IR 05000361/2014003
| ML14223B217 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 08/11/2014 |
| From: | Ray Kellar NRC/RGN-IV/DNMS/RSFSB |
| To: | Thomas J. Palmisano Southern California Edison Co |
| Kellar R | |
| References | |
| IR-14-003 | |
| Download: ML14223B217 (11) | |
Text
UNITED STATES ust 11, 2014
SUBJECT:
SAN ONOFRE NUCLEAR GENERATING STATION - NRC INSPECTION REPORT 050-00361/14-003 AND 050-00362/14-003
Dear Mr. Palmisano:
This refers to the inspection completed on June 30, 2014, at the permanently shut down San Onofre Nuclear Generating Station facility, Units 2 and 3. The purpose of the inspection was to determine whether decommissioning activities were being conducted safely and in accordance with U.S. Nuclear Regulatory Commission (NRC) requirements. The enclosed inspection report documents the inspection results which were discussed with you and other members of your staff on July 15, 2014.
During this inspection, the NRC staff examined activities conducted under your license as they relate to public health and safety to confirm compliance with the Commission's rules and regulations, and with the conditions of your license. Within these areas, the inspection consisted of selected examination of procedures and representative records, observations of activities, and interviews with personnel. During the inspection period, the NRC reviewed the following aspects of onsite activities: self-assessments, audits, and corrective actions; and decommissioning performance and status review. The enclosed report presents the results of this inspection.
In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter, its enclosure, and your response, if you choose to provide one, will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy or proprietary, information so that it can be made available to the Public without redaction.
-2-If you have any questions concerning this inspection, please contact Greg Warnick, Senior Resident Inspector, at 949-492-2641.
Sincerely,
/RA/
Ray L. Kellar, P.E., Chief Repository and Spent Fuel Safety Branch Division of Nuclear Materials Safety Docket No.: 50-361, 50-362 License No.: NPF-10, NPF-15
Enclosure:
NRC Inspection Report 050-00361/14-003 and 050-00362/14-003
REGION IV==
Docket: 50-361, 50-362 License: NPF-10, NPF-15 Report: 050-00361/14-003 and 050-00362/14-003 Licensee: Southern California Edison Facility: San Onofre Nuclear Generating Station, Units 2 and 3 Location: 5000 S. Pacific Coast Hwy San Clemente, CA Dates: April 1 through June 30, 2014 Inspector: G. Warnick, Senior Resident Inspector Approved By: Ray L. Kellar, Chief Repository and Spent Fuel Safety Branch Division of Nuclear Materials Safety Attachment: Supplemental Inspection Information Enclosure
EXECUTIVE SUMMARY Southern California Edison NRC Inspection Report 050-00361/14-003; 050-00362/14-003 This inspection was a routine, announced inspection of decommissioning activities being conducted at the San Onofre Nuclear Generating Station. In summary, the licensee was conducting site activities in accordance with procedures, license requirements, and regulations.
Self-Assessments, Audits, and Corrective Actions
- Issues were identified by the licensee at appropriate thresholds and entered into the corrective action program. Issues were screened and prioritized commensurate with safety significance. Licensee evaluations determined the significance of issues and included appropriate corrective actions. (Section 1.2)
Decommissioning Performance and Status Review
- The licensee conducted decommissioning activities in accordance with license and regulatory requirements. Radiation postings and boundaries were maintained in accordance with regulatory requirements. Ongoing work was conducted following applicable procedures and in accordance with license and regulatory requirements. Finally, the inspector conducted plant tours to verify that the materiel condition of structures, systems, and components supported the safe storage of spent fuel and conduct of safe decommissioning. (Section 2.2)
-2-
Report Details Summary of Plant Status - Units 2 and 3 At the time of this inspection, the two units continued to be permanently shut down. The primary focus at the San Onofre Nuclear Generating Station (SONGS) facility during the inspection period was associated with decommissioning planning and security modifications to support the change in plant conditions. The licensee also prepared schedules and developed required submittals associated with future decommissioning activities. The licensee continued to drain fluids from various plant systems and abandon systems no longer required to be operable. All systems needed for the safe storage of spent fuel were appropriately maintained.
1 Self-Assessments, Audits, and Corrective Actions (40801)
1.1 Inspection Scope The inspector conducted document reviews and interviews with plant personnel to assess the licensees performance as it related to the following areas:
- Administrative procedures prescribed actions for the identification, evaluation, and resolution of problems;
- Licensee procedures prescribed thresholds for the performance of self-assessments, audits, and surveillances;
- Licensee management reviewed self-assessments, audits, and corrective actions to remain knowledgeable of plant performance; and
- Issues or problems were identified and corrected in accordance with the licensees corrective action program (CAP) through a sampling of select issues.
The inspector reviewed CAP documents on a weekly basis to determine: if a sufficiently low threshold for problem identification existed; the quality of follow-up evaluations including extent of condition; and if the licensee assigned timely and appropriate prioritization for issue resolution commensurate with the significance of the issue.
Issues that were repetitive and those with the potential for safety or regulatory consequence were evaluated further to assess apparent and/or common cause and significance.
1.2 Observations and Findings The inspector determined that issues were identified by the licensee at an appropriate threshold within various functional areas of the site and entered into the CAP. Issues were effectively screened, prioritized, and evaluated commensurate with safety significance. The scope and depth of evaluations were adequate in that the evaluations reviewed addressed the significance of issues and assigned appropriate corrective actions.
