MONTHYEARML24305A1492024-11-0404 November 2024 Review of the Fall 2023 Steam Generator Tube Inspection Report (O2R31) IR 05000269/20240032024-10-31031 October 2024 Integrated Inspection Report 05000269/2024003 and 05000270/2024003 and 05000287/2024003 (2) IR 05000269/20240052024-08-26026 August 2024 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 (Report 05000269/2024005, 05000270/2024005, and 05000287-2024005) IR 05000269/20240022024-07-25025 July 2024 Integrated Inspection Report 05000269/2024002 and 05000270/2024002 and 05000287/2024002 IR 05000269/20240012024-05-0303 May 2024 Integrated Inspection Report 05000269/2024001, 05000270/2024001 and 05000287/2024001 IR 05000269/20244022024-04-24024 April 2024 Security Baseline Inspection Report 05000269/2024402 and 05000270/2024402 and 05000287/2024402 IR 05000269/20244012024-03-28028 March 2024 – Security Baseline Inspection Report 05000269-2024401 and 05000270-2024401 and 05000287-2024401 IR 05000269/20230062024-02-28028 February 2024 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 - (NRC Inspection Report 05000269/2023006, 05000270/2023006, and 05000287/2023006) IR 05000269/20240102024-02-21021 February 2024 Information Request- Oconee Nuclear Station, Age Related Degradation Inspection 05000269/2024010, 05000270/2024010 and 05000287/2024010 IR 05000269/20230042024-02-13013 February 2024 Integrated Inspection Report 05000269/2023004, 05000270/2023004, and 05000287/2023004; and Inspection Report 07200040/2023001 IR 05000269/20243012024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion IR 05000269/20230052023-08-25025 August 2023 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2 and 3 (Report 05000269/2023005, 05000270/2023005, and 05000287/2023005) IR 05000269/20230022023-07-28028 July 2023 Integrated Inspection Report 05000269/2023002, 05000270/2023002 and 05000287/2023002 IR 05000269/20230102023-07-19019 July 2023 Biennial Problem Identification and Resolution Inspection Report 05000269/2023010 and 05000270/2023010 and 05000287/2023010 and Notice of Violation IR 05000269/20234202023-05-18018 May 2023 Security Baseline Inspection Report 05000269/2023420 and 05000270/2023420 and 05000287/2023420 ML23124A0302023-05-18018 May 2023 Security Baseline Inspection Report 05000269/2023420 and 05000270/2023420 and 05000287/2023420 RA-23-0128, Refuel 32 (O1R32) Steam Generator Tube Inspection Report2023-05-18018 May 2023 Refuel 32 (O1R32) Steam Generator Tube Inspection Report IR 05000269/20230012023-05-12012 May 2023 Integrated Inspection Report 05000269/2023001 and 05000270/2023001 and 05000287/2023001 IR 05000269/20234012023-04-14014 April 2023 – Security Baseline Inspection Report 05000269 2023401 and 05000270 2023401 and 05000287 2023401 IR 05000269/20230112023-03-0303 March 2023 Notification of Oconee Nuclear Station Comprehensive Engineering Team Inspection - NRC Inspection Report 05000269/2023011, 05000270/2023011 and 05000287/2023011 IR 05000269/20220062023-03-0101 March 2023 Annual Assessment Letter for Oconee Nuclear Nuclear Station, Units 1, 2 and 3 (NRC Inspection Report 05000269/2022006, 05000270/2022006, and 05000287/2022006) ML23037A0772023-02-0606 February 2023 402 Cyber Notification and RFI Letter Final IR 05000269/20220042023-02-0202 February 2023 Integrated Inspection Report 05000269 2022004 and 05000270/2022004 and 05000287/2022004 IR 05000269/20220032022-11-0707 November 2022 Integrated Inspection Station 05000269/2022003 and 05000270/2022003 and 05000287/2022003 IR 05000269/20220112022-09-26026 September 2022 NRC Inspection Report 05000269/2022011 and 05000270/2022011 and 05000287/2022011 IR 05000269/20220052022-08-26026 August 2022 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 - NRC Inspection Report 05000269/2022005, 05000270/2022005, and 05000287/2022005 IR 05000269/20224012022-08-26026 August 2022 Material