February 2004 Monthly Operating Report for James a FitzPatrick
ML040780357
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/10/2004
From: Ted Sullivan
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
JAFP-04-0035
Download: ML040780357 (3)


Text

Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

James A. Fitzpatrick NPP Entergy P.O. Box 110 Lycoming, NY 13093 Tel 315 349 6024 Fax 315 349 6480 T.A. Sullivan March 10, 2004 Site Vice President - JAF JAFP-04-0035 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station O-Pl-17 Washington, DC 20555

SUBJECT:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 February 2004 Monthly Operating Report

Dear Sir:

Enclosed is the Monthly Operating Report (MOR) for the James A. FitzPatrick Nuclear Power Plant for the month of February 2004.

MOR data has been prepared and formatted using the INPO Consolidated Data Entry (CDE) submittal process.

Should you have any questions concerning this report, please direct them to Mr. Mick Baker, Thermal Performance Engineer, at (315) 349-6181.

Very truly yours, TAS:MB:dr Enclosure 7:S7 6 A.

cc: Regional Administrator U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Resident Inspector James A. FitzPatrick Nuclear Power Plant U.S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 Mr. Guy Vissing, Project Manager

-Project Directorate I Division of Licensing Project Management U.S. Nuclear Regulatory Commission Mail stop OWFN 8C2 Washington, DC 20555 Mr. R. Toole ENN BWR SRC Operations Subcommittee Chairman 605 West Homer Street Ebensburg, PA 15931 Mr. Paul Eddy Public Service Commission Office of Electricity and the Environment 3 Empire Plaza Albany, NY 12223 JENG JAFP Files RMS (JAF)

OPERATING DATA REPORT DOCKET NO. 50-333 UNIT NAME 1 itzPatc B 1ake DATE I Ma-rchrr M420 COMPLETED BY I a FBfak e-r TELEPHONE I 731) 34TZW8 REPORTING PERIOD: February 2004

1. Design Electrical Rating 816.00
2. Maximum Dependable Capacity (MWe-Net) 813.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 696.00 1,440.00 191,344.50
4. Number of Hours Generator On-line 648.67 1,392.67 185,963.87
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 511,118.00 1,137,738.00 139.043,502.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action S: Scheduled (Hours) Down 2 Comments 2004-01 02/16/2004 F 47.33 B 5

SUMMARY

Commenced downpower to remove circulating water pumps from service in order to combat lowering screenwell intake water levels caused by environmental conditions (frazil ice formation on intake bar racks). While at reduced power, the "A' reactor feed pump seal failed. The main turbine was taken offline to remove steam from the system and allow pump seal replacement The main turbine was put back on line when seal repairs were complete, and power ascension commenced. The reactor remained critical throughout the evolution.

I 2 Reason: Method:

A Equipment Failure (Explain) I Manual B -Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Page 1 of 1