IR 05000224/1980001

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-224/80-01 on 800506-09.No Noncompliance Noted.Major Areas Inspected:Facility Organization,Logs & Records & Requalification Training
ML19320D208
Person / Time
Site: Berkeley Research Reactor
Issue date: 06/11/1980
From: Chaffee A, Faulkenberry B, Andrea Johnson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML19320D201 List:
References
50-224-80-01, 50-224-80-1, NUDOCS 8007210107
Download: ML19320D208 (5)


Text

.

'

V U. S. NUCLEAR REGUTATORY COMMISSION

,

OFFICE OF INSPECTION AND ENFORCEMENT

REGION V

Report No.

50-224/80-01 Docket No.

50-224 License No.

R-101 Safeguards Group Licensee:

University of California Berkeley, California 94720 Facility Name:

Berkeley Research Reactor (TRIGA Mark III)

Inspection at:

Berkeley, California Inspection conducted: /; May 6-9,1980 Inspectors:

v///

[,

A. Johnso', Reactor Inspector

/

Date signed (%. L.i gin /n A. Chaffee, Reactor Inspector

' Date Signed Date Signed Approved By: hb db d/////d

,/

B. H. 'Tatilkenberry, ChpefActors Project Date Signed Secetion 2, Reactor 0Ac;ations and Nuclear Support Branch Inspection on May 6-9,1980 (Report No. 50-224/80-01)

Areas Inspected:

Routine, unannounced inspection of facility organization, logs and records; requalification training; procedures; surveillance; logs and records; requalification training, procedures; surveillalce; review and

>

audit; experiments; and independent inspection. The inspection involved 24 inspector-hours onsite by two NRC inspectors.

Results: No items of noncompliance or deviations were identified.

RV Form 219 (2)

8007210107

.

-

.

.

DETAILS 1.

Persons Contacted

  • Professor S. Kaplan, Reactor Administrator
  • Dr. T. Lim, Reactor Supervisor
  • H. Braun, chm Reactor Operator J. Harrell, Supervisor, Electronics Shop G. Little, Reactrir Health Physicist
  • Denotes those attending the exit interview.

2.

Organization, Logs and Records The organization structure and personnel responsible for the operation and administration of the Berkeley Research Reactorwere unchanged from that previously reported.

Through discussions with licensee representatives and an examination of facility records,-the inspector found that the qualification levels,

_

authorities and responsibilities of licensee personnel, including members of the Reactor Hazards Committee, were consistent with the Technical Specification requirements and the Safety Analysis Report.

Facility operation and maintenance logs were examined and found to document the performance of operational and maintenance activities con-sistent with administrative requirements. The specific records examined were as follows:

a.

Maintenance Log b.

Operations Log Books c.

Daily Reactor Startup and Shutdown Checklist d.

Power " Pulse" Log No items of noncompliance or deviations were identified.

2.

Review and Audit The Rec.ctor Hazards Committee had met quarterly since the previous inspection. The approved minutes of the meetings held between February 22, 1979 and the date of the inspection were reviewed.

Changes to the facility design and to a facility procedure were found by the : inspector to have been completed consistent with the criteria of 10 CFR 50.59. The changes. reviewed were as follows:

a.

.

-2-a.-

. Design change - change rod position indication from electric-mechanical to L.E.D. readout.

b.

Design change - add battery as backup power supply for emergency alarm, c.

Procedure change - A statement was added to the second paragraph of Section 5.4.1 and on page 52 starting on line 18 of the Berkeley Research Emergency Plan.

During this inspection period, the Reactor Hazards Committee (RHC) had

reevaluated their audit program in light of the recently approved Technical Specifications.

Previously this audit function was satisfactorily concucted in two parts:

a.

The Reactor Health Physicist at the facility, who is an ex officio member of the RHC, whould conduct monthly log reviews.

b.-

Sporadically throughout the year, one or two independent audits were were done on a rotating basis by the other members of the RHC.

