IR 05000267/1984023

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/84-23
ML20140E173
Person / Time
Site: Fort Saint Vrain 
Issue date: 12/28/1984
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Lee O
PUBLIC SERVICE CO. OF COLORADO
References
NUDOCS 8501100604
Download: ML20140E173 (1)


Text

DEC 2 81984 In Reply Refer To:

Docket. 50-267/84-23 Public Service Company of Colorado ATTN:

O. R. Lee, Vice President Electric Production P. O. Box 840 Denver, Colorado 80201 Gentlemen:

Thank you for your letter of November 16, 1984, in response to our letter and Notice of Violation dated October 24, 1984. We have reviewed your reply and fir.d it responsive to the concerns raised in our Notice of Violation. We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained.

Sincerely, Or$41ns1 Signed By 7.P. 35xbo Ox:

E. H. Johnson, Chi'ef Reactor Project Branch I cc:

-J. W. Gahm, Manager, Nuclear Production Division Fort St. Vrain Nuclear Station-16805 WCR 1915 Platteville, Colorado 80651 L. Singleton, Manager, Quality Assuranca Division (same address)

bec-Copy of letter maintained in RIV Security File and sent to:

DMB IE-04 R. Martin John G. Davis R. Bangart SSPB/NRC:NRR IE File Resident Inspector E. Haycraft, DRSP/LA

'

RPB1 RPB2 Section Chief (SP&ES)

R. Denise, DRS&P NMS&SB P. Wagner, RPB1 RIV File D. Powers, RPB1 COLORADO STATE DEPT. HEALTH (ltr head W

i PSSM NMS&

S&S PSA1 RPB1 i

RCa15kil/sm JEve t

RBan art forRIreland Johnson

  • /v /84-l' h [/

lv/

4/47/84 l

4 84 i g QG)

p

.

.

.