-3-
1.3 Conclusions Issues were identified by the licensee at appropriate thresholds and entered into the corrective action program. Issues were screened and prioritized commensurate with safety significance. Licensee evaluations determined the significance of issues and included appropriate corrective actions.
2 Decommissioning Performance and Status Review (71801)
2.1 Inspection Scope The inspector evaluated whether the licensee was conducting decommissioning activities in accordance with license and regulatory requirements. The inspector conducted document reviews, observations, and interviews with plant personnel to assess the licensees performance as it related to the following areas:
- Status of decommissioning through the observation of licensee meetings that planned, reviewed, assessed, and scheduled the conduct of facility decommissioning;
- Whether licensee activities were in accordance with license conditions and docketed commitments;
- Operability and functionality of systems necessary for safe decommissioning was assessed through control room and plant walkdowns including the following systems:
radioactive effluent monitoring, spent fuel pool cooling, level and temperature control, radiation protection monitors and alarms, equipment important to emergency preparedness, and equipment that provided normal and standby electrical power;
- Operator logs and data taking for normal facility operations, surveillances, maintenance and verification that data out of specification was appropriately dispositioned and resolved;
- Assessed ongoing in-plant work activities to ensure work activities were evaluated for risk in accordance with 10 CFR 50.65(a)(4), operational work risk assessments were performed and operations shift turnovers appropriately communicated pertinent plant status;
- Verified appropriate plant staffing was maintained and that appropriate management oversight of licensee and supplemental activities were performed;
- Verified pre-job briefs were conducted for facility operations including maintenance, surveillance, operations, and decommissioning activities;
- Verified that system isolations, boundaries and abandonment plans for saltwater cooling, emergency core cooling, component cooling water, and electrical distribution systems ensured proper control of systems important to safe shutdown and did not adversely affect the overall plant configuration;
- Performed frequent plant tours to assess field conditions and decommissioning abandonment activities;
-4-
- Observed in progress field work to verify activities were conducted in accordance with approved work instructions and workers were knowledgeable of tasks;
- Plant materiel condition of structures, systems, and components was maintained at a high level to ensure safe storage of spent fuel;
- Verified the storage of combustibles and flammables were in accordance with plant procedures and the fire plan for the subject location;
- Verified firefighting equipment and stations were properly maintained, inventoried and readied for use; and
- Verified that the installed fire detection and suppression systems were effectively maintained, surveillances performed and were capable of performing their intended function.
2.2 Observations and Findings The inspector determined through the plant tours and observation of activities that the licensee conducted activities in accordance with the regulatory requirements and plant procedures. Minor deficiencies identified by the inspector or the licensee were appropriately identified in the CAP in a timely manner and corrected commensurate with the safety significance of the issue.
2.3 Conclusions The licensee conducted decommissioning activities in accordance with license and regulatory requirements. Radiation postings and boundaries were maintained in accordance with regulatory requirements. Ongoing work was conducted following applicable procedures and in accordance with license and regulatory requirements.
Finally, the inspector conducted frequent plant tours to verify that the material condition of structures, systems, and components supported the safe storage of spent fuel and conduct of safe decommissioning.
3 Meetings, Including Exit On July 15, 2014, the inspector presented the final inspection results to the Vice President and Chief Nuclear Officer, and other members of the licensees staff. The inspector asked the licensee whether any materials examined during the inspection should be considered proprietary. No proprietary information was identified.
-5-
SUPPLEMENTAL INSPECTION INFORMATION KEY POINTS OF CONTACT Licensee Personnel E. Avella, Director, Decommissioning Initial Activities L. Bosch, Manager, Engineering J. Brabec, Manager, Regulatory Affairs and Emergency Preparedness J. Davis, Manager, Operations K. Flynn, Supervisor, Plant Engineering T. Gallaher, Supervisor, Corrective Action Program/Performance Improvement R. Granaas, Senior Nuclear Engineer J. Madigan, Director, Oversight and Nuclear Safety Concerns M. Moran, Manager, Engineering M. Morgan, Senior Nuclear Engineer, Regulatory Affairs and Emergency Preparedness R. Pettus, Licensing/Compliance Specialist R. Quam, Manager, Security M. Shepard, Manager, DIA Projects B. Sholler, Shutdown Plant Manager INSPECTION PROCEDURES USED IP 40801 Self-Assessments, Audits, and Corrective Actions IP 71801 Decommissioning Performance and Status Review ITEMS OPENED, CLOSED, AND DISCUSSED Opened None Closed None Discussed None Attachment
LIST OF ACRONYMS ADAMS Agencywide Documents Access and Management System CAP Corrective Action Program CFR Code of Federal Regulations IP Inspection Procedure NRC U.S. Nuclear Regulatory Commission SONGS San Onofre Nuclear Generating Station LIST OF DOCUMENTS REVIEWED Section 1: Self-Assessments, Audits, and Corrective Actions PROCEDURES NUMBER TITLE REVISION SO123-XV-50 Corrective Action Program 30 NUCLEAR NOTIFICATIONS NUMBER 202782958 202782073 202844394 202791908 202915280 202920407 202776625 Section 6: Decommissioning Performance and Status Review PROCEDURES NUMBER TITLE REVISION SO23-3-2.11 Spent Fuel Pool Operations 39 SO23-XX-10 Maintenance Rule Risk Management Program 9 Implementation NUCLEAR NOTIFICATIONS NUMBER 202719402-2-