g) blT)
,
- ~
fg
-
3'"
- ,,
UNITED STATES
-
[h[hhf
ATOMIC ENERGY COMMISSION g-Cj
,,
,
.
I DIVISloN OF COMPl. LANCE
]
k
.-g
'.I ej g
REGICH ll - SulTE 818 d
Oh
'
a
's,4til 4 p 230 PE ACHTREE STREET. N oR T H W E ST
p
- g ej,
AT LANT A. oEoRGI A 30303
'-
December 5, 1969 y
-
'
J. P. O'Reilly, Chief, Reactor Inspection and Enforcement Branch Division of Compliance, Headquarters DUKE POWER CE%0CONEE 1, 2 AND 3), LICENSE NOS. CPPR-33, 34 AND 35, DOCKET NO..
270 AND 287 The attached report of an inspection of the subject facility by our inspectors on November 3-5, 1969,'is forwarded for information. There were no items of nonconformance detected during the inspection.
A program has been developed by Bechtel for repairing the containment building liner plate laminations reported in CO Report No. 50-269/69-8.
This problem is considered resolved.
Two nonconformance items, detected during the previous inspection, involving welding procedure and welder qualification practices have been corrected.
With ' he arrival of the second Unit 1 steam generator scheduled for December t
and the Unit 1 reactor vessel scheduled for January 1970, the construction pace should pick up considerably within the next two or three months.
'
%
}
W. C. Seidl 00:II:WCS Senior Reactor Inspector Enclosure:
C0 Ept. Nos.. 50-269/69-9,270/69-8 and 287/69-8 (Murphy)
cc:
E. G. Case, DRS R. S. Boyd, DEL (2)
S. Levine, DRL (6)
D. J. Skovholt, DRL'(3)
L. Kornblith, Jr., CO'
R. W. Kirkman,~CO:I B. H. Grier, CO:III D. I. Walker, CO:IV R. W. Smith, CO:V (
lREOFig 8001030 7