p R E G (,4,"

UNITED STATES

? * NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 July 7, 2010 Mr. David Site Vice President Duke Energy Carolinas, LLC Oconee Nuclear Station 7800 Rochester Highway Seneca, SC 29672 SUBJECT: OCONEE NUCLEAR STATION - NRC INSPECTION REPORT 05000269/2010006, 05000270/2010006, 05000287/2010006

Dear Mr. Baxter:

On June 10, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Oconee Nuclear Station Units 1, 2, and 3 of the interim compensatory measures to mitigate external flooding. The enclosed inspection report documents the inspection results which were discussed on June 10, 2010, with Mr. Pitesa and other members of your staff.

The inspection examined activities conducted under your licenses as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no findings were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.qov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, ifany. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information -Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1). A-2-

D'ECIAL USE ONLY-DEC 2 Should you have any questions concerning this letter, please contact us.

Sincerely, IRAI Jonathan H. Bartley, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-269, 50-270, 50-287 License Nos.: DPR-38, DPR-47, DPR-55

Enclosure:

NRC Integrated Inspection Report 05000269/2010006, 05000270/2010006, 05000287/2010006 w/Attachment: Supplemental Information

REGION II==

Docket Nos: 50-269, 50-270, 50-287 License Nos.: DPR-38, DPR-47, DPR-55 Report No.: 05000269/2010006, 05000270/2010006, 05000287/2010006 Licensee: Duke Energy Carolinas, LLC Facility: Oconee Nuclear Station, Units 1, 2 and 3 Location: Seneca, SC 29672 Dates: June 7, 2010, through June 10, 2010 Inspectors: C. Rapp, Senior Project Engineer W. Rogers, Senior Reactor Analyst K. Martin, Human Factors Engineer Approved by: J. Bartley, Chief Reactor Projects Branch 1 Division of Reactor Projects OF E Enclosure

0 1 SUMMARY OF FINDINGS IR 05000269/2010-002, 05000270/2010006, 05000287/2010006; 01/01/2010 - 03/31/2010; Oconee Nuclear Station Units 1, 2 and 3; Interim Compensatory Measures for External Flood This report covered a one week inspection by a senior project engineer, a senior reactor analyst, and a human factors engineer. No findings were identified. NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process."

FFICl NO T Enclosure

- FFICIA SEQi - SECURITY RELATED'INFURMAiTIGN

4 OTHER 40A5 Other

.1 Review of Interim Compensatory Measures (ICMs) for External Flooding a. Inspection Scope By letter dated January 15, 2010, the licensee provided specific ICMs to mitigate the effects of a failure of the Jocassee dam. On June 3, 2010, the licensee submitted a letter to update these ICMs. The inspectors reviewed the mitigation strategy associated with these ICMs to verify the strategy was effective and the ICMs were either implemented or would be implemented within a reasonable period. The following inspection activates were conducted to verify each ICM was either completed or scheduled for completion. Documents reviewed are listed in the Attachment.

  • Reviewed the applicable procedures for the visual inspections and the results of these inspections.
  • Reviewed the annual FERC and the 5-year independent inspection reports.
  • Walked down the seepage collection and monitoring system.
  • Reviewed completed monitoring results associated with seepage monitoring.
  • Interviewed select personnel associated with performing the Jocassee visual dam inspections.
  • Performed a walk-down of the designated route for temporary hoses.
  • Observed ammeters and voltmeters on Keowee spillway gates, the operating procedure for the spillway gates and, calibration procedure for the ammeters and voltmeters.
  • Interviewed operations personnel to ascertain that they understood their responsibilities in performing the mitigation strategy.
  • Observed training conducted for response personnel.
  • Reviewed assignment document for the ONS Jocassee engineer and interviewed the individual assigned.
  • Walked down selected critical tasks and confirming that critical equipment was staged and functionally tested.
  • Observed cameras monitoring Jocassee lake level were functional and verified the video signal was available in the Jocassee control room.
  • Reviewed the calibration procedure for forebay and tailrace level instruments.
  • Observed that a compressor and air wrench and a portable generator with electric drive motor were staged at the Jocassee spillway for alternate methods of operating the spillway gates.
  • Observed Jocassee personnel operating both the compressor and the portable generator with electric drive motor.
  • Interviewed Jocassee and Keowee control room personnel to assess their understanding of duties and responsibilities related to a Jocassee dam failure.