Control and Accounting Program Inspection Report 05000269/2022401 and 05000270/2022401 and 05000287/2022401 (OUO Removed) IR 05000270/20220022022-07-29029 July 2022 Integrated Inspection Report 05000269/ 2022002 and 05000270/2022002 and 05000287/2022002 IR 05000269/20220102022-06-30030 June 2022 Triennial Fire Protection Inspection Report 05000269/2022010 and 05000270/2022010 and 05000287/2022010 IR 05000269/20220012022-05-0404 May 2022 Integrated Inspection Report 05000269/2022001, 05000270/2022001 and 05000287/2022001 IR 05000269/20224032022-05-0404 May 2022 Security Baseline Target Set Inspection Report 05000269/2022403 and 05000270/2022403 and 05000287/2022403 IR 05000269/20224042022-04-27027 April 2022 Security Baseline Inspection Report 05000269/2022404 and 05000270/2022404 and 05000287/2022404 IR 05000269/20223012022-03-0707 March 2022 Notification of Licensed Operator Initial Examination 05000269/2022301, 05000270/2022301 and 05000287/2022301 IR 05000269/20210062022-03-0202 March 2022 Annual Assessment Letter for Oconee Nuclear Station, Units 1, 2, and 3 (Report 05000269/2021006, 05000270/2021006, and 05000287/2021006) IR 05000269/20220122022-02-24024 February 2022 Safety Conscious Work Environment Issue of Concern Followup Report 05000269/2022012 and 05000270/2022012 and 05000287/2022012 IR 05000269/20224022022-02-16016 February 2022 Security Baseline Inspection Report 05000269/2022402 and 05000270/2022402 and 05000287/2022402 IR 05000269/20210042022-02-14014 February 2022 Integrated Inspection Report 05000269/2021004 and 05000270/2021004 and 05000287/2021004 and Apparent Violation IR 05000269/20210032021-10-28028 October 2021 Integrated Inspection Report 05000269/2021003 and 05000270/2021003 and 05000287/2021003 IR 05000269/20210102021-09-17017 September 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000269/2021010 and 05000270/2021010 and 05000287/2021010 IR 05000269/20210052021-08-26026 August 2021 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2, and 3 (NRC Inspection Report 05000269/2021005, 05000270/2021005, and 05000287/2021005) IR 07200004/20210012021-08-26026 August 2021 Operation of an Independent Spent Fuel Storage Installation Report 07200004/2021001 IR 05000269/20210022021-08-0404 August 2021 Integrated Inspection Report 05000269/2021002 and 05000270/2021002 and 05000287/2021002 IR 05000269/20213012021-07-0606 July 2021 NRC Operator License Examination Report 05000269/2021301, 05000270/2021301, and 05000287/2021301 IR 05000269/20210112021-06-0202 June 2021 Biennial Problem Identification and Resolution Inspection Report 05000269/2021011 and 05000270/2021011 and 05000287/2021011 IR 05000269/20210012021-04-23023 April 2021 Integrated Inspection Report 05000269/2021001 and 05000270/2021001 and 05000287/2021001 IR 05000269/20214012021-04-22022 April 2021 Security Baseline Inspection Report 05000269/2021401, 05000270/2021401 and 05000287/2021401 (U) IR 05000269/20200062021-03-0303 March 2021 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2, & 3 NRC Inspection Report 05000269/2020006, 05000270/2020006, & 05000287/2020006 IR 05000269/20200042021-02-22022 February 2021 Reissue- Oconee Nuclear Station Integrated Inspection Report 05000269/2020004, 05000270/2020004, 05000287/2020004 2024-08-26
[Table view] Category:Letter
