031 January 2022 Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 JAFP-22-0010, Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments2022-01-24024 January 2022 Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments JAFP-22-0008, Response to Request for Supplemental Information by the Office of Nuclear Reactor Regulation to Support Review of a License Amendment Request to Eliminate Selected Response Time Testing for Reactor Protection System and Primary2022-01-14014 January 2022 Response to Request for Supplemental Information by the Office of Nuclear Reactor Regulation to Support Review of a License Amendment Request to Eliminate Selected Response Time Testing for Reactor Protection System and Primary JAFP-21-0093, Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation2021-10-18018 October 2021 Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation 2024-09-25
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARJAFP-24-0047, License Amendment Request – Temporary Addition to TS 3.3.2.1 Condition C, Control Rod Block Instrumentation to Support Upgrade to Rod Worth Minimizer Software2024-09-25025 September 2024 License Amendment Request – Temporary Addition to TS 3.3.2.1 Condition C, Control Rod Block Instrumentation to Support Upgrade to Rod Worth Minimizer Software JAFP-24-0045, Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2024-09-20020 September 2024 Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications JAFP-24-0036, Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-07-29029 July 2024 Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis ML24190A1932024-07-0909 July 2024 Correction Letter of Amendment No. 355 Revise Technical Specifications Section 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition JAFP-23-0065, License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2023-12-14014 December 2023 License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications JAFP-23-0048, Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-31031 August 2023 Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0040, License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-0303 August 2023 License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0038, License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance2023-07-28028 July 2023 License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance JAFP-23-0033, License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation2023-06-28028 June 2023 License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21277A1932021-11-16016 November 2021 Enclosure 2, Draft Conforming License Amendments ML21181A0572021-11-0404 November 2021 Issuance of Amendment No. 344 Adoption of TSTF-545 JAFP-21-0093, Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation2021-10-18018 October 2021 Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position JAFP-21-0069, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2021-07-30030 July 2021 Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors JAFP-21-0053, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-14014 June 2021 Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0051, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-13013 June 2021 Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0050, Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-12012 June 2021 Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement ML21144A1072021-05-17017 May 2021 Acceptance of Requested Licensing Action License Amendment Request to Adopt TSTF-582 JAFP-21-0041, Supplement to Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2021-05-17017 May 2021 Supplement to Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing JAFP-21-0040, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2021-05-14014 May 2021 Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments ML21057A2732021-02-25025 February 2021 Application for Order Approving License Transfers and Proposed Conforming License Amendments JAFP-20-0083, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule2020-12-11011 December 2020 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing JAFP-20-0080, Application to Revise Surveillance Requirement (SR) 3.5.1.62020-12-11011 December 2020 Application to Revise Surveillance Requirement (SR) 3.5.1.6 JAFP-20-0047, License Amendment Request: Application to Modify Technical Specifications 3.6.1.3, Primary Containment Isolation Valves2020-06-30030 June 2020 License Amendment Request: Application to Modify Technical Specifications 3.6.1.3, Primary Containment Isolation Valves JAFP-20-0046, License Amendment Request for Adoption of TSTF-478-A, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control, Using the Consolidated Line Item.2020-06-30030 June 2020 License Amendment Request for Adoption of TSTF-478-A, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control, Using the Consolidated Line Item. RS-20-025, Supplement to Exelon Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2020-02-24024 February 2020 Supplement to Exelon Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls JAFP-20-0012, License Amendment Request - Application to Adopt Technical Specification Task Force Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, Using the Consolidated Line...2020-01-23023 January 2020 License Amendment Request - Application to Adopt Technical Specification Task Force Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, Using the