IR 05000269/1968001

From kanterella
Jump to navigation Jump to search
Insp Repts 50-269/68-01,50-270/68-01 & 50-287/68-01 on 680201.No Nonconformance Noted.Major Areas Inspected: Placement of Containment Base Pad & Dam Const for Toxaway Project
ML19319A642
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 02/27/1968
From: Long F, Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), US ATOMIC ENERGY COMMISSION (AEC)
To:
Shared Package
ML19319A640 List:
References
50-269-68-01, 50-269-68-1, 50-270-68-01, 50-270-68-1, 50-287-68-01, 50-287-68-1, NUDOCS 7911180081
Download: ML19319A642 (4)


Text

,.

.-

/

... J

_

._ _. u

-

...

t

-

..

.

,

.

U. S. ATCMIC E!!ERGY CCMMISSION

REGION II

idv1MG C? CG+i i.:CE Rcrort of Inspection

---

C0 Report !!cs. 50-269/68-1 50-270/68-1 50-287/60-1 Licensco:

Dako Tower CeTpmiy

l,

.

Date of Inspecticn:

February 1, 1968

'I

'

.

Dato of Previcus Inspcction: N/A Inspected By:

.

L -4 (#<>M dc

  1. ['7/erf

'

,

i Willica C. Sci'dle, Reactor ~ 4cpector Date

/

n b

c:3.'~J~)~'. h '- ^ ~ M 7 '

2 A '/

,

%

!

Reviewed By:

,

%-

,

j F. J. Iong, Senior Reactor Incrector

' Date I

Pr'oprietary Information:

Ucno

SCOPE An anncunced visit was nado to the site of the threo 2568 Mwt pressuriced

'

water power reactors now under ccnstruction near Seneca, South Carolina.

The reactors are designated as Oconec "ucle:

Station Units 1, 2, and 3 i

!-

This visit was the initial contact mtdo betuven the Division of Complianco l

and the Duke Power Co. following the issuance of the Ccnstruction Por:aits.

The primary purposo of the visit was to review the Complianco inspection

{

program with Duke management.

i'

SW!GRY

.

'i Safety Items _ - Hono

'

i

'

norcmpi 4:mco Tt-s - !!cno Unrup1 0 cutrences - !!cno

'

st,tus of Provicusly Reported Problers_ - !!ot a.pplicablo

-

I

.

.

7911180 Oc/a

.

.

.

.

-

..

.

...

--

-

. - il

. -.~. ll L..

..

L.~

U

.-

..-

L

..

.

k..)

b.)

[~'. 3[

,

._2

.

Ct.Ler SiGnificant Ite.s - Tko Unit No.1 containment building base pad p16Fei~ent is in~~FFe~5Es; c.ucut l'jc0 cu.,ca. 1.ac bccn placed to date.

~

The intake cooling water pipe installation for this unit is 40% complete.

-.

.

The basic excavatica for Units No. 2 and 3 is ccmplete.

Construction of the two carth filled dams associated with the Toxaway '

, Project is in progress.

Vanar;crent Interview - A fonal interview was not held at the conclusion of the visit. Section B covers the Complianco progran 'te r.s 1 hich ucre

-

.

formally reviewed with Duko r.anagement, t

DMA114 I

I I

}

A.

Per.;ons Contacted I

I

!

The following Duko personnel were contacted:

i

,

(

Engineering

U. S. I4e, Vico President - Engineering

!

L. C. Dail, Princi;.21 Civil Engineer

)

'

-

S. B. Hager, Design Engineer

.

ccnntruction R. L. Dick, Project Manager J. C. Rogers, Project Enginocr J. Wells, Principal Field Engineer j

l B.

Comnliance Inspection Progran i

The inspector ccnducted a formal review of the inspection program with Lee, Dail, Hager, Dick, Rogers, and Wells. The following items were discussed:

,

'

!

The respcnsibility and authority of the Division of Compliance, i;

1.

the Region II office, and the reactor inspector,

,,

The relationship between DPL and the Division of Compliance.

2.

i

The typo and frcquency of inspection.

.

.

-*

  • '.

- *

.

.

.

.,,, -

.,

7..

O-T3

.... -.

.--

.O-

-

  1. .

..

.,s.

.....n-.

oc

...,-l-..--.--.

...

Es

.a L

'

.

U.

...

l (

~3 -

The scopo of the inspection progran during constrmtion.

Verdor visits.

Inspection methcds.

Management intervicus at conclusion of visit.

8.

Documentation of inspections and distributien of reports.

J.

Importanco of good cennunications.

'10.

The availability of D2L and the Divisicn of Ccnplianco to render

,

i assistance in certain regulatory ratters.

!

I C.

Duke Ccnstruction Organization

!

The key porconnel presently associated with reactor construction at

'

l the Duke sito aro interrelated as follows:

!,

.

,

i

!

l

!

!'

i

.

q, t

'.

e h

pl,'

.?

  • *

'

m_

_

,

-

a

. ?'

~

'

'

,

.p~

i

.

5.

j

<

.

,

.

Project Mgr.

.,_

,

R. L. Dick

'

,

,

,

,'

Project En v.

,

J. C. Rogers

' -

t

.:

E L7 Princ hs1 Field Engr.-

}.

y Job Suet..

J. R. Wolls I!ane not knoim

.Is

-

l;I

.y t-

-

Field Engr.-Office Field Engr.-Civil Field Engr. Mech.

Field Enct.-Eleet.

.y

'

. ~.

'

!

I Asst Field Engr.

Aest Field Engr.___

Asst Field Encr.

lAsstFieldEngr.

!

L. W. Freeze R. A. Doggs (Insp)

D. W. Smothers (Insp)

M

,

-i

~j Engr Aid (Draftsman)

Sunv. Tech.(Concrete)

Sunorvisor Tech (Welding)_

t R. A. '.Tnitaker R. B. McCrary J. T. Moore

.;

.j

l Inspectors Insceetors

.

i V

C.R. Baldwin (Placing).

Vacuum box Radiographs W.C.' Hughs (Batch Planta

'"

Placing)

Magna Flux

.

R.R. Grooms (Batch Plant)

Dyo Penetrant

u-

'!

Inseceto'r - Concrete Lsb H. J. Young ffi

'!

C.R.Baldwin i

e E

.

~

' M Fosition not filled.

'

.

...

-

,-

4_

_.

... _....

-

-

- - - -..

.. _ - _. _ __ _ _...

- - - -

1- - -

,

9,

~

---

.. _. _ _.

s.

  • ~

wmt wMradpa%

L a

_.

-

-

,

.I

-

a

" 11*

_...._ _ _;_ __. _ IJ --

--L-~..--

-.

l._,J

)*

D

....

...

(

-5-t>

.

Lee stated they are experiencing difficulty recruit.ing galified r:-ople to staff tho field engineer positions. However, he stated that before the $nspector's next visit in early March all positions should be filled and an organization chart published. The inspector vill review percennel

--

organization again during the next inspection with particular emphasis given to the personnel responsible for quality assuranco at the cito.

D.

Site Tour, The inspector ccccupanied Lee, Dick, Rogers and Wolls on a site orien-tation tour. Included in the tour was a visit to the concreto batch plant located about 9 niles from the cenatruction aite.

It was noted during the inspecticn of Unit.Uo.1 that the contairment buildind pad is being placed in coctions rather than in eno centinuous Three of seven cections in the first 5' lift havo been placed.

pour.

This reprocents a total of 1900 cu. yds, of concrete.

-

(

.

'

,

,

^