OFFICIAL EECUR.W USE O'LY RELATED INFORMATIM Enclosure

O * 4 b. Findinqs No findings were identified. The inspectors determined that the lCMs were either implemented or will be implemented within the schedule provided by the licensee. The ICMs were a viable mitigation strategy for external flooding while the licensee developed permanent external flooding mitigation strategy. The flood mitigation manual actions could be accomplished within the required times. The interim changes in mitigation strategy were reflected in their emergency procedures and personnel were trained on the procedural changes.

40A6 Manaaement Meetinas (Includina Exit)

Exit Meeting Summary The inspectors presented the inspection results to Mr. Bill Pitesa and other members of licensee management on June 10, 2010. The licensee acknowledged the findings presented. The inspectors asked the licensee whether any of the material examined during the inspection should be considered proprietary and no proprietary information was identified.

DnNFORMATIclo Enclosure

  • D ClAL USE O0U !.F.R ~ .** ***=';...!:i ".:

SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee K. Alter, Regulatory Compliance Manager M. Austin, Fleet EP Manager S. Batson, Engineering Manager R. Brown, Emergency Preparedness Manager A. Burns, Civil Engineer D. Deatherage, Outage Manager P. Earnhardt, External Flood Project Manager R. Freudenberger, Safety Assurance Manager D. Garland, Engineering Supervisor L. Kanipe, Risk Analyst B. Keaton, Hydro System Engineer B. Lynch, Primary Systems Engineer R. McCoy, Civil Engineer B. Meixell, Regulatory Compliance B. Pitesa, Senior Vice President, Nuclear Operations B. Stares, Civil Engineer DOCUMENTS REVIEWED Section 40A5: Other EM-5.3, Rev 2 AP/0/A/2000/001, Rev 5 RP/O/B/1000/0 10, Rev 7 PIP 0-10-04606 PIP 0-10-04714 AP/0/A/1700/047, Rev 1 JOCAP/00/WR/001, Rev 0 Oconee Training Package for AP/O/A/1700/047 changes Jocassee Hydro Station Emergency Action Plan dated 12/31/20'09 Keowee Hydro Station Emergency Action Plan dated 12/31/2009 Calculation Number OSC-9940, approved 6/7/2010 AP/O/A/1700/047, Rev. 1 Dam Safety Inspection Report, Jocasee Development of Keowee-Toxaway Project, dated 3/20/08 Dam Safety Inspection Report, Jocasee Development of Keowee-Toxaway Project, dated 6/10/09 2009 Dam Safety Surveillance and Monitoring Report, Jocassee #2503-02 dated 3/30/10 Jocassee Logbook Jocasee Outside Rounds Recording Logbook Potential Failure Modes Analysis Jocassee Development Keowee-Toxaway Project, dated 12/04 1,011 ONLY S, ELA.TE-D .NFAtRMAthmn Attachment

OP/O/A/1 106/042, Rev. 2 PT/2/A/0I152/006, Rev 20 FERC Part 12D Safety Inspection Report, Jocassee Development Keowee-Toxaway Project, 12/09 Drawing J-0025-F, Rev 6 Drawing J-0025-C-A, Rev 2 PT/0/B/0120/032, Enclosure 13.14, Rev. 36 Work Order 01858749 01 External Flood Mitigation CTP-1 Suction/Flow Capability Verification External Flood Mitigation CTP-1 Suction Capability Verification External Flood Mitigation Abnormal Procedure Validation Flow Model Verification CTP-1 Suction Capability Verification Letter dated February 22, 2010 from Carol S. Goolsby, Vice President Hydro Fleet to Mr.

Charles D. Wagner, FERC IPi0/A/3959/002, Rev. 1 Work Order 01879045 01, IAE Calibrate Amp and Volt Meters CP/0/A/4002/006 Drawing 3901-ABO8, Sheet 8 of 18, Rev. 0 Keowee-Toxaway Project High-Water Operations Process, dated 5/12/10 Procedure Request ONS-2010-003464, Condenser Circulating Water System Valve Stroke Test HCAP/0/1000/XX 1, Jocassee Forebay and Tailrace Rate of Change Alarms and Jocassee Tailrace Level Critical High Alarm Response Plan Work Order 10703355, Jocassee Forebay/Tailrace Instrument Verification N RI Attachment