IR 05000336/2006015

From kanterella
(Redirected from IR 05000423/2006015)
Jump to navigation Jump to search
IR 05000336/2006015 and 05000423/2006015; Millstone Power Station, Units 2 and 3; Ti 2515/168
ML062370421
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 08/25/2006
From: Paul Krohn
NRC/RGN-I/DRP/PB6
To: Christian D
Dominion Resources
References
IR-06-015
Download: ML062370421 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ust 25, 2006

SUBJECT:

MILLSTONE POWER STATION, UNITS 2 AND 3 - NRC INSPECTION REPORT 05000336/2006015 and 05000423/2006015

Dear Mr. Christian:

On July 20, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Millstone Power Station, Units 2 and 3. The enclosed inspection report documents the inspection results, which were discussed on July 20, 2006, with Mr. Bill Watson, Millstone B.5.b Project Manager, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 and the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

Warning: Violation of Section 147 of the Atomic Energy DETERMINATION Act, Safeguards Information, is subject to civil and MADE BY:

criminal penalties. NAME/TITLE: Barry C. Westreich, Chief ORGANIZATION: NSIR/DNS/SOS BASIS: 2/25/02 NRC Order SIGNATURE: /RA/ 5/12/06 In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable I response, please provide the level of protection described in 10 CFR 73.21.

Sincerely,

/RA/

Paul Krohn, Chief Projects Branch 6 Division of Reactor Projects Docket No. 50-336, 50-423 License No. DPR-65, NPF-49 Enclosure: NRC Inspection Report 05000336/2006015 and 05000423/2006015 ( )

cc w/o encl:

J.A. Price, Site Vice President, Millstone D.W. Dodson, Supervisor, Station Licensing cc w/encl; w/SGI:

J. Campbell, Site Security Manager, Millstone E. Wilds, Director, State of Connecticut State Liaison Officer Designee J. Spath, State of New York, State Liaison Officer PGK SUNSI Review Complete: (Reviewers Initials)

DOCUMENT NAME: TI2515-168Millstone wo enclwpd.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME MSchneider/PGK PKrohn DATE 08/25/06 08/25/06 OFFICIAL RECORD COPY