IR 05000456/2014404

From kanterella
Jump to navigation Jump to search
IR 05000456-14-404; 05000457-14-404; on 04/21/2014 - 04/25/2014, Braidwood Station, Units 1 and 2; Routine Security Baseline Inspection. (Cover Letter Only)
ML14147A211
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 05/22/2014
From: Richard Skokowski
Plant Support Branch II
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
Alan Anderson
References
IR-14-404
Download: ML14147A211 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION May 22, 2014

SUBJECT:

BRAIDWOOD STATION, UNITS 1 AND 2 NRC SECURITY BASELINE INSPECTION REPORT 05000456/2014404; 05000457/2014404

Dear Mr. Pacilio:

On April 25, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Braidwood Station, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on April 25, 2014, with Mr. P. Boyle and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings were identified during this inspection.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS.

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1)

and follow the instructions for withholding in 10 CFR 2.390 (b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 Nonpublic Enclosure:

IR 05000456/2014404; 05000457/2014404 w/Attachment: Supplemental Information cc w/encl: N. Simonian, NSIR/DSO/DDSO/STSB E. Wharton, NSIR/DSO/NSOB T. Dimitriadis, Region I B. Desai, RII M. Haire, RIV B. Finlay, Braidwood Station Security Manager J. Klinger, State Liaison Officer, Illinois Emergency Management Agency cc w/o encl: Distribution via LISTSERV