MONTHYEAR05000269/LER-2022-001-01, Ultrasonic Examination Indication Identifies Degraded Reactor Coolant System Pressure Boundary2024-11-0707 November 2024 Ultrasonic Examination Indication Identifies Degraded Reactor Coolant System Pressure Boundary ML24305A1492024-11-0404 November 2024 Review of the Fall 2023 Steam Generator Tube Inspection Report (O2R31) IR 05000269/20240032024-10-31031 October 2024 Integrated Inspection Report 05000269/2024003 and 05000270/2024003 and 05000287/2024003 (2) ML24255A3322024-10-16016 October 2024 SLRA - Revised SE Letter ML24297A6172024-10-11011 October 2024 PCA Letter to NRC Oconee Hurricane Helene ML24269A0912024-10-0909 October 2024 Request for Withholding Information from Public Disclosure IR 05000269/20240052024-08-26026 August 2024 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 (Report 05000269/2024005, 05000270/2024005, and 05000287-2024005) ML24145A1782024-08-26026 August 2024 Issuance of Amendment Nos. 430, 432, and 431, to TS 5.5.2, Containment Leakage Rate Testing Program for a one-time Extension of the Type a Leak Rate Test Frequency ML24220A1092024-08-0808 August 2024 – Operator Licensing Examination Approval 05000269/2024301, 05000270/2024301, and 05000287/2024301 05000287/LER-2024-001, Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation2024-08-0202 August 2024 Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation IR 05000269/20240022024-07-25025 July 2024 Integrated Inspection Report 05000269/2024002 and 05000270/2024002 and 05000287/2024002 ML24192A1312024-07-15015 July 2024 Licensed Operator Positive Fitness-For-Duty Test ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 ML24183A2352024-06-29029 June 2024 Update 3 to Interim Report Regarding a Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 ML24179A1102024-06-27027 June 2024 Submittal of Updated Final Safety Analysis Report Revision 30, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions, 10 CFR 50.59 Evaluation Summary Report, and 10 CFR 54.37 Update, and Notification ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc IR 05000269/20240012024-05-0303 May 2024 Integrated Inspection Report 05000269/2024001, 05000270/2024001 and 05000287/2024001 IR 05000269/20244022024-04-24024 April 2024 Security Baseline Inspection Report 05000269/2024402 and 05000270/2024402 and 05000287/2024402 ML24108A0792024-04-16016 April 2024 EN 57079 Paragon Energy Solutions Email Forwarding Part 21 Interim Report Re Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 IR 05000269/20244012024-03-28028 March 2024 – Security Baseline Inspection Report 05000269-2024401 and 05000270-2024401 and 05000287-2024401 ML24088A3052024-03-25025 March 2024 Fws to NRC, Agreement with Nlaa Determination for Tricolored Bat for Oconee Lr 05000287/LER-2023-002, Passive Containment Isolation Device Inoperability Results in Operation or Condition Prohibited by Technical Specifications2024-02-29029 February 2024 Passive Containment Isolation Device Inoperability Results in Operation or Condition Prohibited by Technical Specifications 05000270/LER-2023-001, Inappropriate Procedural Guidance for Planned Online Maintenance Results in Event or Condition That Could Have Prevented Fulfillment of a Safety Function Licensee2024-02-29029 February 2024 Inappropriate Procedural Guidance for Planned Online Maintenance Results in Event or Condition That Could Have Prevented Fulfillment of a Safety Function Licensee IR 05000269/20230062024-02-28028 February 2024 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 - (NRC Inspection Report 05000269/2023006, 05000270/2023006, and 05000287/2023006) ML24045A3032024-02-16016 February 2024 Ltr. to John Creel Chief Edisto Natchez-Kusso Tribe of Sc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2952024-02-16016 February 2024 Ltr. to Chuck Hoskin, Jr, Principal Chief Cherokee Nation Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3072024-02-16016 February 2024 Ltr. to Pete Parr Chief Pee Dee Indian Tribe Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3012024-02-16016 February 2024 Ltr. to Harold Hatcher Chief the Waccamaw Indian People Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3022024-02-16016 February 2024 Ltr. to Joe Bunch United Keetoowah Band of Cherokee Indians in Ok Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24030A0052024-02-16016 February 2024 Ltr. to Brian Harris, Chief, Catawba Indian