IR 05000553/1980003

From kanterella
Jump to navigation Jump to search
IE Insp Repts 50-553/80-03 & 50-554/80-03 on 800225.No Noncompliance Noted.Major Areas Inspected:Wiring Discrepancies in High Pressure Core Spray Diesel Generator Control Switchgear
ML19323C313
Person / Time
Site: Phipps Bend  
Issue date: 03/23/1980
From: Conlon T, Gibbons T, Merriweather N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19323C302 List:
References
50-553-80-03, 50-553-80-3, 50-554-80-03, 50-554-80-3, NUDOCS 8005150322
Download: ML19323C313 (3)


Text

.-

p;

/

'o UNITED STATES

~-

, _..

NUCLEAR REGULATORY COMMISSION

~

"~

g y*

(U)

{

REGION 11

"

o 101 MARIETTA ST., N.W.. $UITE 3100 ATLANTA, G EORGIA 30303 8 00515032A o

.....

MAR 251980

n Re ly Refer To:

50-553/80-03 50-554/80-03 Tennessee Valley Authority ATTN:

H. G. Parris Manager of Power 500A Chestnut Street Tower II Chattanooga, TN 37401 Gentlemen:

This refers to the inspection conducted by T. D. Gibbons of this office on February 25, 1980 of activities authorized by NRC Construction Permit Nos.

CPPR-162 and CPPR-163 for the Phipps Bend Nuclear Plant facility, and to the discussion of our findings held with G. W. Wadewitz at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

,

Should you have any questions concerning this letter, we will be glad to discuss

,

them with you.

Sincerely,

"

Charles E Chief Reactor Construction and l

Engineering Support Branch

Enclosures:

(See Page 2)

i l

,,..,.

- -

-

..

Tann:cere Volley Authority-2-

,

.,

Enclosures:

Inspection Report Nos. 50-553/80-03 and 50-554/80-03

REGION 11

101 MARIETTA ST., N.W., SUITE 3100 Y-

[

ATLANTA, G EORGIA 303o3

.....

Report Nos. 50-553/80-03 and 50-554/80-03 Licensee: Tennessee Valley Authority 500A Chestnut Street Chattanooga, TN 37401 Facility Name: Phipps Bend Docket Nos. 50-553 and 50-554 License Nos. CPPR-162 and CPPR-163 Inspection it Phipps Bend site near Kingsport, Tennessee Inspecto

f M

["M"O T. D. Gibbons

Date Signed

,

h M

S- /G Ph N. Merriweather (Intern)

Date Signed

_ J -j/- [a Approved by e;f V

T. E. Conlon, Section Chief, RCES Branch Date Signed SUMMARY Inspection on February 25, 1980 Areas Inspected This special announced inspection involved 9 inspector-hours on site in the area of wiring discrepancies in the high pressure core spray diesel generator control switchgear.

[

Results Of the area inspected, no items of noncompliance or deviations were identified.