UNITED NUCLEAR REGULATORY REGION 475 ALLENDALE KING OF PRUSSIA, PA November 30, 2010 Mr. David A Heacock President and Chief Nuclear Officer Dominion Resources 5000 Dominion Blvd. Glen Allen, VA 23060-6711 MILLSTONE POWER STATION, UNITS 2 AND 3 --NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE -INSPECTION REPORT NOS. 05000336/2010502 AND 05000423/2010502

Dear Mr. Heacock:

On October 22, 2010, the US Nuclear Regulatory Commission (NRC) completed an inspection of the October 19, 2010. evaluated emergency preparedness exercise at your Millstone Power Station, Units 2 and 3, The enclosed inspection report documents the inspection results. which were discussed on October 22, 2010. with Mr. A J. Jordan. Millstone Site Vice President, and other members of your staff. The inspection examined activities conducted under }Iour license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection. no findings identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice." a copy of this letter and its enclosure and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS), ADAMS is accessible from the NRC Web site at (the Public Electronic Reading Room)

Sincerely,James M, Trapp. Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos, 50-336. 50-423 License Nos. DPR-65, NPF-49 NRC Inspection Reports 05000336/20'10502 and 05000423/2010502 cc w/encl: Distribution via UstServ Mr. David A. President and Chief Nuclear Dominion 5000 Dominion Glen Allen, VA MILLSTONE POWER STATION, UNITS 2 AND 3 -NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE INSPECTION REPORT NOS. 05000336/2010502 AND 05000423/2010502

Dear Mr. Heacock:

On October 22,2010, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the October 19, 2010, evaluated emergency preparedness exercise at your Millstone Power Station, Units 2 and 3, The enclosed inspection report documents the inspection results, which were discussed on October 22,2010, with Mr. A. J. Jordan, Millstone Site Vice President, and other members of your staff. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records. observed activities, and interviewed personnel. Based on the results of this inspection. no findings W!;lre identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).

Sincerely. IRA! James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. License Nos, DPR-65, NRC Inspection Reports 05000336/2010502 and 05000423/2010502 cc w/encl: Distribution via ListServ SUNSI Review Complete: JMT (Reviewer's Initials) ADAMS ACC#ML 103340357 DOCUMENT NAME: G:\DRS\Plant Support Branch 1\BARR\EP Ex10 Millstone\Millstone EP EX 2010 Report.docx After declaring this document "An Official Agency Record" it will be released to the Public. f t 1$ d . d"Icate In the box: ..C" = Copy Wit out attac hmen I "E" Copy With attachmen I "N" N;::o receive a copy 0 h' ocument, . h Venc osure tIenc osure =: o copy OFFICE RIIDRS I RI/DRP I RIIDRS I I I NAME SBarrlSTB DJackson/DEJ JTrapplJMT DATE 11/29/10 11/29/10 11/29110 OFFICIAL COPY Distribution w/encl: (via E-mail) W. Dean, RA (R10RAMAIL RESOURCE) M. Dapas, ORA (R10RAMAIL RESOURCE) D. Lew, DRP (R1DRPMAIL RESOURCE) J. Clifford, DRP (R1 DRPMAIL RESOURCE) D. Roberts, DRS (R1DRSMAIL RESOURCE) P. Wilson, DRS (R1DRSMAIL RESOURCE) D. Jackson, DRP T. Setzer, DRP D. Dodson, DRP S. Shaffer, DRP, SRI B. Haagensen, RI J. Krafty, DRP, Rl C. Kowalyshyn, AA J. Andersen, RI OEDO D. Bearde, DRS RidsNRRPM Millstone Resource RidsNRRDorlLpl1-2 Resource ROPreportsResource@nrc.gov R. Kahler, NSIRlEPD S. LaVie, NSIRlEPD J, Trapp, DRS S. Barr, DRS C.Crisden, DRS Docket Nos.: License Nos.: Report Nos.: Licensee: Facility: Location: Dates: Inspectors: Approved By: U.S. NUCLEAR REGULATORY REGION 50-336, DPR-65. 05000336/2010502 and Dominion Nuclear Connecticut, Millstone Nuclear Power Station, Units 2 and P.O. Box Waterford. CT October 18 -22, S. Barr. Sr. Emergency Preparedness Inspector, DRS, Region I (Lead) S. LaVie, Sr. Emergency Prep;9redness Specialist, NSIR J. Laughlin, Emergency Preparedness Specialist. NSIR C. Crisden, Emergency Preparedness Inspector, DRS. Region C. Douglas, Project Engineer, DRP, Region J. Hawkins, Project Engineer, DRP, Region James M. Trapp, Plant Support Branch Division of Reactor SUMMARY OF IR 05000336/2010502, 05000423/2010502; 10/18/20'10-10/22/2010; Millstone Power Station, Units 2 and 3; Emergency Preparedness Exercise Report. This was an announced inspection conducted by four region-based inspectors and two headquarters-based inspectors. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 4, dated December 2006. Cornerstone: Emergency Preparedness No findings were identified.