Nation; Re., Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2972024-02-16016 February 2024 Ltr. to Dexter Sharp Chief Piedmont American Indian Assoc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2992024-02-16016 February 2024 Ltr. to Eric Pratt Chief the Santee Indian Organization Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2962024-02-16016 February 2024 Ltr. to David Hill Principal Chief Muscogee Creek Nation Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3082024-02-16016 February 2024 Ltr. to Ralph Oxendine Chief Sumter Tribe of Cheraw Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3062024-02-16016 February 2024 Ltr. to Michell Hicks, Principal Chief Eastern Band of Cherokee Re Oconee Nuclear Station Units 1,2, and 3 Section 106 ML24045A3052024-02-16016 February 2024 Ltr. to Louis Chavis Chief Beaver Creek Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2942024-02-16016 February 2024 Ltr. to Carolyn Chavis Bolton Chief Pee Dee Indian Nation of Upper Sc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3042024-02-16016 February 2024 Ltr. to Lisa M. Collins Chief the Wassamasaw Tribe of Varnertown Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24030A5212024-02-13013 February 2024 Letter to Elizabeth Johnson, Director, SHPO; Re Oconee Nuclear Stations Units 1, 2, and 3 Section 106 ML24011A1482024-02-13013 February 2024 Letter to Steven M. Snider-Oconee Nuclear Sta, Unites 1,2 & 3 Notice of Avail of the Draft Site-Specific Supp. 2, 2nd Renewal to the Generic EIS for Lic. Renew of Nuclear Plants ML24011A1532024-02-13013 February 2024 Letter to Tracy Watson EPA-Oconee Nuclear Sta, Unites 1, 2 & 3 Notice of Avail of the Draft Site-Specific Supp. 2, 2nd Renewal to the Generic EIS for Lic. Renew of Nuclear Plants IR 05000269/20230042024-02-13013 February 2024 Integrated Inspection Report 05000269/2023004, 05000270/2023004, and 05000287/2023004; and Inspection Report 07200040/2023001 ML24019A1442024-02-13013 February 2024 Letter to Reid Nelson, Executive Director, Achp; Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML23304A1422024-02-0101 February 2024 Issuance of Environmental Scoping Summary Report Associated with the U.S. Nuclear Regulatory Commission Staff’S Review of the Oconee Nuclear Station, Units 1, 2, & 3, Subsequent License Renewal Application ML24005A2492024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000269/20243012024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) ML23262A9672023-12-13013 December 2023 Alternative to Use RR-22-0174, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Division 1 IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 2024-08-08
[Table view] |
Inspection Report - Oconee - 2010006 |
---|
|
|
Text
p R E G (,4,"
UNITED STATES
? * NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 July 7, 2010 Mr. David Site Vice President Duke Energy Carolinas, LLC Oconee Nuclear Station 7800 Rochester Highway Seneca, SC 29672 SUBJECT: OCONEE NUCLEAR STATION - NRC INSPECTION REPORT 05000269/2010006, 05000270/2010006, 05000287/2010006
Dear Mr. Baxter:
On June 10, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Oconee Nuclear Station Units 1, 2, and 3 of the interim compensatory measures to mitigate external flooding. The enclosed inspection report documents the inspection results which were discussed on June 10, 2010, with Mr. Pitesa and other members of your staff.
The inspection examined activities conducted under your licenses as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no findings were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.qov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, ifany. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information -Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1). A-2-
D'ECIAL USE ONLY-DEC 2 Should you have any questions concerning this letter, please contact us.
