U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION III
Report No. 50-546/78-10; 50-547/78-10 Docket No. 50-546; 50-547 License No. CPPR-170; CPPR-171 Licensee: Public Service of Indiana 1000 East Main Street Plainfield, IN 46168 Facility Name: Marble Hill Nuclear Generating Station, Units 1 and 2 Inspection At: Marble Hill Site, Jefferson County, IN Inspection Conducted: December 12-14, 1978
s E
c. ( +/18. d (t
..
j_7
,
Inspectors:
E. R. Schweibinz
<
.
.,,
C. E. Jones
/'-
- <
y2 ND 4/,O
/ jdt'
, ~ ' _
Approved by:
D. W. Hayes, @ ief
'
/
-
Projects Section Inspection Summary Inspection on December 12-14, 1978 (Report No. 50-546/78-10; 50-547/78-10)
Areas Inspected:
Licensee actions on previous inspection findings; and site tour.
This inspection involved a total of 42 inspector-hours onsite by two NRC inspectors.
Results: No items of noncompliance or deviations were identified.
79031300No
.
DETAILS Persons Contacted Public Service of Indiana (PSI)
- R.
M. Brown, Construction Project Engineer
- F.
R. Hodges, Manager, Quality Assurance
- R.
S. Peterson, Quality Assurance Supervisor
- J. M. Coffman, QC Engineer-Civil
- F.
W. Riecks, QA Supervisor, Audit Group
- J.
E. Leonard, Accountant W. Jones, Document Control Supervisor T. L.
McLarty, QC Engineer-Mechanical Whalen-Chilstrom D. Noss, QC Inspector The inspectors also contacted and interviewed other licensee and contractor personnel, including craftsmen, QL/QC, technical and engineering staff members.
- Denotes those attending the exit meeting.
Licensee Action on Previous Inspection Findings (Closed) Followup ltem (546/78-01-01) - Placing of concrete in conjested areas was not included in the concrete placement procedure, WPN-9.
WPN-9, Revision 7, June 28, 1978, Parca.aph 4.2.5 was reviewed by the inspector that identified this item and found to address the above concern. This item is closed.
(Closed) Followup Item (546/78-01-03) - Although concrete was not being produced, the aggregate storage pile was found to be frozen. To prevent the use of frozen aggregate the licensee has fabricat2d bar grates to be used on top of the hoppers, during freezing conditions. This item is closed.
(Closed) Followup Item (546/78-02-07) - Test results of cement samples supplied by the National Bureau of Standards, and tested according to ASTM C-114.
The results of the chemical analysis of the cement supplied to the licensee compared favorably with the actual values as established by the National Bureau of Standards.
This item is closed.
-2-
.
Failure to use the (Closed) Noncompliance (546/78-03-02, 50-546/78-06) -
A random drawing revision for reinforcing steel installation.
most current The drawings were sample was taken of 89 drawings being used in the field.
being used by Whalen-Chilstrom and Newburg-Marble Hill craftsmen and by a These drawings were compared to those found Whalen-Chilstrom QC inspector.
All of the drawings in the document control center and to the master index.
Sargent & Lundy sampled were being properly controlled with one exception. listed in the master index a (S&L) drawing No. S-1106, Revision C was not Further review into this matter indi-in the active aperture card file.
this was an isolated case where S&L issued two revision C's for not cated that revision C was for bid and this aperture card drawing No. S-1106.
The first The second revision C was for construction and the was in the history file.
Procedure No.
found in the field was a copy of the second revision.
print CMP 4.1, Site Document Control, Revision 5, November 7, 1978, Paragraph 4.3.1 has been revised to adequately address the changes in the drawing control methods. This item is closed.
Lack of crocedural requirements (Closed) Noncompliance (546/78-02-01) -
for monitoring welding activities.
Special instructicns WPM-I-SMA and to measure the WPM-NI-SMA were reviewed with regard to the requirement In additon, the inspector reviewed the records electrode burn-off-rate.
the weld in the possession of two of the welding supervisors to see that This item is closed.
burn-off-rates were being measured.
Functional or Program Areas Inspected Site Tour The tour The inspectors raade an extensive tour of the construction site.
the flood plane area and the outlying included the reactor building area, storage areas.
No items of noncompliance or deviations were identified.
Exit Meeting (denoted in the The inspectors met with the licensee's representatives 14, 1978 at the conclusion of Persons Contacted paragraph) on December the inspection and summarized the scope and findings of the inspection.
The licensee representatives were informed that Mr. E. R. Schweibinz is now the newly assigned Project inspector for Marble Hill, Units 1 and 2.
-3-