IR 05000322/1978014

From kanterella
Jump to navigation Jump to search
IE Inspec Rept 50-322/78-14 on 780913-15 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Admin Controls,Sched for Completion of Sys & Tests, Status of Procedure Completion & Facil Inspec
ML20148R383
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 10/10/1978
From: Briggs L, Shedlosky J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20148R370 List:
References
50-322-78-14, NUDOCS 7811300306
Download: ML20148R383 (3)


Text

- __-_ _ _-_____ ____ __ _______- ______ ___ _____ -_______ - _ ___ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _

O U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I Report No, c;n w/79-14 Docket No. 50-322 License No.CPPR-95 Priority -- Category A Licensee: Long Island Iighting Enmnany 175 East Old Country Road Hicksville, New York 11801 Facility Name: Shoreham Nuclear Station Inspection at: Shoreham, New York Inspection conducted: September 13-15, 1978 Inspectors: d[ , / o/c/4 5-

/ T. Shed osky, Re tor Inspector date signed

'

r/Z -,a "Ne L. E. Brigg//g/ ~s, Reactor Inspector date signed dats' signed Approved by: C, 0, b M h o /6/78

" * 9"*

E. C. McCabe, Jr. , Chief, Reactor Projects Section No. 2, R0 & NS Branch Inspection Summary:

Inspection on September 13-15,1978 (Report No. 50-322/78-14)

Areas Inspected: Routine, unannounced inspection to turnover inspection responsibilities to a reassigned NRC Project Inspector. Included in the inspection were reviews of admin-istrative controls, schedules for construction completion of systems and sub-systems and testing activities; status of completion of procedures and inspection of the facilit The inspection involved 42 man-hours onsite by two NRC inspector Results: Of the three areas inspected, no items of noncompliance were identifie M G Region I Form 12 (Rev. April 77)

.

DETAILS

l 1. Persons Contacted Mr. J. W. Baker, Stone and Webster Lead Advisory Engineer l

Mr. D. F. Bednarczyk, Operating QA Supervisor

  • Mr. D. Durand, Operating QA Engineer
  • Mr. T. F. Gerecke, Engineering Quality Assurance Manager Mr. R. Gutmann, Lead Startup Engineer - Electrical Mr. R. A. Kubinak, Shoreham Plant Manager Mr. L. W. Lewin, Lead Startup Engineer - Instrument and Control
  • Mr. A. E. Pedersen, General Electric Operations Manager Mr. J. Riley. General Electric Operations Supervisor; Lead Start-

. up Engineer - NSSS

  • Mr. J. Rivello, Startup Manager Mr. J. Taylor, Lead Startup Engineer - Balance of Plant Mr. E. J. Youngling, Plant Chief Technical Engineer 6
  • denotes those present at exit interview 2. Facility Inspections The reactor, turbine, control and radioactive waste buildings were inspected as part of the turnover inspection to a reassigned Project Inspector. These inspections were conducted as part of a plant familarization, to assess the status of construction, and to review the implementation of requirements for protection of safety-related equipment. No improperly protected safety related equipment was identifie . Preoperational Test Program The inspectors reviewed revised schedules for the completion of system construction. They discussed the translation of these con-struction schedules to system flush and preoperational test activitie The detailed scheduling of those test activities was reviewed. The inspectors reviewed the progress in completing system flush and preoperational test procedures.

l The inspectors reviewed the document control systems in the Startup Resource Center. Included were system turnover packages, controlled prints and procedures.

1 l

l

_

~

3

.

4. Exit Interviews

At the conclusion of the inspection the inspecte' met with licensee representatives (denoted in Paragraph 1) and summarized the inspection scope, purpose and findings.

l