Sincerely, IRAI Jonathan H. Bartley, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-269, 50-270, 50-287 License Nos.: DPR-38, DPR-47, DPR-55
Enclosure:
NRC Integrated Inspection Report 05000269/2010006, 05000270/2010006, 05000287/2010006 w/Attachment: Supplemental Information
REGION II==
Docket Nos: 50-269, 50-270, 50-287 License Nos.: DPR-38, DPR-47, DPR-55 Report No.: 05000269/2010006, 05000270/2010006, 05000287/2010006 Licensee: Duke Energy Carolinas, LLC Facility: Oconee Nuclear Station, Units 1, 2 and 3 Location: Seneca, SC 29672 Dates: June 7, 2010, through June 10, 2010 Inspectors: C. Rapp, Senior Project Engineer W. Rogers, Senior Reactor Analyst K. Martin, Human Factors Engineer Approved by: J. Bartley, Chief Reactor Projects Branch 1 Division of Reactor Projects OF E Enclosure
0 1 SUMMARY OF FINDINGS IR 05000269/2010-002, 05000270/2010006, 05000287/2010006; 01/01/2010 - 03/31/2010; Oconee Nuclear Station Units 1, 2 and 3; Interim Compensatory Measures for External Flood This report covered a one week inspection by a senior project engineer, a senior reactor analyst, and a human factors engineer. No findings were identified. NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process."
FFICl NO T Enclosure
- FFICIA SEQi - SECURITY RELATED'INFURMAiTIGN
4 OTHER 40A5 Other
.1 Review of Interim Compensatory Measures (ICMs) for External Flooding a. Inspection Scope By letter dated January 15, 2010, the licensee provided specific ICMs to mitigate the effects of a failure of the Jocassee dam. On June 3, 2010, the licensee submitted a letter to update these ICMs. The inspectors reviewed the mitigation strategy associated with these ICMs to verify the strategy was effective and the ICMs were either implemented or would be implemented within a reasonable period. The following inspection activates were conducted to verify each ICM was either completed or scheduled for completion. Documents reviewed are listed in the Attachment.
- Reviewed the applicable procedures for the visual inspections and the results of these inspections.
- Reviewed the annual FERC and the 5-year independent inspection reports.
- Walked down the seepage collection and monitoring system.
- Reviewed completed monitoring results associated with seepage monitoring.
- Interviewed select personnel associated with performing the Jocassee visual dam inspections.
- Performed a walk-down of the designated route for temporary hoses.
- Observed ammeters and voltmeters on Keowee spillway gates, the operating procedure for the spillway gates and, calibration procedure for the ammeters and voltmeters.
- Interviewed operations personnel to ascertain that they understood their responsibilities in performing the mitigation strategy.
- Observed training conducted for response personnel.
- Reviewed assignment document for the ONS Jocassee engineer and interviewed the individual assigned.
- Walked down selected critical tasks and confirming that critical equipment was staged and functionally tested.
- Observed cameras monitoring Jocassee lake level were functional and verified the video signal was available in the Jocassee control room.
- Reviewed the calibration procedure for forebay and tailrace level instruments.
- Observed that a compressor and air wrench and a portable generator with electric drive motor were staged at the Jocassee spillway for alternate methods of operating the spillway gates.
- Observed Jocassee personnel operating both the compressor and the portable generator with electric drive motor.
- Interviewed Jocassee and Keowee control room personnel to assess their understanding of duties and responsibilities related to a Jocassee dam failure.
OFFICIAL EECUR.W USE O'LY RELATED INFORMATIM Enclosure
O * 4 b. Findinqs No findings were identified. The inspectors determined that the lCMs were either implemented or will be implemented within the schedule provided by the licensee. The ICMs were a viable mitigation strategy for external flooding while the licensee developed permanent external flooding mitigation strategy. The flood mitigation manual actions could be accomplished within the required times. The interim changes in mitigation strategy were reflected in their emergency procedures and personnel were trained on the procedural changes.
