IR 05000456-06-007(DRS); 05000457-06-007(DRS); 07/17/2006-07/20/2006; Braidwood Station; Baseline Physical Security Inspection; Event Follow-up - Cover Letter
ML062410294
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 08/25/2006
From: Kenneth Riemer
Division Reactor Projects III
To: Crane C
Exelon Generation Co, Exelon Nuclear
References
IR-06-007
Download: ML062410294 (8)


Text

ust 25, 2006

SUBJECT:

BRAIDWOOD STATION, UNITS 1 AND 2 NRC PHYSICAL SECURITY BASELINE INSPECTION REPORT NO. 05000456/2006007; 05000457/2006007(DRS)

Dear Mr. Crane:

On July 20, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed a baseline security inspection of your Braidwood Station, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process.

The enclosed inspection report documents the inspection results, which were discussed on July 20, 2006, with Mr. E. Wrigley and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

This report documents one finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process). The deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector left site.

EXEMPT FROM PUBLIC DISCLOSURE May be exempt from public release under the Freedom of Information Act (5 U.S.C. 552)

Exemption number: 5 Nuclear Regulatory Commission review required before Enclosure Contains .

public release. Upon Separation This Page is Decontrolled.

K.Brooks, RIII/DRS/PSB Name and organization of person making determination.

Date of determination: 07/27/06 NRC is treating this violation as a Non-Cited Violation (NCV) consistent with Section VI.A.1 of the NRC Enforcement Policy because of the very low security significance of the violation and because it is entered into your corrective action program. If you contest this NCV, you should provide a response within 30 days of the date fo this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator Region III, the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Braidwood Station.

The finding was NRC identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public document room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFr 2.390(b)(1).

Enclosure Contains .

Upon Separation This Page is Decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Kenneth Riemer, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 Enclosure: Inspection Report 05000456/2006007(DRS);

05000457/2006007(DRS)

w/Attachment: Supplemental Information See Attached Distribution Enclosure Contains .