IR 05000335/2017301

From kanterella
(Redirected from IR 05000389/2017301)
Jump to navigation Jump to search
Notification of Licensed Operator Initial Examination 05000335/2017301 and 05000389/2017301
ML17164A085
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 06/09/2017
From: McCoy G J
Division of Reactor Safety II
To: Nazar M
Florida Power & Light Co
References
50-335/17-301, 50-389/17-301
Preceding documents:
Download: ML17164A085 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 9, 2017

Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division

Florida Power & Light Company Mail Stop EX/JB 700 Universe Blvd.

Juno Beach, FL 33408

SUBJECT: ST. LUCIE PLANT - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000335/2017301 AND 05000389/2017301

Dear Mr. Nazar:

During a telephone conversation on May 25, 2017, between Mr. Erik Feightner, Operations Training Supervisor and Mr. Mark Bates, Senior Operations Engineer, arrangements were made for the administration of licensing examinations at the St. Lucie Nuclear Plant. The on-site preparatory week is scheduled for the week of November 6, 2017. The operating test is scheduled to be administered during the weeks of December 4, 2017 and December 11, 2017.

The written examination is scheduled to be administered the week of December 18, 2017.

As agreed during the telephone conversation, your staff will prepare both the operating test and written examination based on the guidelines in Revision 11 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outline by July 7, 2017. Mr. Mark Bates provi ded a written examination outline to your staff on April 3, 2017. The operating tests, written examination, and the supporting reference materials identified in Attachment 3 to ES-201, will be due by October 2, 2017. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline, examination, and test before they are submitted to the NRC for review and approval. All materials shall be complete and

ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021, contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090) and medical certifications (OMB approval number 3150-0024) at least 30 days before the first examinati on date. Any waiver and/or excusal requests (OMB approval number 3150-0090) should be submitted at least 60 days before the first examination date. Contact Mr. Bates to determine the method for submission of the waiver or excusal requests. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018. The public reporting burden for this collection of information is estimated to average 2500 hours0.0289 days <br />0.694 hours <br />0.00413 weeks <br />9.5125e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. Mr. Feightner has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Bates at (404) 997-4612, (Internet email: Mark.Bates@nrc.gov, or me at (404) 997-4551, (Internet email:

Gerald.McCoy@nrc.gov

).

Sincerely,

/RA/ Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety

Docket No. 50-335, 50-389 License No. DPR-67, NPF-16

cc: Distribution via Listserv

_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE MAB7 VIA EMAIL GJM1 NAME BATES MCCOY DATE 6/9/2017 6/9/ 2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO