Category:Letter
MONTHYEARML24302A2622024-11-0101 November 2024 Letter to CA SHPO Regarding DCPP Dseis ML24302A2612024-11-0101 November 2024 Letter to Achp Re DCPP Dseis ML24275A0622024-10-30030 October 2024 NRC to NMFS Request Initiate Formal Endangered Species Act Consultation and Abbreviated Essential Fish Habitat for Proposed License Renewal of DCP Plant Units 1, 2 ML24269A0122024-10-29029 October 2024 OEDO-24-00083 2.206 Petition Diablo Canyon Seismic CDF - Response to Petitioner Letter ML24261B9492024-10-24024 October 2024 Issuance of Amendment Nos. 246 and 248 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) DCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 IR 05000275/20244042024-10-23023 October 2024 Security Baseline Inspection Report 05000275/2024404 and 05000323/2024404 ML24277A0292024-10-18018 October 2024 NRC to Fws Req. for Concurrence W. Endangered Species Act Determinations for Diablo Canyon Power Plant Units 1,2, ISFSI Proposed License Renewals in San Luis Obispo Co., CA DCL-24-092, Supplement and Annual Update License Renewal Application, Amendment 12024-10-14014 October 2024 Supplement and Annual Update License Renewal Application, Amendment 1 DCL-24-098, Material Status Report for the Period Ending August 31, 20242024-10-0909 October 2024 Material Status Report for the Period Ending August 31, 2024 DCL-24-091, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation2024-10-0303 October 2024 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation IR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 ML24240A0222024-09-20020 September 2024 Letter to A. Peck Environmental Impact Statement Scoping Summary Report for Diablo Canyon Nuclear Power Plant Units 1 and 2 ML24260A1222024-09-14014 September 2024 14 Sept 2024 Ltr - California Coastal Commission to Pg&E, Incomplete Consistency Certification for Requested Nuclear Regulatory Commission License Renewal for Diablo Canyon Power Plant DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) ML24262A2462024-09-11011 September 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Petitioner Response to Acknowledgement Letter - DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment ML24205A0662024-08-27027 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Ack Letter - Diablo Canyon Units 1 and 2 Seismic Core Damage Frequency - IR 05000275/20243012024-08-26026 August 2024 NRC Examination Report 05000275/2024301; 05000323/2024301 IR 05000275/20240052024-08-22022 August 2024 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2024005 and 05000323/2024005) DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React IR 05000275/20240022024-08-0606 August 2024 Integrated Inspection Report 05000275/2024002 and 05000323/2024002 DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring ML24187A1352024-07-16016 July 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of June 2024 Audit Related to the License Renewal Application Severe Accident Mitigation Alternatives Review IR 05000275/20240142024-07-11011 July 2024 Age-Related Degradation Inspection Report 05000275/2024014 and 05000323/2024014 ML24190A0812024-07-10010 July 2024 NRC Initial Operator Licensing Examination Approval 05000275/2024301; 05000323/2024301 IR 05000275/20244012024-07-0808 July 2024 Security Baseline Inspection Report 05000275/2024401 and 05000323/2024401 (Full Report) IR 05000323/20240112024-07-0303 July 2024 License Renewal Phase Report 05000323/2024011 DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL ML24155A2182024-06-18018 June 2024 OEDO-23-00350-NRR - (LTR-23-0228-1) - Closure Letter - 10 CFR 2.206 Petition from Mothers for Peace and Friends of the Earth Regarding Diablo Canyon ML24129A1762024-06-14014 June 2024 National Historic Preservation Act Section 106 Consultation – Results of Identification and Evaluation (Docket Number: 72-026) ML24200A2052024-06-0707 June 2024 Fws to NRC, List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project for Diablo Canyon License Renewal ML24099A2192024-05-29029 May 2024 Issuance of Amendment Nos. 245 and 247 Revision to TSs to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24117A0132024-05-20020 May 2024 Letter to Paula Gerfen-Diablo Canyon Units 1 and 2-Regulatory Audit Regarding Severe Accident Mitigation Alternatives for the License Renewal Application 05000323/LER-2024-001, LCO 3.0.3 Completion Time Limits2024-05-17017 May 2024 LCO 3.0.3 Completion Time Limits DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report2024-05-16016 May 2024 Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage ML24127A2042024-05-0202 May 2024 02May2024 Ltr - California Coastal Commission to Pg&E, Coastal Development Permit Needed for Pg&E’S Proposed Relicensing of Diablo Canyon Nuclear Power Plant DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report L-24-004, Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007)2024-04-30030 April 2024 Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007) DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report 2024-09-09
[Table view] Category:Inspection Report
MONTHYEARIR 05000275/20244042024-10-23023 October 2024 Security Baseline Inspection Report 05000275/2024404 and 05000323/2024404 IR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 IR 05000275/20243012024-08-26026 August 2024 NRC Examination Report 05000275/2024301; 05000323/2024301 IR 05000275/20240052024-08-22022 August 2024 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2024005 and 05000323/2024005) IR 05000275/20240022024-08-0606 August 2024 Integrated Inspection Report 05000275/2024002 and 05000323/2024002 IR 05000275/20240142024-07-11011 July 2024 Age-Related Degradation Inspection Report 05000275/2024014 and 05000323/2024014 IR 05000275/20244012024-07-0808 July 2024 Security Baseline Inspection Report 05000275/2024401 and 05000323/2024401 (Full Report) IR 05000323/20240112024-07-0303 July 2024 License Renewal Phase Report 05000323/2024011 IR 05000275/20240012024-04-23023 April 2024 Integrated Inspection Report 05000275/2024001 and 05000323/2024001 IR 05000275/20244032024-03-12012 March 2024 Cyber Security Inspection Report 05000275/2024403 and 05000323/2024403 (Cover Letter) IR 05000275/20230062024-02-28028 February 2024 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2023006 and 05000323/2023006) IR 05000275/20230042024-02-0909 February 2024 Integrated Inspection Report 05000275/2023004 and 05000323/2023004 IR 05000275/20230112024-01-12012 January 2024 NRC License Renewal Phase 1 Inspection Report 05000275/2023011 IR 05000275/20230032023-11-13013 November 2023 Integrated Inspection Report 05000275/2023003 and 05000323/2023003 IR 05000275/20240152023-10-10010 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (050002752024015 and 050003232024015) IR 05000275/20230052023-08-22022 August 2023 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2023005 and 05000323/2023005) - Mid Cycle Letter IR 05000275/20230022023-08-14014 August 2023 Quarterly Integrated Inspection Report 05000275/2023002 and 05000323/2023002- August 7, 2023 IR 05000275/20213012023-08-0909 August 2023 Errata for Diablo Canyon Power Plant, Units 1 and 2 - NRC Examination Report 050002752021301 and 050003232021301 IR 05000275/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000275/2023402, and 05000323/2023402 IR 05000275/20233012023-07-25025 July 2023 NRC Initial Operator Licensing Examination Approval 05000275/2023301, 05000323/2023301 IR 05000275/20230102023-05-11011 May 2023 NRC Inspection Report 05000275 2023010 and 05000323 2023010 IR 05000275/20230012023-05-0909 May 2023 Integrated Inspection Report 05000275/2023001 and 05000323/2023001 IR 05000275/20234032023-03-10010 March 2023 NRC Security Baseline Inspection Report 05000275/2023403, 05000323/2023403 (Full Report) IR 05000275/20220062023-03-0101 March 2023 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2022006 and 05000323/2022006) IR 05000275/20220042023-02-0202 February 2023 Integrated Inspection Report 05000275/2022004 and 05000323/2022004 IR 05000275/20220102023-01-27027 January 2023 Biennial Problem Identification and Resolution Inspection Report 05000275/2022010 and 05000323/2022010 IR 05000275/20224022022-10-26026 October 2022 Security Baseline Inspection Report 05000275/2022402 and 05000323/ 2022402 IR 05000275/20220032022-10-24024 October 2022 Integrated Inspection Report 05000275/2022003 and 05000323/2022003 and Exercise of Enforcement Discretion IR 05000275/20220052022-08-23023 August 2022 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2022005 and 05000323/2022005) IR 05000275/20220022022-08-10010 August 2022 Integrated Inspection Report 05000275/2022002 and 05000323/2022002 IR 05000275/20220112022-08-0909 August 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000275/2022011 and 05000323/2022011 IR 05000275/20224012022-08-0303 August 2022 NRC Security Inspection Report 05000275/2022401, 05000323/2022401 ML22143A8812022-05-26026 May 2022 Revised Integrated Inspection Report 05000275/2022001 and 05000323/2022001 ML22118A9362022-05-0505 May 2022 Integrated Inspection Report 05000275/2022001 and 05000323/2022001 IR 05000275/20220012022-05-0505 May 2022 Integrated Inspection Report 05000275/2022001 and 05000323/2022001 IR 05000323/20214202022-03-31031 March 2022 Security Inspection Report 05000275 and 05000323/2021420 IR 05000275/20210062022-03-0202 March 2022 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2021006 and 05000323/2021006) IR 05000275/20210042022-02-0303 February 2022 Integrated Inspection Report 05000275/2021004 and 05000323/2021004 IR 05000275/20214042022-01-13013 January 2022 Public - Security Baseline Inspection Report 05000275/2021404 and 05000323/2021404 IR 05000275/20210032021-11-0303 November 2021 Integrated Inspection Report 05000275/2021003 and 05000323/2021003 IR 05000275/20210112021-09-10010 September 2021 Design Basis Assurance Inspection (Programs) Report 05000275/2021011 and 05000323/2021011 IR 05000275/20214052021-08-0505 August 2021 Security Baseline Inspection Report 05000275/2021405 and 05000323/2021405 IR 07200026/20214012021-08-0303 August 2021 Diablo Canon Nuclear Power Plant, Security Baseline Inspection Report 07200026/2021401 IR 05000275/20210022021-08-0202 August 2021 Integrated Inspection Report 05000275/2021002 and 05000323/2021002 IR 05000275/20210122021-07-28028 July 2021 Temporary Instruction 2515/194 Report 05000275/2021012 and 05000323/2021012 IR 05000275/20214012021-07-0101 July 2021 Security Baseline Inspection Report 05000275/2021401 and 05000323/2021401 IR 05000275/20210012021-05-0707 May 2021 DC IR 2021-001-drk, Diablo Canyon Power Plant Units 1 & 2 - Integrated Inspection Report 05000275/2021001, 05000323/2021001, & Independent Spent Fuel Storage Installation Inspection Report 07200026/2021001 DCL-21-036, One Hundred Eighty Day Steam Generator Report for Diablo Canyon Power Plant Unit 1 Twenty-Second Refueling Outage2021-04-22022 April 2021 One Hundred Eighty Day Steam Generator Report for Diablo Canyon Power Plant Unit 1 Twenty-Second Refueling Outage ML21102A0702021-04-12012 April 2021 Notification of NRC Design Bases Assurance Inspection (Programs) (05000275/2021011 and 05000323/2021011) and Initial Request for Information IR 05000275/20214032021-03-31031 March 2021 Cyber Security Inspection Report 05000275/2021403 and 05000323/2021403 2024-08-06
[Table view] |
Text
UNITE D S TATES NUC LEAR RE GULATOR Y C OMMIS SI ON ary 21, 2009
SUBJECT:
ERRATA FOR DIABLO CANYON POWER PLANT - NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000275/2008008; 05000323/2008008
Dear Mr. Conway:
This errata corrects the Assessment of Self-Assessments and Audits, documented in Section 4OA2.c.2, and adds Section 4OA7. The original documentation failed to include a licensee-identified violation. Please replace pages 4, 14, and 16 with the enclosed pages.
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Gregory Werner, Chief Plant Support Branch 2 Division of Reactor Safety Dockets: 50-275, 50-323 Licenses: DPR-80, DPR-82 Enclosure
Pacific Gas and Electric -2-cc w/Enclosure:
Sierra Club San Lucia Chapter ATTN: Andrew Christie P. O. Box 15755 San Luis Obispo, CA 93406 Nancy Culver San Luis Obispo Mothers for Peace P. O. Box 164 Pismo Beach, CA 93448 Chairman San Luis Obispo County Board of Supervisors 1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408 Truman Burns\Robert Kinosian California Public Utilities Commission 505 Van Ness Ave., Rm. 4102 San Francisco, CA 94102 Diablo Canyon Independent Safety Committee Attn: Robert R. Wellington, Esq.
Legal Counsel 857 Cass Street, Suite D Monterey, CA 93940 Director, Radiological Health Branch State Department of Health Services P. O. Box 997414 (MS 7610)
Sacramento, CA 95899-7414 City Editor The Tribune 3825 South Higuera Street P. O. Box 112 San Luis Obispo, CA 93406-0112 James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 31)
Sacramento, CA 95814
Pacific Gas and Electric -3-James R. Becker, Site Vice President &
Station Director Diablo Canyon Power Plant P. O. Box 56 Avila Beach, CA 93424 Jennifer Tang Field Representative United States Senator Barbara Boxer 1700 Montgomery Street, Suite 240 San Francisco, CA 94111 Chief, Radiological Emergency Preparedness Section National Preparedness Directorate Technological Hazards Division Department of Homeland Security 1111 Broadway, Suite 1200 Oakland, CA 94607-4052
Pacific Gas and Electric -4-Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Chuck.Casto@nrc.gov)
DRP Director (Dwight.Chamberlain@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.gov)
DRS Director (Roy.Caniano@nrc.gov)
DRS Deputy Director (Troy.Pruett@nrc.gov)
Senior Resident Inspector (Michael.Peck@nrc.gov)
Resident Inspector (Tony.Brown@nrc.gov)
Branch Chief, DRP/B (Vincent.Gaddy@nrc.gov)
Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)
DC Site Secretary (Agnes.Chan@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Only inspection reports to the following:
DRS STA (Dale.Powers@nrc.gov)
S. Williams, OEDO RIV Coordinator (Shawn.Williams@nrc.gov)
ROPreports SUNSI Review Completed: GEW ADAMS Yes No Initials: GEW Publicly Available Non-Publicly Available Sensitive Non-Sensitive S:/DRS/Reports/DC 2008008 ERATTA-ear.doc MLxxxxxxxx RI/PSB2 C/PSB2 EARuesch GEWerner
/RA/ /RA/
1/20/09 1/21/09 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
Cornerstone: Public Radiation Safety
- Green. The team identified a finding for failure to take adequate corrective actions to correct adverse trends in control of radioactive and potentially contaminated material as required by the corrective action program. Specifically, between May 2005 and June 2008, the licensee on two occasions identified and failed to correct adverse trends in the control of radioactive and potentially contaminated material. Licensee staff entered this finding into the corrective action program as Notification 50085121.
The finding was more than minor because it affected the Public Radiation Safety cornerstone objective to ensure adequate protection of public health and safety from exposure to radioactive materials released into the public domain as a result of routine civilian nuclear reactor operation. Using Inspection Manual Chapter 0609 Appendix D, Public Radiation Safety Significance Determination Process, the finding was determined to have very low safety significance because the dose impact to a member of the public was less than or equal to 0.005 rem total effective dose equivalent . The finding has a cross-cutting aspect in the area of problem identification and resolution, associated with the corrective action area component; because the licensee failed to thoroughly evaluate problems such that the resolution addressed the cause P.1(c) (Section 4OA2.a.3(b)).
B. Licensee-Identified Violations A violation of very low safety significance which was identified by the licensee has been reviewed by the inspectors. Corrective actions taken or planned by the licensee have been entered into the licensees corrective action program. This violation is listed in Section 4OA7 of this report.
