0-y U.S. NUCLEAR REGULATORY COMMISSION
,
REGION III
Report No. 72-001/86005(DRSS)
Docket No.72-001 License No. SNM-2500 Safeguards Group I Licensee: General Electric Company 310 De Guigne Drive Sunnyvale,.CA 94086 Facility Name: Morris Operation Inspection At: Morris Operation Site, Morris, Illinois Inspection Conducted: December 15-16, 1986 Inspector: %-@-
O J. R. Knicele9 Date Physical Security Inspector Approved By: 9 4. 6cfe"%
lE N J.' R. Creed, Thief Date Safeguards Section Inspection Summary Inspection on December 15-16, 1986 (Report No. 72-001/86005(DRSS))
Areas Inspected:
Included a review of the Security Plan and Implementing Procedures; Management Effectiveness; Security Organization; Security Program Audit; Records and Reports; Testing and Maintenance, Locks, Keys and Combinations; Physical Barriers - Protected and Vital Areas; Compensatory Measures, Assessment Aids; Access Control - Personnel, Packages and Vehicles; Detection Aids - Protected and Vital Areas; Alarm Stations: Communications and Safeguards Information. The inspection began during the day shift.
Results: The licensee was found to be in compliance with NRC requirements within the areas examined, except for the following item.
Security Organization - The physical ability testing for some security officers was not conducted in accordance with security plan commitments.
kD0hk hg29 Enclosure contatns g8 llpon separation this page is Decontrolled