To conform more with the statement contained within the new Technical Specifications- (T.S. 6.2.c.), the above system of audits has been replaced with quarterly audits done on a rotating basis by the members of the RHC.

The inspector reviewed the RHC Charter and noted that the Charter needed to addrcss in more detail some aspects of RHC operations. The following areas were in question:

a.

Voting rules.

b.

Method of submission and content of presentation to the Committee.

-

.c.

Use of subcommittees (e.g., any use of subcomnittees for audits).

d.

Review,. approval, and dissemination of minutes.

The licensee agreed to evaluate those areas in question and expand the RHC Charter as appropriate.

No items of noncompliance or deviations were identified.

4.

Requalification Training

. A review of the facility records and personnel training files by

,

the inspector verified that the licensee had implemented the requali-

)

fication program for licensed operators consistentwith the program

.

...

-3-approved by the Division of' Reactor Licensing on November 4,1974.

The following operator licenses have become inactive or expired due to 'wk assignment conflicts or termination:

Dr. Ruby (License in-ac...e due to current work assignment), Mr. Lead (License inactive due to termination), Mr. Davis (License inactive due to termination),

Mr. Neely'(License expired due to termination), and Mr. Kaplan (License expired due to current work assignment).

No items of noncompliance or deviations were identified.

5.

Procedures Written instructions have remained essentially unchanged since the previous ~ inspection. The inspector directly observed an irradiation demonstration, and a shutdown of the reactor.

Facility procedures were adhered to during these activities and appeared to provide adequate technical guidance to safely perform the activities.

No items of noncompliance or deviations were identified.

6.

Surveillance The inspector selected the following periodic suveillance requirements of the Technical Specifications for review:

a.

Operability of all reactor control and position interlocks.

b.

Maximum allowable rod drop times, c.

Channel calibration.

d.

Minimum allowable reactor pool level.

e.

Rod worth mearurements.

f.

Shutdown margin calculations.

g.

Confirmation of reactor pulse characteristics.

The records which were used to substantiate the completion of these requirements were the "Research Reactor Monthly Inspection Checklist"

.

-....

.

.

-

-...

. - - -. -

~.-.-

...

,

'

.., ; ;

.

1:

-4-

'

,

for May 1979 - April 1980,' the Daily Startup. Checklist" for May -1979 -

,

.

~ April 1980 and other appropriate documentation. The inspector t -

observed that the' rod. drop times were being checked at less than a

-

second with reasonable certainly without the-use of any devise

'

. except personnel judgement. The licensee stated that use of a stop

.

l-

watch would be. evaluated.'

No items of noncompliance or deviations were identified.

i

.

~~

7..

Experiments

,

Experiments performed.since the previous. inspection were reviewed.

'

' Procedures for new experiments _(Nos. E.347-B through E 351-B) were

,

examined withMe following findings made by the inspector.

a.

-The procedures had been reviewed and approved as required for

-

Class A" or " Class B" experiments.'

l

.

h b '.

The experiments did not involve an unreviewed safety question.

c.

Potential hazards with' the experiments were clearly identified.

.

'

d..

'The approximate reactivity effect on the reactor was predicted

'

beforehand.

.

No. items of noncompliance or deviaticns were identified.

,

8.

Independent Inspection

+

I iThe inspectors conducted a tour of selected areas of the reactor

~

room. The following_ observations were made:

l a.

Control room operators were knowledgeable of plant operating

conditions and of experiments in progress. The control room was manned ia accordance with.the Technical Specifications.

L b.

. Plant housekeeping was adequate.

-c.-

Plant' equipment and systems appeared nonnal for the status of

,

-the plant.

'

'No items of-noncompliance.or. deviations wereLidentified.

-

!

9.-

Exit Inte'rview

The-inspectors met with licensee representatives (denoted in Paragraph 1)

'at the conclusion of the inspection on-May 9,-1980. The inspectors

~

'

suninarized:the scope and findings of the inspection.

,

.

E g

_

_

r

-

'

.

.

_

,.... --,

-,,

. -

.. - -,

-, - -

_.,.. --- ~...,. -...

-.