Security Baseline Inspection Report 05000498/2025402 and 05000499/2025402
ML25260A027
Person / Time
Site: South Texas  
Issue date: 09/17/2025
From: Jesse Rollins
NRC/RGN-IV/DRSS/PSB
To: Kharrl C
South Texas
References
EPID I-2025-402-0015 IR 2025402
Download: ML25260A027 (7)


Text

September 17, 2025

SUBJECT:

SOUTH TEXAS PROJECTSECURITY BASELINE INSPECTION REPORT 05000498/2025402 AND 05000499/2025402

Dear Charles Kharrl:

On September 10, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at South Texas Project and discussed the results of this inspection with Eric Stephens, General Manager, Organizational Effectiveness & Regulatory Affairs, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jesse M. Rollins, Chief Physical Security Branch Division of Radiological Safety & Security Docket Nos. 05000498 and 05000499 License Nos. NPF-76 and NPF-80

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000498 and 05000499

License Numbers:

NPF-76 and NPF-80

Report Numbers:

05000498/2025402 and 05000499/2025402

Enterprise Identifier:

I-2025-402-0015

Licensee:

STP Nuclear Operating Company

Facility:

South Texas Project

Location:

Wadsworth, TX

Inspection Dates:

September 08, 2025, to September 10, 2025

Inspectors:

M. Ordoyne, Physical Security Inspector

Approved By:

Jesse M. Rollins, Chief

Physical Security Branch

Division of Radiological Safety & Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at South Texas Project, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspector evaluated the access control program through completion of the following

inspection elements: Access Control

(1)

  • Tier I: 11 Requirements (02.01 c, e, 02.02 c g, 02.04 a, c, e, 02.05 a)
  • Tier II: 7 Requirements (02.06 a, c, 02.08 d g, i)
  • Tier III: 1 Requirement (02.09)

71130.09 - Security Plan Changes

The inspector evaluated the security plan changes through completion of the following procedure elements:

Security Plan Changes (1 Partial)

(1)

(Partial)

The opportunity to apply this procedure was not available in accordance with IMC 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p)(2) since the last performance of this IP.

OTHER ACTIVITIES

BASELINE 71151 - Performance Indicator Verification The inspector verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)

(1) July 01, 2024, through June 30,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspector verified no proprietary information was retained or documented in this report.

  • On September 10, 2025, the inspector presented the security baseline inspection results to Eric Stephens, General Manager, Organizational Effectiveness & Regulatory Affairs, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Corrective Action

Documents

24-8869, 24-9047

24-9168, 24-9171

24-9323, 24-

251, 24-11168

24-5395, 25-1900

25-4884, 25-5146

71130.02

Corrective Action

Documents

Resulting from

Inspection

25-7965, 25-7973

71130.02

Procedures

0PGP03-ZA-0107

Security of the South Texas Project Electric Generating

Station

71130.02

Procedures

0PGP03-ZS-0001

Vehicle, Material and Personnel Access Control

71130.02

Procedures

0PGP03-ZS-0005

Control of Keys, Locks, Cores, Keycards and Passwords

71130.02

Procedures

Security

Instruction 2101

Access Control

71130.02

Procedures

Security

Instruction 2301

Compensatory Measures

71130.02

Procedures

ST-466

STP Physical Security Plan

71151

Procedures

Security

Instruction 1006

Security Performance Indicator Calculation

14