IR 07100129/2012002
| ML19329F142 | |
| Person / Time | |
|---|---|
| Site: | Midland, 07100129 |
| Issue date: | 01/17/1978 |
| From: | Heishman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Howell S CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| References | |
| NUDOCS 8006200688 | |
| Download: ML19329F142 (3) | |
Text
1 bR.A (
,,
.
Fl A E $
.
...
.
JAN 17
.8 Docket No. 50-329,/ -Il
Duckat No. 50w-330
...,.
Consumers Power Company ATTN: Ifr. Stephen H.11owell Vice President 1945 West Parnall Road Jackson, III 49201 Gentlemen Our letter dated January 10, 1978, transmitted an inspection report referring to the inspection conducted on November 29 - December 2,
,
'
and December 5-8, 1977. The inspection number was in error. Please replace page 2 of the trar.smittal letter and page 1 of your copy of the report wi'.h the enclosed corrected pages.
We regret a4y inconvenience this may have caused.
Sincerely,
- l
R. F. Heistaan, Chief Reactor Construction and
,
P.ngineering Support Branch F.nclosures: Corrected copies cc w/enels:
,
"
Central Files Reproduction I! nit NRC 20b THIS DOCUMENT CONTG}gg
!
PDE P00R QUAUTY PAGES Local PDR l
NSIC TIC-
'
l Rons1d calien, Michigan I
Public Service Consnission
~
'
Dr. Wayne E. North j
Hyron !!. Cherry, Chicago 8006200[ h g
I
.,,, -
RIII-RIIh.
RIII/y/f RIII L M RIII /g
.
_,
Cook /jb.k-NaiN Haye @ 'f Danielson'
He M
%,
1/16/78 U
\\
/
///g/JJ (
m,,,
_
! -
.m
%
. -
-
___
- -
.
- -
. _ _ _ _ _ _ ___ _ _ _
_ - -
/
,
\\
-
2-Consumers Power Company
-
,
We will glad 2y discuss any questions you have concerning this inspection.
Sincerely
.
l
.
R. F. Heishman, Chief Reactor Construction and Engineering Support Branch Enc.losure s IE Inspection keports No. 50-329/77-12 and No. 50-330/77-15
'
cc w/cncl:
Central Files Reproduction Unit NRC 20b i
PDR Local PDR NSIC TIC Ronald Callen,111chigan f'
Public Service Cor.nnission
\\
Dr. Wayne E. North Myron H. Cherry, Chicago
.
.
I t
I
.,..-
!
!
l
<
,
.
i
,
i RIIIh j
-
RIII RIII RIII RIII erm,
,
.,.
wamamagf%
"? * N
". ye:
vaulci m H[hEan
,
~!
g.,,,
1/16/78
'
. - NRC 70RM 310 (p.76) NACM 0240
- u. s. sovamaass=v rasanne orrics. n eve - ese.ea4
_
_ _
_ _
,
_.. _, _ _
, _,.. _ _.. _...,,.. _., _.... _ _... -. _ _, -
.
. _ _
p
.,
-
.
/ -~.
'
'
-U.S. NUCLl%R REGULATORY COMMISSION
'
0FFICE OF T.NSPECTION AND ENFORCEMENT
REGION III
.
Report No. 50-329/77-12; 50.-330/77-15 Docket No. 50-329, 50-330 License No. CPPR-81, CPPR-82
. Licensee:
Coasumers Power Company 1945 West Parnall Road Jackson, MI 49201 Facility name: Midland Nuclear Power Plant, Units 1 and 2 Inspection at: Midland Site, Midland, MI Inspection conducted: November 29-December 2, and December 5-8, 1977 Inspectors:
R. J. Cook
/
'1~*
/
f 1. / /1. iL,.n.
7 / 7 + %-
,Ju.K. R. Naidu s
.f
r
,
p
.
-
)
') f h.errb',I, W*~
/
/
,
/ //6 /'lk Approved by:
D. W. Hayes, Chief
.
Projects Section j'
,/ /
!
Inspection Summary Inspection on November 29-December 2, and December 5-8, 1977 (Report i
No. 50-329/ 77-12; 50-330/ 77-15)
j i
Areas Inspected:
!
Work activities and quality records related to concrete placement Unit 1; procedures, quality records and work activities relatec.
to the installation of safety related components Units 1 and 2; procedures and quality records related to containment structural steel, safety related
structural steel and welding activities Units 1 and 2.
This inspection involved a total of 81 inspector-hours onsite by two NRC inspectors.
Results: No items of noncompliance or deviations were identified.
(