Consolidated Line... ML19295G7832019-12-19019 December 2019 Issuance of Amendment No. 331 Regarding Change to Technical Specifications to Remove Ultimate Heat Sink Bar Rack Heaters ML19277G0852019-10-0404 October 2019 Emergency License Amendment Request: One Time Extension to the TS 3.8.1 Action A.3 Completion Time for an Inoperable Offsite Source ML19277D5522019-10-0404 October 2019 Draft James A. FitzPatrick Nuclear Power Plant - Emergency License Amendment Request - One Time Extension to the TS 3.8.1 Action A.3 Completion Time for an Inoperable Offsite Source ML19276G3132019-10-0202 October 2019 Draft Exigent License Amendment Request - One Time Extension to the TS 3.8.1 Action A.3 Completion Time for an Inoperable Offsite Source JAFP-19-0092, Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers2019-09-26026 September 2019 Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers JAFP-19-0089, License Amendment Request - Proposed Changes to the Technical Specifications Related to Primary Containment Hydrodynamic Loads2019-09-12012 September 2019 License Amendment Request - Proposed Changes to the Technical Specifications Related to Primary Containment Hydrodynamic Loads JAFP-19-0083, License Amendment Request - Proposed Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation2019-09-0505 September 2019 License Amendment Request - Proposed Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation RS-19-044, License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions2019-08-28028 August 2019 License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions ML19157A2032019-07-11011 July 2019 Issuance of Amendment No. 325 Reactivity Anomalies Surveillance JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-19-040, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-06-25025 June 2019 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program RS-19-038, Supplement to the Application to Adopt TSTF-564, Safety Limit MCPR2019-03-0707 March 2019 Supplement to the Application to Adopt TSTF-564, Safety Limit MCPR JAFP-19-0033, License Amendment Request - Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Revision 02019-03-0707 March 2019 License Amendment Request - Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Revision 0 RS-19-003, Application to Adopt TSTF-564, Safety Limit Mcpr.2019-02-0101 February 2019 Application to Adopt TSTF-564, Safety Limit Mcpr. JAFP-18-0106, License Amendment Request: Proposed Change to the Technical Specifications to Remove Ultimate Heat Sink Bar Rack Heaters from Technical Specifications2018-11-29029 November 2018 License Amendment Request: Proposed Change to the Technical Specifications to Remove Ultimate Heat Sink Bar Rack Heaters from Technical Specifications RS-18-130, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO2018-11-0101 November 2018 Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO JAFP-18-0093, License Amendment Request - Reactivity Anomalies Surveillance2018-10-0202 October 2018 License Amendment Request - Reactivity Anomalies Surveillance ML18292A5282018-09-25025 September 2018 Technical Evaluation Input for License Amendment Request to Remove Requirements for Deicing Heaters from Technical Specification 3.7.2 RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement2018-06-15015 June 2018 Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement 2024-09-25
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARJAFP-23-0014, Enclosure 1 - FSAR 2023 Redacted Version2023-08-10010 August 2023 Enclosure 1 - FSAR 2023 Redacted Version ML23095A3722023-04-0505 April 2023 2023 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal ML21095A3272021-04-0505 April 2021 2021 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal JAFP-19-0043, Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal2019-04-10010 April 2019 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal ML17104A0122017-04-10010 April 2017 Submittal of 2017 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes JAFP-17-0030, Submittal of 2017 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes2017-04-10010 April 2017 Submittal of 2017 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes JAFP-15-0047, 2015 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal2015-04-0808 April 2015 2015 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal JAFP-06-0016, Proposed License Amendment: Changes to the Reactor Vessel Material Surveillance Program2006-01-26026 January 2006 Proposed License Amendment: Changes to the Reactor Vessel Material Surveillance Program 2023-08-10
[Table view] |
Text
Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
James A. Fitzpatrick NPP 1 hEntergy RO. Box 110 Lycoming, NY 13093 Tel 315 349 6024 Fax 315 349 6480 T.A. Sullivan Site Vice President - JAF January 26, 2006 JAFP-06-0016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001
SUBJECT:
Entergy Nuclear Operations, Inc.
James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 License No. DPR-59 Proposed License Amendment: Changes to the Reactor Vessel Material Surveillance Program
REFERENCES:
- 1. NRC letter from W. H. Bateman to C. Terry (BWRVIP Chairman),
NRC Staff Review of BWRVIP-86-A, "BWR Vessel Internal Project, Updated BWR Integrated Surveillance Program (ISP)
Implementation Plan," dated December 16, 2002.
- 2. Regulatory Issue Summary No. 2002-05, "NRC Approval of Boiling Water Reactor Pressure Vessel Integrated Surveillance Program," dated April 8, 2002.
