IR 05000444/1982005

From kanterella
Jump to navigation Jump to search
IE Mgt Meeting Repts 40-443/82-05 & 50-444/82-05 on 820506. Major Areas Discussed:Operational QA Program,Including Licensee Plans for Implementing QA Criteria Per 10CFR50 App B & FSAR Section 17.2
ML20053E910
Person / Time
Site: Seabrook  
Issue date: 05/26/1982
From: Gallo R, Napuda G, Wiggins J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20053E906 List:
References
50-443-82-05, 50-443-82-5, 50-444-82-05, 50-444-82-5, NUDOCS 8206100200
Download: ML20053E910 (3)


Text

m

.

U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I Report Nos.

50-443/92-05; 50-444/82-05 Docket Nos.

50-443; 50-444 License Nos. CPPR-135; CPPR-136 Priority

--

Category A

Licensee:

Public Service Company of New Hampshire 1000 Elm Street Manchester, New Hampshire 03105 Facility Name: Seabrook Units 1 and 2 Meeting at:

NRC Region I Office, King of Prussia PA Meeting conducted: May 6, 1982 es:

,C f.(/$.%

I date T. Wiggyspeactor Inspector S/M9'n

$1. mVf

$

G. Napudr,/ Reactor Inspector date

~

l k

?L6!)]2 Approved by:

R. M. Gallo, Chief,' Reactor Projects

'date'

Section No. IA, OPRP Meeting Summary:

Meeting on May 6, 1982 (Combined Report Nos. 50-443/82-05; 50-444/82-05).

Representatives of the Public Service Company of New Hampshire met with members of the NRC Region I staff to discuss the Operational Quality Assurance Program for Seabrook Station (25 hours2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br />). Areas of discussion included the licensee's l

plans for implementing the 18 specific quality assurance criteria described in 10 CFR 50 Appendix B and commitments made in Section 17.2 of the Seabrook

'

Final Safety Analysis Report.

8206100200 020526 PDR ADOCK 05000443 O

PDR

y

.

1.

Meeting Attendees NRC Eldon Brunner, Chief, Projects Branch 1, Region I Stewart Ebneter, Chief, Engineering Branch, Region I Robert Gallo, Chief Reactor Projects Section IA, Region I John Gilray, Quality Assurance Branch, NRR George Napuda, Reactor Engineering Inspector, Region I James Wiggins, Project Inspector, Region I Public Service Company of New Hampshire Dale Fleming, Acting Quality Assurance Supervisor, Seabrook V. Lewis Killpack, Nuclear Quality Manager, PSNH Neal Pillsbury, Technical Services Manager, Seabrook George Thomas, Nuclear Production Superintendent PSNH 2.

Purpose and Conduct of the Meeting The meeting was held at the request of PSNH to discuss, with NRC Region I, the proposed Operations Quality Assurance Plan for Seabrook Station. The meeting included a presentation, by PSNH personnel, of the plan followed by a brief discussion period.

3.

Presentation and Discussion PSNH described their plan as proposed in Section 17.2 of the Final Safety Analysis Report.

The presentation covered the 18 areas of the plan that address the criteria of 10 CFR 50. Appendix B.

Principal discussions by the NRC staff covered the following items concerning the specifics of the plan:

The proposed quality assurance / quality control (QA/QC) organization for Seabrook.

The interfaces between the QA and the QC organizations Safeguards provided by site and corporate management to insure the independence of the departmental QC inspectors at Seabrook

,

The proposed size of the QA/QC staff y

The completion status of the plan's implementing procedures The applicant's plans for ensuring the timely distribution of as-built drawings and other information during the operations phase

n

__

, -.

u

~

The licensee's plans for record retention and control The licensee's proposed audit plan including those audits required to be performed at the direction of the Nuclear Safety and Review Committee 4.

NRC Action The Region I staff deferred the final decision regarding the acceptability cf the PSNH plan to the Quality Assurance Branch (QAB) of the Office of Nuclear Reactor Regulation (NRR). However, NRC Region I's positions regarding the plan were communicated to PSNH at the meeting. NRR:QAB will evaluate the plan, considering the Region I comments, and document the results of their evaluation in the Safety Evaluation Report for the Seabrook Station.