Insp Repts 50-329/75-02 & 50-330/75-02 on 750205-07.No Noncompliance Noted.Major Areas Inspected:Design Interface Requirements,Bechtel Quarterly Master Auditing Plan,Qa Procedure & Containment Rebar Spacing Nonconformance
ML19329F139
Person / Time
Site: Midland
Issue date: 03/25/1975
From: Rohrbacher R, Vetter W, Williams C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19329F136 List:
References
50-329-75-02, 50-329-75-2, 50-330-75-02, 50-330-75-2, NUDOCS 8006200680
Download: ML19329F139 (5)


Text

p,

__

....-.----

.- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

-

.C

,

W; i

.s-

.

.s'

'

-

,

,

-

.

'li. S. NUCLEAR REGULATORY COMMISSION

.

.

.I

  • =

'0FFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report of Construction Inspection-IE Inspection Report No. 050-329/75-02 IE Inspection Report No. 050-330/75-02

-

\\

Licensee:

Consumers Power Company 1945 West Parnall Road Jackson, Michigan 49201 Midland Units 1 and 2 Licenses No. CPPR-81

_

Midland, Michigan and No. CPPR-82 Category:

A

'l-Type of Licensee: PWR (B&W) 650 MWe,. Unit 1; 818 MWe, Unit 2 Type of Inspection:.Special, Announced Date of Inspection: February 26, 1975 Dates of Previous Inspection:

February 5-7, 1975 (Construction)

CZsu s

Principal Inspector:

T. E. Vandel

[-Jf 77 ff y

,

a Accompanying Inspector:

1. T. Yin 7-J S /

N'3^

l

,

(Date)

Other Accompanying Personnel:

None

'

,

Reviewed By:

D. W. Hayes 3[2f/ g Senior Construction Project Inspector

/(Da'te)

..

,

I

'

l (U

8006200h

.

.

- -. - -

.

..

.

.

,,

__

_. _.

_-

_

,

.

,

.

.

.. -

,

.

-

.

.

,

-9

..

. *-

,.

. [d t

~b SUMMARY OF FINDINGS

'

.

Enforcement Action A.^

Noncompliance-No. noncompliance of NRC requirements were identified.

B.

Safety Matters

.

None identified.

-

.

Licensee Action on Previously Identified Enforcement Action Not applicable.

~

Design Changes-

'

Not applicable.

Other Significant Findinge A.

Current Project Status ('

During an inspection conducted February 5-7, 1975 (IE Inspection

\\s Report No. 050-330/75-01) a review of records,_ developed in connection with the'rebar spacing nonconformance,* indicated insufficient information relative to design and analysis conditions assumed. At that time,

,,

the licensee could not address IE:III's questions bat agreed to

.

review the matter.with the Bechtel Associates Professional Corporation.

their Architect-Engineer. This is the follow-up inspection arranged with the-Consumers Power Company, performed at the Bechtel Corporation r-offices at inn Arbor, Michigan.

.

B.

Unresolved Matters Unit-2 Containment Rebar Spacing Nonconformance

Bechtel Associates Professional Corporation (Bechtel) and Consumers

Power Company (CP) are to provide further studies on the' safety implication analysis relative to spacing of the Unit 2 containment-

-

rebars.. (Report Details, Paragraph 3)

j

'

C.

Status of Previously Reported Unresolved Matters

.

Not applicable.

'

.

'. '

K-2-t

\\

\\

k /-

(

.

t l

_.., _. _

,

__

a,_.

-

,

e.

-

-- -

- - - - - - - - - -

- - - - - - - - - - - - - - - - - - - -

-

.

.

-

.,

~~

-

.

3,.

..

1.-

.

,.

..

..

p\\I

.. ;* Management Interview.

' ' '

A.

.The'fo11owing persons att' ended the management interview at th'e conclusion of the inspection:

-

Consumers Power Company (CP)

.

H. W. Slager, Midland Project Quality Assurance Administrator Bechtel Associates Professional Corporation (Bechtel)-

-

E. Rumbaugh, Engineer Madager P. A. Martine=, Midland Project Engineer K. Wiedner, Chief Civil / Structural Engineer R. L. Castleberry, Project-Engineer

<

J. L. Hurley, Assistant Project Engineer J. Hink, Civil Design Group Supervisor T. Thiruvengadam, Senior Engineer

__

M. G. O'Mara, Midland Project Quality Assurance Engineer

-

W. F. Holub, Midland Project Quality Assurance Engineer C. V. Newton, Midland Quality Assurance Engineer J. I. Dotson, Ann Arbor Quality Assurance Staff B.

Matters discussed and comments, on the part of management personnel, wereJas follows:

C',

1.

The inspector indicated that he had reviewed and was satisfied with.the.Bechtel procedures on design' interface control.

(Report Details, Paragraph 1)

!