Dear Sir:
Pursuant to 10 CFR 50.90, Entergy Nuclear Operations, Inc. (ENO) hereby proposes to amend the James A. FitzPatrick Nuclear Power Plant (JAFNPP) Operating License, DPR-59.
The proposed license amendment replaces the existing Reactor Vessel Material Surveillance Program with the Boiling Water Reactor Vessel and Internals Project (BWRVIP) Integrated Surveillance Program (ISP), as approved by the NRC (References 1 and 2). This proposed amendment meets ENO's commitment to describe JAFNPP's participation in the BWRVIP ISP and Supplemental Surveillance Program (SSP).
The enclosure and attachments provide ENO's evaluation of the proposed change, and provide Updated FSAR and TS Bases pages.
ENO has reviewed the proposed amendment in accordance with 10 CFR 50.92 and concludes that this amendment does not involve a significant hazards consideration.
Once approved, the amendment will be implemented within 60 days.
In accordance with 10 CFR 50.91, a copy of this application, with the associated enclosure and attachments, is being provided to the designated New York State official.
If you have any questions or require additional information, please contact Mr. Jim Costedio at (315) 349-6358.
AM
I declare under penalty of perjury that the foregoing is true and correct.
Executed on the Z7- 'day of January, 2006.
Sincerely, Site Vice President TAS:RP:dmr
Enclosure:
Evaluation of Proposed License Amendment (4 pages) : Proposed JAFNPP Updated FSAR Change (1 page) : List of Regulatory Commitments (1 page) : Proposed Markup of TS Bases Pages (2 pages) cc:
Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Resident Inspector's Office U.S. Nuclear Regulatory Commission James A. FitzPatrick Nuclear Power Plant P.O. Box 136 Lycoming, NY 13093 Mr. John P. Boska, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop: O-8-C2 Washington, DC 20555 Mr. Paul Eddy New York State Department of Public Service 3 Empire State Plaza Albany, NY 12223-1350 Mr. Peter R. Smith, President New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399
ENCLOSURE EVALUATION OF PROPOSED LICENSE AMENDMENT
Subject:
Proposed Chanaes to the Reactor Vessel Material Surveillance Program.
- 1. DESCRIPTION
- 2. PROPOSED CHANGE
- 3. BACKGROUND
- 4. TECHNICAL ANALYSIS
- 5. REGULATORY SAFETY ANALYSIS 5.1 No Significant Hazards Consideration
- 6. ENVIRONMENTAL CONSIDERATION
- 7. REFERENCES
- 1. Description Entergy proposes to revise the licensing basis for the James A. FitzPatrick Nuclear Power Plant (JAFNPP) by replacing the current plant-specific reactor pressure vessel (RPV) material surveillance program with the Boiling Water Reactor (BWR) Integrated Surveillance Program (ISP), which was approved by the NRC in its Safety Evaluation (SE) dated February 1, 2002 (Reference 1).
- 2. Proposed Change
- Licensing Basis Change: A new section 4.2.7, describing the Reactor Vessel Materials Surveillance Program (Attachment 1), will be inserted into JAFNPP's Updated Final Safety Analysis Report (UFSAR). This section will provide a description of JAFNPP's participation in the BWR Vessel and Internals Project (BWRVIP) Integrated Surveillance Program for compliance with 10 CFR 50, Appendices G and H, replacing the program previously specified in section 4.2.7.
Attachment 3 provides a markup of the update to the TS Bases.
Attachment 2 provides commitments made in this submittal. The proposed change to the UFSAR and TS Bases will be implemented following NRC approval of this request.
The TS Bases pages are provided for information only and will be controlled and updated in accordance with TS 5.5.11, 'Technical Specifications (TS) Bases Control Program."
- 3. Background Appendix H of 10 CFR 50, uReactor Vessel Material Surveillance Program Requirements," requires a surveillance program to monitor a reactor pressure vessel beltline region that complies with American Society for Testing & Materials (ASTM) E-185, except as modified by Appendix H. ASTM E-185 provides guidelines for designing a surveillance program, selecting materials, evaluating test results, and recommendations for the minimum number of surveillance capsules and their withdrawal schedules. 10 CFR 50, Appendix H requires that the proposed withdrawal schedule be submitted with a technical justification and approved prior to implementation.