40A6 Manaaement Meetinas (Includina Exit)
Exit Meeting Summary The inspectors presented the inspection results to Mr. Bill Pitesa and other members of licensee management on June 10, 2010. The licensee acknowledged the findings presented. The inspectors asked the licensee whether any of the material examined during the inspection should be considered proprietary and no proprietary information was identified.
DnNFORMATIclo Enclosure
- D ClAL USE O0U !.F.R ~ .** ***=';...!:i ".:
SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee K. Alter, Regulatory Compliance Manager M. Austin, Fleet EP Manager S. Batson, Engineering Manager R. Brown, Emergency Preparedness Manager A. Burns, Civil Engineer D. Deatherage, Outage Manager P. Earnhardt, External Flood Project Manager R. Freudenberger, Safety Assurance Manager D. Garland, Engineering Supervisor L. Kanipe, Risk Analyst B. Keaton, Hydro System Engineer B. Lynch, Primary Systems Engineer R. McCoy, Civil Engineer B. Meixell, Regulatory Compliance B. Pitesa, Senior Vice President, Nuclear Operations B. Stares, Civil Engineer DOCUMENTS REVIEWED Section 40A5: Other EM-5.3, Rev 2 AP/0/A/2000/001, Rev 5 RP/O/B/1000/0 10, Rev 7 PIP 0-10-04606 PIP 0-10-04714 AP/0/A/1700/047, Rev 1 JOCAP/00/WR/001, Rev 0 Oconee Training Package for AP/O/A/1700/047 changes Jocassee Hydro Station Emergency Action Plan dated 12/31/20'09 Keowee Hydro Station Emergency Action Plan dated 12/31/2009 Calculation Number OSC-9940, approved 6/7/2010 AP/O/A/1700/047, Rev. 1 Dam Safety Inspection Report, Jocasee Development of Keowee-Toxaway Project, dated 3/20/08 Dam Safety Inspection Report, Jocasee Development of Keowee-Toxaway Project, dated 6/10/09 2009 Dam Safety Surveillance and Monitoring Report, Jocassee #2503-02 dated 3/30/10 Jocassee Logbook Jocasee Outside Rounds Recording Logbook Potential Failure Modes Analysis Jocassee Development Keowee-Toxaway Project, dated 12/04 1,011 ONLY S, ELA.TE-D .NFAtRMAthmn Attachment
OP/O/A/1 106/042, Rev. 2 PT/2/A/0I152/006, Rev 20 FERC Part 12D Safety Inspection Report, Jocassee Development Keowee-Toxaway Project, 12/09 Drawing J-0025-F, Rev 6 Drawing J-0025-C-A, Rev 2 PT/0/B/0120/032, Enclosure 13.14, Rev. 36 Work Order 01858749 01 External Flood Mitigation CTP-1 Suction/Flow Capability Verification External Flood Mitigation CTP-1 Suction Capability Verification External Flood Mitigation Abnormal Procedure Validation Flow Model Verification CTP-1 Suction Capability Verification Letter dated February 22, 2010 from Carol S. Goolsby, Vice President Hydro Fleet to Mr.
Charles D. Wagner, FERC IPi0/A/3959/002, Rev. 1 Work Order 01879045 01, IAE Calibrate Amp and Volt Meters CP/0/A/4002/006 Drawing 3901-ABO8, Sheet 8 of 18, Rev. 0 Keowee-Toxaway Project High-Water Operations Process, dated 5/12/10 Procedure Request ONS-2010-003464, Condenser Circulating Water System Valve Stroke Test HCAP/0/1000/XX 1, Jocassee Forebay and Tailrace Rate of Change Alarms and Jocassee Tailrace Level Critical High Alarm Response Plan Work Order 10703355, Jocassee Forebay/Tailrace Instrument Verification N RI Attachment