2.

The frequency of QA audit on design engineering groups appected to be insufficient. However, the inspector noted that there are significant improvements in recent audit activities.

(Report

,

'

Details, Paragraph 2)

-

.

.

.

3.

The inspector stated that it was his understanding that Bechtel

,

is'to supplement their previous report on rebar spacing nonconformance evaluation.

Such analysis is to directly reflect the PSAR commitments in the areas of design load bases and reactor building design criteria. More detailed design verifying documentation is also to be included in the analysis..

The Bechtel Assistant Project

,.

Engineer noted that~ detailed verification will be provided in accordance with the IE:III inspector's concerns but may not follow the format suggested.

4 g-3-

,

.- )

'

-

.

.

w;-)

>

'

-

.

-

.

,

.**w4 e

,_

.

i

.

.

-.

-n

- _

_

_

_

_ _ -

.r

_

..

..,

'..

.

.

..

.

_

.

')

,E REPORT DETAILS v

.

Persons Contacted The following persons, in addition to the individuals listed under the Management Interview Section of this report, were contacted.

'

Bechtel Associates Professional Corporation (Bechtel)

R. D. Hart, Midland Quality Assurance Engineer J. R. McBride, Midland Quality Assurance Engineer

.

Resolts of Inspection 1.

Bechtel Design Interface Control

-

The inspector reviewed design interface requirements in the areas of:

(1) review, (2) approval, (3) release, (4) distribution, and (5)

revisions.

Bechtel procedures and criteria appear to be adequate and effective.

Documents reviewed:

a.

Engineering Department Procedure (EDP)-4.37, " Preparing (~}

Calculation", Revision 0, dated February 20, 1974.

kl b.

Manager of Engineering Directive TMED)-4.25-0, " Design Interfcce

.

Control", Revision 1, dated February 4, 1975.

t c

MED-4.37-), " Design Calculations", Revison 2, dated July 15, 1974, for Midland Project and Greenwood Unit 1 Project.

2.

Bechtel Design Audit Activities

.

The inspector reviewed Bechtel quarterly master auditing plan covering

.

areas of:

(1) design criteria, (2) calculations, (3) specifications, and (4) interfaces, and audited the following reports of quality assurance audits of engineering design groups:

a.

Design Review Audit on Stress Analysis Group, conducted in November 1974, dated December 20, 1974.

Fifteen (15) Quality Assurance Findings (QAF) were issued as a result of the audit, and training sessions were recommended.

'

.

b.

Design Review Audit document on engineering in February 1974.

c.

Design Rc/iew Audit document on mechanical design in. November

'

'1973.

J

.

,[

.,

-

h J-4-

.:.

.-

.

p.

-

_

,

,

.~.

\\

-

.

....

...

.

~

.

.

,

,

_

..

.

d.:

San Francisco headquarters management audits on Design processes

.c.

,(

') ~ - *E in:

(1) May 1974, (2) October 1974, and (3) November 1974.

x_ /

The inspector also reviewed the following procedures:

QA' Department Procedure Manual, Section C, Procedure 5, a.

'"Proj ect Audit".

b.-

NQAM Section I, No. 4, " Quality Assurance Department", Revison 1, dated June 24, 1974.

NQAM Section V, No. 5, " Quality Assurance Department Procedures",

c.

Revision 2, dated August 2, 1974.

d.

NQAM Section V, No. 6, " Indoctrination and Training", Revision 3, dated August 2, 1974.

The records indicated adequate (1) checklist, (2) review and followup

-

actions, and (3) personnel qualifications.

The frequency of Bechtel Engineering internal audits has been increased considerably since the latter part of 1974.

3.

Unit 2 Containment Rebar Spacing Nonconformance A review was performed of Bechtel report, Investigation of As-built Rcinforcing Steel Spacing for Midland Containment Wall, Revision 0,

.

f/}

dated December 13, 1974.

The results indicated that the report was

~

N_-

not sufficiency complete relative to:

(1) justification of formula use', (2) design bases consideration, (3) adherence to PSAR reactor d

building design criteria, including loading combinations and acceptance criteria, (4) verification documentation, and (5)

'

mathematical accuracy.

CP Quality Assurance and Bechtel Civil / Structural Department were in agreement with the inspector's findings and are to submit a supplementary report on the rebar spacing nonconformance safety evaluation. Target date of submitting a report is March 28, 1975. The outline of Bechtel's preliminary plan to accomplish the reevaluation included:

(1) code evaluation, design conditions, and

. loading conditions, (2) material identification, (3)~ description of analytical methods, (4) stress level and safety factors, (5)

design / verification process documentation, and (6) discussion on justification of the acceptability of the as-built condition.

,

-5-

)

.

.

'

(

)

,

.

gy

.

l e.

,

-y+

I

,\\

-

.. -

.

.