The existing JAFNPP reactor vessel material surveillance program withdrawal schedule was determined using the guidance of ASTM E-185-82 which is incorporated by reference in 10 CFR 50 Appendix H Paragraph III.B.
Over the last several years, BWRVIP developed an ISP to replace the individual plant programs and submitted it for NRC approval. The NRC staff completed its review of the BWRVIP ISP (References 1 and 2) and found it acceptable for BWR licensee implementation provided that all licensees use one or more neutron fluence methodologies acceptable to the NRC staff to determine surveillance capsule and RPV neutron fluences. The staff also required licensees who elect to participate in the ISP to submit a license amendment to the NRC confirming their incorporation of the ISP into the licensing basis for each BWR facility.
JAFNPP is participating in the BWRVIP Integrated Surveillance/Supplemental Surveillance programs. These programs will provide fracture toughness data to support adjustments to the Pressure-Temperature (P-T) curves for vessel heat-up and cool-down applications. JAFNPP intends to perform new neutron transport calculations using R.G. 1.190 approved methodology.
Paige 1 of 4
- 4. Technical Analysis 4.1 Regulatory Requirement 10 CFR 50, Appendix H, 'Reactor Vessel Material Surveillance Program Requirements," requires Entergy to monitor changes to the fracture toughness properties of ferritic materials in the JAFNPP reactor vessel beltline region which result from exposure of these materials to neutron irradiation and the thermal environment. Under the program, fracture toughness test data will be obtained from material specimens exposed in surveillance capsules, which will be withdrawn periodically from the reactor vessel.
4.2 BWRVIP ISP/SSP and JAFNPP Reactor Vessel Material Program JAFNPP had three surveillance capsules located circumferentially along the reactor vessel inside radius and axially at the reactor vessel core mid-plane. The first capsule was withdrawn at 5.98 Effective Full Power Years (EFPY) of operation (References 5 and 6). This first capsule was reconstituted as a supplemental capsule and subsequently re-inserted in the reactor vessel during the next refueling outage (Reference 7). The second capsule was withdrawn at 13.4 EFPY of operation (References 8 and 9) and subsequently analyzed for both fluence and fracture toughness. The data was used to determine adjustments to the reactor vessel P-T limits.
JAFNPP is a participant in the BWRVIP ISP/SSP program. BWRVIP ISP/SSP is an alternative to individual plant-specific RPV surveillance program within the scope of paragraph III.C of Appendix H of 10 CFR 50. The NRC has approved BWRVIP ISP/SSP (References 1 and 2) for plant-specific use. Under the NRC approved program, the two remaining JAFNPP capsules in the JAFNPP vessel are deferred and representative specimens from host plants are selected to provide the required data for compliance with Appendix G and H requirements.
The JAFNPP representative samples and withdrawal schedules are described in BWRVIP-86-A, 'BWR Vessel and Internals Project, Updated BWR Integrated Surveillance Program (ISP) Implementation Plan," (Reference 4). JAFNPP will continue to participate in the BWRVIP ISP/SSP program to demonstrate fracture toughness requirements and P-T limits to comply with Appendices G and H of 10 CFR 50. JAFNPP will provide fluence calculations and P-T curves based upon the NRC approved methodology prescribed in R.G. 1.190, R.G. 1.99, Rev. 2, and fracture toughness data obtained from the BWRVIP ISP/SSP.
Based on the Entergy participation in the NRC approved BWRVIP ISP/SSP for compliance with Appendices G and H of 10 CFR 50, JAFNPP will be revising the licensing basis describing the BWRVIP ISP/SSP in the UFSAR.
Page 2of4
- 5. Regulatory Safety Analysis 5.1 No Significant Hazards Consideration The proposed license amendment revises JAFNPP's licensing basis incorporating the NRC approved BWRVIP ISP into the Updated Final Safety Analysis Report (UFSAR) to comply with Appendix H of 10 CFR 50.
