IR 05000336-09-402, 05000423-09-402; on 02/23/2009 - 02/27/2009; Millstone Power Station; Access Control
ML090890376
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 03/30/2009
From: James Trapp
Plant Support Branch 1
To: Christian D
Dominion Resources
References
FOIA/PA-2011-0115 IR-09-402
Download: ML090890376 (5)


Text

March 30, 2009

Mr. David Senior Vice President and Chief Nuclear Officer Dominion Resources 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT MILLSTONE POWER PLANT - NRC SECURITY INSPECTION REPORT NOS.

05000336/2009402 AND 05000423/2009402

Dear Mr. Christian:

On February 27, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Millstone Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC=s Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on February 27, 2009, with Mr. A.J. Jordan, Site Vice President, and other members of your staff.

The inspection examined activities conducted under your licenses as they relate to security and compliance with the Commission=s rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

This report documents one NRC identified finding of very low security significance (i.e. Green as determined by the Physical Protection Significance Determination Process). The deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of the inspection before the inspectors left the site. The finding had a cross-cutting aspect in the area of Human Performance, because expectations regarding procedural compliance were not effectively communicated.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC=s document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection.

When separated from its Enclosure, this document is DECONTROLLED. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity-Related Information - Withhold Under 10 CFR 2.390@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety

Docket Nos.

50-336, 50-423 License Nos. DPR-65, NPF-49

Enclosure:

NRC Inspection Report Nos. 05000336/2009402, 05000423/2009402 w/Attachment: Supplemental Information CONTAINS (OUO-SRI)