IR 07200001/2023401

From kanterella
Jump to navigation Jump to search
GE Hitachi Morris (Gehmo) Independent Spent Fuel Storage Installation NRC Security Inspection Report 07200001/2023401
ML23328A056
Person / Time
Site: 07200001
Issue date: 11/28/2023
From: Michael Ziolkowski
NRC/RGN-III/DRSS/SEPIR
To: Mcfadden A
GE-Hitachi Nuclear Energy Americas
References
IR 2023401
Download: ML23328A056 (1)


Text

SUBJECT:

GE-HITACHI MORRIS (GEHMO) INDEPENDENT SPENT FUEL STORAGE INSTALLATION - NRC SECURITY INSPECTION REPORT 07200001/2023401

Dear Anthony McFadden:

On November 8, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the GE-Hitachi Morris (GEHMO) Independent Spent Fuel Storage Installation (ISFSI) and discussed the results of this inspection with you and other members of your staff.

The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Michael E. Ziolkowski, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security Docket No. 07200001 License No. SMB-2500

Enclosure:

As stated

Inspection Report

Docket Number:

07200001

License Number:

SMB-2500

Report Number:

07200001/2023401

Enterprise Identifier:

I-2023-401-0088

Licensee:

GE-Hitachi Nuclear Energy

Facility:

GE-Hitachi Morris (GEHMO) - ISFSI

Location:

Morris, IL

Inspection Dates:

November 07, 2023 to November 08, 2023

Inspectors:

G. Bonano, Physical Security Inspector

K. Maloney, Physical Security Inspector

Approved By:

Michael E. Ziolkowski, Chief

Security, Emergency Preparedness, and Incident

Response Branch

Division of Radiological Safety and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an Independent Spent Fuel Storage Installation (ISFSI) security inspection at GE Hitachi Morris (GEHMO), in accordance with the Spent Fuel Storage Oversight Process. The Spent Fuel Storage Oversight Process is the NRCs program for overseeing the safe storage of spent nuclear fuel. Refer to https://www.nrc.gov/waste/spent-fuel-storage/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2690, Inspection Program for Dry Storage of Spent Reactor Fuel at Independent Spent Fuel Storage Installations And for 10 CFR Part 71 Transportation Packaging. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

ISFSI SECURITY

===81311 - Physical Security Requirements for Independent Spent Fuel Storage Installations The inspector evaluated the physical protection program for the Independent Spent Fuel Storage Installation. The following elements were evaluated for this specific licensed ISFSI:

Physical Security Requirements for Independent Spent Fuel Storage Installations===

(1)02.09 (a - z)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On November 8, 2023, the inspectors presented the ISFSI security inspection results to Anthony E. McFadden and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

GEHMO Self-Assessment

2/14/2022

NRC Acknowledgement of Official Reviewer

04/16/2007

and

04/25/2016

LLEA LOA - Grundy County Sheriff's Office

01/16/2023

and

01/12/2022

Approved Unescorted Access to the Basin, Basin Pump

Room, Basin Pump Room Ext, Chiller Room, and Part 37

Material 30 Day Reviews

22-2023

EA-03-097

Issuance of Order for Implementation of Additional Security

Measures Associated with Access Authorization for GE

Morris Operating Plant

08/18/2004

EA-06-298

Issuance of Order Imposing Fingerprinting and Criminal

History Check Requirements for Access to Safeguards

Information for GE Morris Operation ISFSI

2/23/2007

EA-07-124

Issuance of Order Imposing Fingerprinting and Criminal

History Check Requirements for Unescorted Access to GE

Morris Operation

05/29/2007

Miscellaneous

NucPgms-SPO-

21-01

GEH Assessment

2/06-

09/2021

NEDE-32441

Security Policy & Procedures Manual

81311

Procedures

NEDS-14507-D9

PSP for Morris Operation

2/16/2017