Entergy has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR50.92,
'Issuance of Amendment," as discussed below:
- 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No.
The proposed change to the licensing basis continues to assure that applicable regulatory requirements are met and the same assurance of reactor pressure vessel integrity continues to be provided. The proposed change to the License and licensing basis follow the NRC Safety Evaluation approving the implementation of the ISP. The proposed change ensures that the reactor pressure vessel will continue to be operated within the design, operational, and testing limits.
The proposed change does not modify the reactor coolant pressure boundary, (i.e., there are no changes in operating pressure, materials, or seismic loading).
The proposed change does not adversely affect the integrity of the reactor coolant pressure boundary such that its function in the control of radiological consequences is affected.
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No The proposed change does not involve a modification to the design of plant structures, systems, or components. Thus, no new modes of operation are introduced by the proposed change. The proposed change will not create any failure mode not bounded by previously evaluated accidents. Therefore, the proposed change does not create the possibility of a new or different kind of accident from any previously evaluated.
- 3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No.
The proposed implementation of ISP has been previously approved by the NRC and found to provide an acceptable alternative to plant-specific reactor vessel material surveillance programs. Operation of JAFNPP within the program ensures that the reactor vessel materials will continue to behave in a non-brittle manner, thereby preserving the original safety design bases. Therefore, the proposed change does not involve a significant reduction in a margin of safety.
Based on the above, Entergy concludes that the proposed amendment presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.
Page 3 of 4
Based on the considerations discussed above, Entergy concludes that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
6.0 Environmental Consideration The amendment changes a requirement with respect to use of a facility component located within the restricted area as defined in 10 CFR Part 20. JAFNPP has determined that the amendment involves no significant increases in the amounts, and no significant change in the types, of any effluents that may be released offsite, and there is no significant increase in individual or cumulative occupational radiation exposure. JAFNPP also finds that the proposed amendment involves no significant hazards consideration.
Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Hence, pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
7.0 References
- 1. W. H. Bateman (USNRC) to C. Terry, Safety Evaluation Regarding EPRI Proprietary Reports "BWR Vessel and Internals Project, BWR Integrated Surveillance Program Plan (BWRVIP-78)" and 'BWRVIP-86: BWR Vessel and Internals Project, BWR Integrated Surveillance Program Implementation Plan," dated February 1, 2002.
- 2. NRC letter from W. H. Bateman to C. Terry (BWRVIP Chairman), NRC Staff Review of BWRVIP-86-A, "BWR Vessel Internal Project, Updated BWR Integrated Surveillance Program (ISP) Implementation Plan," dated December 16, 2002.
- 3. Regulatory Issue Summary No. 2002-05, 'NRC Approval of Boiling Water Reactor Pressure Vessel Integrated Surveillance Program," dated April 8, 2002.
- 4. BWRVIP-86-A, 'BWR Vessel and Internals Project, Updated BWR Integrated Surveillance Program (ISP) Implementation Plan," Final Report, dated October 2002.
- 5. NYPA letter, JPN-86-22, from J.C. Brons to NRC, "Reactor Vessel Surveillance Materials Program Summary Report and Implementation Schedule," dated April 30, 1986.
- 6. GE Report MDE-49-0386, DRF-B1 1-00339, Class I, 'JAFNPP Reactor Vessel Surveillance Materials Testing and Fracture Toughness Analysis," dated April 1986.
- 7. GE Report SASR 87-58, DRF B1 1-00339, Preparation of Surveillance Capsule Holder with Reconstituted Irradiated Materials for the JAFNPP," dated October 1987.
- 8. NYPA letter, JPN-97-035, from R.J. Deasy to NRC, "Reactor Vessel Surveillance Materials Program Summary Report and Implementation Schedule," dated November 10, 1997.
- 9. GE Report GE-NE-B1100732-1, Revision 1, Class II, "Plant Fitzpatrick RPV Surveillance Materials Testing and Analysis of 120 degree capsule at 13.4 EFPY,"
dated February 1998.