REPORT 1. REACTOR SAFETY Cornerstone: Emergency Preparedness (EP) 1EP1 Exercise Evaluation (71114.01 1 Sample) a. Inspection Scope Prior to the October 19, 2010, emergency preparedness exercise. the inspectors conducted an in-office review of the exercise objectives and scenario, submitted to the NRC by Dominion Nuclear Connecticut, Inc., to determine if the exercise would test major elements of the Millstone emergency plan as required by 10 CFR 50.47(b)(14). This overall exercise inspection activity repres':1nted the completion of one sample on a biennial cycle. The exercise evaluation consisted of the following review and assessment: The adequacy of Millstone's performance in the biennial full-participation exercise regarding the implementation of the risk-significant planning standards (RSPS) described in 10 CFR 50.47(b)(4), (5), (9), and (10), which are: emergency classification; offsite notification; radiological assessment; and, protective action recommendations, respectively. The overall adequacy of Millstone's emergency response facilities with regard to NUREG-0696, "Functional Criteria for Emergency Response Facilities," and Emergency Plan commitments. The facilities assessed were the Control Room Simulator, Operational Support Center (OSC), Technical Support Center (TSC), and Emergency Operations Facility (EOF). A review of other performance areas, such as: the emergency response organization's (ERO's) recognition of abnormal plant conditions; command and control; intra-and inter-facility communications; prioritization of mitigating activities; utilization of repair and field monitoring teams; interface with offsite agencies; staffing and procedure adequacy; and, thEl overall implementation of the emergency plan and its implementing procedures. A review of past performance issues from the last NRC exercise inspection report and Millstone's EP drill reports, to determine the effectiveness of licensee corrective actions as demonstrated during the October 19th exercise and to ensure compliance with 10 CFR 50.47(b)(14). The licensee's post-exercise critiques, to evaluate Dominion's self-assessment of its ERO performance during the October 19th exercise and to ensure compliance with 10 CFR 50, Appendix E, Section IV.F.2.g. The inspectors reviewed the documents listed in the attachment to this report.

b. Findings No findings were identified. 1 EP4 Emergency Action Level (EAL) and Emergency Plan Changes (71114.04 -1 Sample) a. Inspection Scope Since the last NRC inspection of this program area, Dominion implemented various changes to the Millstone Power Station Emergency Plan. Dominion determined that in accordance with 10 CFR 50. 54(q), the changes resulted in no decrease in effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR 50. The inspectors reviewed all EAL changes made since August 2009, and conducted a sampling review of other Emergency Plan changes, including changes to lower-tier emergency plan implementing procedures, to evaluate for any potential decreases in effectiveness of the Emergency Plan. However, this review was not documented in a Safety Evaluation Report and does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety. b. Findings No findings were identified. 4. OTHER ACTIVITIES (OA) 40A1 Performance Indicator (PI) Verification (71151 -3 Samples) a. Inspection Scope The inspectors reviewed data for the Millstone EP Pis, which are: (1) Drill and Exercise Performance (DEP); (2) Emergency Response Organization (ERO) Drill Participation; and, (3) Alert and Notification System (ANS) Reliability. The last EP inspection at Millstone was conducted in the third quarter of 2009, so the inspectors reviewed supporting documentation from EP drills and tests from third quarter 2009 through third quarter 2010 to verify the accuracy of the repol1ed PI data. The review of these Pis was conducted in accordance with NRC Inspection Procedure 71151, using the acceptance criteria documented in NEI 99-02, "Regulatory Assessment Performance Indicator Guidelines," Revision 6. This inspection activity represented the completion of three samples on an annual cycle. b. Findings No findings were identified.

3 40A6 Meetings, Including Exit On October 22,2010, the inspectors presented the results of this inspection to Mr. A. J. Jordan, Millstone Site Vice President, and other members of the Millstone staff. No proprietary information was provided to the inspectors during this inspection.

.... ... A-1 ATTACHMENT SUPPLEMENTAL IN FORMATION KEY POINTS OF CONTACT Licensee Personnel A. J. Jordan, Millstone Site Vice President D. Smith, Millstone Emergency Preparedness Manage:r LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None LIST OF DOCUMENTS REVIEWED Section 1 EP1: Exercise Evaluation Millstone Power Station Emergency Plan (Revision 41) Millstone Power Station Emergency Plan Implementing Procedures Millstone Power Station Emergency Plan Administrative Procedures Millstone Power Station October 19, 2010, Emergency Exercise Scenario Package Millstone Power Station Emergency Preparedness Drill Reports, January 2009 -September 2010 Condition Reports Submitted as a Result of the Exercise: CR399716, CR399726, CR399861, CR400033, CR400037, CR400167, CR402269, CR402274, CR402309, CR402860, CR403030, CR403034, CR403037, CR403039, CR403040, CR403041, CR403042 Section 1 EP4: Emergency Action Level and Emergency Plan Changes Millstone Power Station Emergency Plan (Revision 41) EP-AA-101, 10 CFR 50.54(q) Change Evaluation (Revision 1) EP-AA-303, Equipment Important to Emergency Response (Revision 1) MP-26-EPA-FAP01, Management Program for Maintaining Emergency Preparedness (Revision 6) MP-26-EPA-FAP04, Emergency Action Level Table Revision (Revision 1) MP-26-EPA-FAP06, Emergency Plan Change Process (Revision 4) 10 CFR 50.54(q) Screening Packages: MP-09-21, MP-09-23, MP-09-24, MP-09-25, MP-09-26, MP-10-01 through MP-10-39 Section 40A1: Performance Indicator EN-EP-201, Performance Indicators (Revision DNAP-2605, Emergency Preparedness Performance Indicators (Revision DEP PI data, July 2009 -October ERO Drill Participation PI data, July 2009 October ANS Reliability PI data, July 2009 -October A-2 LIST OF ACRONYMS ANS Alert Notification System CFR Code of Federal Regulations CR Condition Report DEP Drill and Exercise Performance EAL Emergency Action Level EOF Emergency Operations Facility EP Emergency Preparedness ERO Emergency Response Organization NEI Nuclear Energy Institute NRC Nuclear Regulatory Commission OSC Operations Support Center PI Performance Indicator RSPS Risk Significant Planning Standard TSC Technical Support Center