IR 05000269/1983014

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Repts 50-269/83-14,50-270/83-14 & 50-287/83-14 on 830509-13.No Noncompliance Noted.Major Areas Inspected:Security Plan & Implementing Procedures & Security Organization Mgt.Safeguards Info Deleted (Ref 10CFR73.21)
ML20024A445
Person / Time
Site: Oconee, 05000587  Duke Energy icon.png
Issue date: 06/15/1983
From: Ennis J, Mcguire D, Tillman A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20024A430 List:
References
50-269-83-14, 50-270-83-14, NUDOCS 8306170307
Download: ML20024A445 (2)


Text

SAFt. GUARDS INFORMATION pa %q UNITED STATES 4.g

'k NUCLEAR REGULATORY COMMISSION E

o REGION 11

.E 101 MARETTA ST., N.W., SUITE 3100 h

.....

Report Nos. 50-269/83-14, 50-270/83-14, and 50-287/83-14 Docket Nos. 50-269, 50-270, and 50-287 License Nos. DPR-38, DPR-47, and DPR-55 Licensee: Duke Power Company 422 South Church Street Charlotte, NC 28242 Facility Name: Oconee 1, 2, and 3 Inspection at: Oconee site near Seneca, South Carolina Inspection conducted: May 9 - 13,1983 Date of Last Physical Security Inspection Visit: January IC - 14, 1983 Type of Inspecti fi:

announced Ph sical Security Inspectors:

/

A MA/

[o /// M

. h(sf:aT 5ecurity Inspector

'Dite Yigned Pt

~

N.

fillma M

Y/f/f3

'

J.

n

, Ph sical Security Inspector Da'te Signed

@!/f!f/2 Approved by:

680 D. R. McGuire, Chief, Physical Security Section Dats S/igiied Safeguards Branch, Division of Emergency Preparedness and Materials Safety Programs Inspection Summary Area Inspected:

Included site orientation; review of security plan and implementing procedures; security organization-management; security organization personnel; security organization-response; records and reports; testing and maintenance; locks, keys, and combinations; physical barriers-protected area; physical barrier-vital areas; lighting; assessment aids; access control-personnel; access control packages; access control-vehicles; detection aids protected area; detection aids-vital areas; alarm stations; communications; general requirements for personnel; additional requirements for power reactor personnel; safeguards contingency plan implementation review; and physical protection safeguards information.

In addition, the I

inspectors reviewed the status of various security operational activities to determine the validity of several concerns relating to security force capa-bility and protection provided the Oconee Nuclear Station, expressed by an individual to Region II.

!*

(

RSS'il88R7 !S88sk ec"S

O PDR

.. _

_

_

.

SAFEGUARDS INFORMAT

.

.

.,

'

'The inspection involved 76 inspector hours on site by two NRC inspectors. - Ten -

inspection hours were accomplished during offshift periods.

'

Results: The licensee was found to be in compliance with NRC requirements

~

within the 23 areas examined during the inspection.

!

i U

!

l

l;

!

,

$.

!

i

!

I

ENCLOSURE COtnAM i

TION.

SATEGUARDS ItE0ml.A

!,

IS-U?C3 sg?ARATION D

.

SAFEGUARDS INFORMATlow L