Page 4 of 4
ATTACHMENT 1 PROPOSED JAFNPP UPDATED FSAR CHANGE (One page)
JAF FSAR UPDATE The reactor vessel and Reactor Coolant System were hydrostatically tested in accordance with code requirements at 125 percent design pressure. Vessel temperature is maintained at a minimum of the temperature shown in Figure 16.5-1. In accordance with the ISI program, hydrostatic or leakage testing follows each removal and replacement of the reactor vessel head.
Other preoperational tests included the calibration and testing of reactor vessel flange, seal ring leakage detection and instrumentation, the adjustment of reactor vessel stabilizers, a check of all vessel thermocouples, and an operational check of the vessel flange stud tensioner.
4.2.7 Inspection and Testing Accessibility for inservice inspection was considered during the design of the reactor vessel and insulation to ensure adequate working space and access for inspection. The selection of the components and locations to be inspected meet the intent of the ASME Boiler and Pressure Vessel Code, Section Xl, "Inservice Inspection of Nuclear Reactor Coolant Systems", dated January 1, 1970. The details of the Inservice Inspection Program for JAF plant are specified in Section 16.4.
0 IC
- ,aiA, TheAmaterial surveillance test program for the reactor vessel provides for the preparation of a series of Charpy V-Notch impact specimens and tensile specimens from the base metal of the reactor vessel, weld heat affected zone metal, and weld metal from a reactor steel joint which simulates a welded joint in the reactor vessel. The specimens (two capsules with 12 impact specimens each) and neutron monitor wires (iron, nickel and copper) were placed near core mid-height, adjacent to the reactor vessel wall where neutron exposure is similar to that of the vessel wall. The specimens were installed at startup or just prior to full-power operation. Selected groups of specimens are removed at intervals over the lifetime of the reactor and tested to compare mechanical properties with the properties of control specimens which are not irradiated.
Thg-material surveillance test program is =;Abtly-based on 10 CFR 50 Appendix H. The-
,chodulo for withdravwal of capsules is determined using the guidance ef ASTM E 185 82 which is incorporated by refcecnee in 10 cFI1 50 Appendix II Paragraph lIl.D. The first capsule was removed at 5.98 effective full power years (EFPY) of operation and the second capsule was removed at 13.4 EFPY of operation. ThA next surycillnee capsule will be removed aftr approximately 30 EFPY of operation based upon expected neutron fluRnce of the capsule. The NRG staff 'crified that this: dt illancc cazule withdlraal catifofs isfo the ASTl sahod M E418 70 standard, and that the withdrawal of the third sur'eillance capsule will also be in accordance with ASTM E48 82. CI-TN sf id)
No weak direction specimens were included in the reactor vessel material surveillance program.
All Charpy V-Notch specimens were taken parallel to the direction of rolling. The majority of development work on radiation effects has been with longitudinal specimens. This is considered the best specimen to be used for determination of changes in transition temperature.
At the low neutron fluence levels of plants no change in transverse shelf level is expected and transition temperature changes are minimal.
NRC Regulatory Guide 1.99, "Radiation Embrittlement of Reactor Vessel Materials", Revision 2, May 1988, provides the basis for the reactor vessel material surveillance analysis which accounts for irradiation embrittlement effects in the reactor vessel core region, or beltline. The best estimate fluence for the peak locations in the lower shell and the lower intermediate shell after 32 effective full power years (EFPY) or 40 years of power operation at 80% capacity factor are expected to be 1.61 X 1018 n/cm 2 and 1.81 X 1018 n/cm2 respectively at the vessel ID.
4.2-11 Rev. 1 5/01
INSERT 1 An Integrated Surveillance Program (ISP) has been established by the BWRVIP to replace individual plant vessel surveillance programs as documented in BWRVIP-86-A, "BWR Vessel and Internals Project, Updated BWR Integrated Surveillance Program (ISP) Implementation Plan," Final Report, October 2002. The ISP matches the vessel chemistry of an individual plant to a representative plant and the capsule results, (i.e.,
changes in fracture toughness with neutron exposure, from the representative plant will be applied at the individual plant). The NRC approved the BWRVIP program in an SER, dated February 1, 2002, and determined the approved ISP adequately addresses the requirements of 10 CFR 50, Appendix H. A condition of the NRC SER requires that individual plant vessel fluence calculations be performed using methods in accordance with the recommendations of Regulatory Guide 1.190. The capsule withdrawal schedule at the representative plant is controlled by the BWRVIP. JAF is a member of the BWRVIP and will replace its individual plant surveillance program with the ISP. The balance of the JAF specimen capsules will remain in place to serve as backup for the BWRVIP program, or as otherwise needed.
