IR 05000269/1983014
| ML20024A445 | |
| Person / Time | |
|---|---|
| Site: | Oconee, 05000587 |
| Issue date: | 06/15/1983 |
| From: | Ennis J, Mcguire D, Tillman A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20024A430 | List: |
| References | |
| 50-269-83-14, 50-270-83-14, NUDOCS 8306170307 | |
| Download: ML20024A445 (2) | |
Text
SAFt. GUARDS INFORMATION pa %q UNITED STATES 4.g
'k NUCLEAR REGULATORY COMMISSION E
o REGION 11
.E 101 MARETTA ST., N.W., SUITE 3100 h
.....
Report Nos. 50-269/83-14, 50-270/83-14, and 50-287/83-14 Docket Nos. 50-269, 50-270, and 50-287 License Nos. DPR-38, DPR-47, and DPR-55 Licensee: Duke Power Company 422 South Church Street Charlotte, NC 28242 Facility Name: Oconee 1, 2, and 3 Inspection at: Oconee site near Seneca, South Carolina Inspection conducted: May 9 - 13,1983 Date of Last Physical Security Inspection Visit: January IC - 14, 1983 Type of Inspecti fi:
announced Ph sical Security Inspectors:
/
A MA/
[o /// M
. h(sf:aT 5ecurity Inspector
'Dite Yigned Pt
~
N.
fillma M
Y/f/f3
'
J.
n
, Ph sical Security Inspector Da'te Signed
@!/f!f/2 Approved by:
680 D. R. McGuire, Chief, Physical Security Section Dats S/igiied Safeguards Branch, Division of Emergency Preparedness and Materials Safety Programs Inspection Summary Area Inspected:
Included site orientation; review of security plan and implementing procedures; security organization-management; security organization personnel; security organization-response; records and reports; testing and maintenance; locks, keys, and combinations; physical barriers-protected area; physical barrier-vital areas; lighting; assessment aids; access control-personnel; access control packages; access control-vehicles; detection aids protected area; detection aids-vital areas; alarm stations; communications; general requirements for personnel; additional requirements for power reactor personnel; safeguards contingency plan implementation review; and physical protection safeguards information.
In addition, the I
inspectors reviewed the status of various security operational activities to determine the validity of several concerns relating to security force capa-bility and protection provided the Oconee Nuclear Station, expressed by an individual to Region II.
!*
(
RSS'il88R7 !S88sk ec"S
O PDR
.. _
_
_
.
SAFEGUARDS INFORMAT
.
.
.,
'
'The inspection involved 76 inspector hours on site by two NRC inspectors. - Ten -
inspection hours were accomplished during offshift periods.
'
Results: The licensee was found to be in compliance with NRC requirements
~
within the 23 areas examined during the inspection.
!
i U
!
l
l;
!
,
$.
!
i
!
I
ENCLOSURE COtnAM i
TION.
SATEGUARDS ItE0ml.A
!,
IS-U?C3 sg?ARATION D
.
SAFEGUARDS INFORMATlow L