-4- Enclosure
identified in these audits were not acted upon in a timely manner. The licensees corrective action program required that apparent cause evaluations be performed within thirty days on all audit findings. The team noted several examples where items were not completed in a timely manner (some of these examples are noted in Section 4OA2.a.2).
The team further identified that during the two-year inspection period, the quality verification department, responsible for performing a majority of the audits and self-assessments, had experienced a disproportionately high level of personnel turnover.
Specifically, in the eighteen months prior to the inspection, the department lost ten experienced employees. These losses were the result of layoffs and of the unexpected departure of several individuals. In addition, there were two changes in the department directorship over the same period. The team determined that these personnel losses and management changes resulted in insufficient resources to complete all required tasks in a high-quality manner, adversely affecting the capability of the department to conduct key activities and to perform effective independent audits and self-assessments.
The team identified one example of a license-identified noncited violation of regulatory requirements resulting from the lack of adequate resources:
- Over an approximately two-year period, the Quality Verification (QV) department had not been performing or documenting all independent review and audit functions required by Procedure OM4.NQ6, Independent Review and Audit Program, and committed to in the Final Safety Analysis Report (FSAR) Update.
This deficiency was identified by the licensee in its Self-Assessment of Quality Assurance (QA) Program and Quality Verification (QV) Organizational Effectiveness (Pre-NIEP), dated May 22, 2008, and entered into the corrective action program as Action Request A0729878 (see Section 4OA7).
The team noted that in March 2008, a self-assessment by licensee management resulted in the initiation of a root cause investigation to address noted deficiencies in the corrective action program (Non-Conformance Report N0002221). As a result of items identified in this root cause investigation, the licensee has generated an Integrated Action Plan to improve corrective action performance.
.3 Findings No findings of significance were identified.
.d Assessment of Safety Conscious Work Environment
.1 Inspection Scope The team conducted focused interviews with 30 individuals from plant operations, electrical maintenance, and engineering, including supervisory and non-supervisory personnel, to assess whether conditions exist which would challenge the establishment of a safety conscious work environment at Diablo Canyon Power Plant. The team conducted additional interviews with quality assurance personnel and the manager responsible for the employee concerns program.
- 14 - Enclosure
Very few interviewees were familiar with the differing professional opinion process. The inspectors reviewed the single differing professional opinion file maintained in the employee concerns program files and concluded that the differing professional opinion was processed in accordance with station procedures. The team concluded that this differing professional opinion indirectly resulted in an adverse affect on the willingness within a particular engineering organization to raise concerns due to the related increase in workload.
The team concluded that site personnel were willing to raise safety issues to the attention of management. While several workers interviewed expressed a reluctance to report problems to management directly or to document issues in the corrective action program, all were willing to raise concerns to management attention by at least one of the several methods available.
.3 Findings No findings of significance were identified.
4OA6 Management Meetings Exit Meeting On October 20, 2008, the preliminary results of the inspection were discussed with Mr. Peters and other members of the licensee staff. The licensee confirmed that no proprietary information was handled during this inspection.
4OA7 Licensee-Identified Violation The following violation of very low safety significance (Green) or Severity Level IV was identified by the licensee and is a violation of NRC requirements which meets the criteria of the NRC Enforcement Policy for being dispositioned as a non-cited violation.
- 10 CFR 50 Appendix B Criterion II requires, in part, that the licensee regularly review the status and adequacy of the quality assurance program. Procedure OM4.NQ6 establishes the Independent Review and Audit Program for Diablo Canyon Power Plant which requires, in part, that the audit program be reviewed at least semi-annually to assure that audits are being performed as required.
Contrary to this, from 2006 through 2008, the audit program was not reviewed at least semiannually. This issue was documented in the licensees corrective action program as Action Request A0729878. This finding was determined to be of very low safety significance based on NRC management review.
Attachments:
1. Supplemental Information 2. Information Request (May 14, 2008)
3. Information Request (October 14, 2008)
- 16 - Enclosure