ATTACHMENT 2 LIST OF REGULATORY COMMITMENTS The following table identifies those actions committed to by JAF in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments. Please direct questions regarding these commitments to Mr. Jim Costedio at (315) 349-6358.
REGULATORY COMMITMENTS DUE DATE Revise JAFNPP UFSAR and TS Bases, 60 days of issue describing BWRVIP ISP/SSP program
ATTACHMENT 3 PROPOSED MARKUP OF TS BASES PAGES (Two pages)
RCS P/T Limits Ho , B 3.4.9 BASES --~-'-~~~~-- ~
BACKGROUND with ASTM E 185 (Ref. 3) and Appendix H of 10 CFR 50 (continued) (Ref. 4). The operating P/T limit curves are adjusted, as necessary, based on the evaluation findings and the recommendations of Reference 5.
The P/T limit curves are composite curves established by superimposing limits derived from stress analyses of those portions of the reactor vessel and head that are the most restrictive. At any specific pressure, temperature, and temperature rate of change, one location within the reactor vessel will dictate the most restrictive limit. Across the span of the P/T limit curves, different locations are more restrictive, and, thus, the curves are composites of the most restrictive locations.
The heatup curve represents a different set of restrictions than the cooldown curve because the directions of the thermal gradients through the vessel wall are reversed. The thermal gradient reversal alters the location of the tensile stress between the outer and inner walls. However, the P/T limit curves reflect the most restrictive of the heatup and cooldown curves.
The P/T criticality limits include the Reference 1 requirement that they be at least 40'F above the heatup curve or the cooldown curve and not lower than the minimum permissible temperature for the inservice leakage and hydrostatic testing.
The consequence of violating the LCO limits is that the RCS has been operated under conditions that can result in brittle failure of the RCPB, possibly leading to a nonisolable leak or loss of coolant accident. In the event these limits are exceeded, an evaluation must be performed to determine the effect on the structural integrity of the RCPB components. ASME Code,Section XI, AppendixE (Ref. 6), provides a recommended methodology for evaluating an operating event that causes an excursion outside the limits.
APPLICABLE The P/T limits are not derived from Design Basis Accident SAFETY ANALYSES (DBA) analyses. They are prescribed during normal operation to avoid encountering pressure, temperature, and temperature rate of change conditions that might cause undetected flaws to propagate and cause nonductile failure of the RCPB, a condition that is unanalyzed. Reference 7 establishes the methodology for determining the P/T limits. Reference 8 (continued)
JAFNPP B 3.4.9-2 Revision W
RCS P/T Limits B 3.4.9 BASES REFERENCES 7. GE-NE-B1100732-01, Revision 1, Plant FitzPatrick RPV (continued) Surveillance Materials Testing and Analysis of 1200 Capsule at 13.4 EFPY, February 1998, including Errata and Addenda Sheets dated June 17, 1999 and December 3, 1999.
- 8. Letter from Guy Vissing (NRC) to James Knubel (NYPA)
Issuance of Amendment No. 258 to James A. FitzPatrick Nuclear Power Plant, November 29, 1999.
- 9. 10 CFR 50.36(c)(2)(ii).
- 10. UFSAR, Section 14.5.7.2.
- 11. GE-NE-208-04-1292, Evaluation of Idle Recirculation Loop Restart Without Vessel Bottom Temperature Indication for FitzPatrick Nuclear Power Plant, December 1992.
- 12. JAF-RPT-RWR-02076, Verification of Alternative Operating Conditions for Idle Recirculation Loop Restart Without Vessel Bottom Temperature Indication, June 25, 1995.
tA.S P JAFNPP B 3.4.9-10 Revision X