IR 05000186/2003202

From kanterella
Jump to navigation Jump to search
IR 05000186-03-202 on 04/09/2002 - 04/19/2002 for University of Missouri-Columbia Research Reactor Facility
ML031280097
Person / Time
Site: University of Missouri-Columbia
Issue date: 05/14/2003
From: Madden P
NRC/NRR/DRIP/RORP
To: Rhonda Butler
Univ of Missouri - Columbia
Bassett C, NRR/DRIP/RORP, 404-562-4899
References
IR-03-202
Download: ML031280097 (16)


Text

May 14, 2003

SUBJECT:

NRC INSPECTION REPORT NO. 50-186/2003-202

Dear Mr. Butler:

May 14, 2003

SUBJECT:

NRC INSPECTION REPORT NO. 50-186/2003-202

Dear Mr. Butler:

This letter refers to the inspection conducted on April 9 & 10, 2002, at your University of Missouri - Columbia Research Reactor facility. The inspection included a review of activities authorized for your facility. The enclosed report presents the results of that inspection.

Areas examined during the inspection are identified in the report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations of activities in progress. Based on the results of this inspection, no safety concerns or noncompliances of NRC requirements were identified.

No response to this letter is required.

In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at (the Public Electronic Reading Room) http://www.nrc.gov/reading-rm/adams.html.

Should you have any questions concerning this inspection, please contact Craig Bassett at 404-562-4712.

Sincerely,

/RA by Alexander Adams, Jr., Acting for/

Patrick M. Madden, Section Chief Research and Test Reactors Section Operating Reactor Improvements Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket No.: 50-186 License No.: R-103 Enclosure:

NRC Inspection Report No. 50-186/2003-202 cc w/enclosure: See next page DISTRIBUTION:

PUBLIC RORP/R&TR r/f AAdams CBassett WBeckner PDoyle TDragoun WEresian FGillespie SHolmes DHughes EHylton PIsaac PMadden MMendonca BDavis (Ltr only O5-A4)

NRR enforcement coordinator (Only for IRs with NOVs, O10-H14)

ACCESSION NO.: ML031280097 TEMPLATE #: NRR-106 OFFICE RORP:RI RORP:LA RORP:SC NAME CBassett:rdr EHylton PMadden DATE 05/ 14 /2003 05/ 14 /2003 05/ 14 /2003 C = COVER E = COVER & ENCLOSURE N = NO COPY OFFICIAL RECORD COPY

U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION Docket No.:

50-186 License No.:

R-103 Report No.:

50-186/2003-202 Licensee:

Curators of the University of Missouri - Columbia Facility:

University of Missouri - Columbia Research Reactor Location:

Research Park Columbia, Missouri Dates:

April 9 & 10, 2003 Inspector:

Craig Bassett Approved by:

Patrick M. Madden, Section Chief Research and Test Reactors Section Operating Reactor Improvements Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation

EXECUTIVE SUMMARY This routine, announced inspection included onsite review of various aspects of the licensees programs concerning radiation protection, material control and accounting, and transportation of radioactive material as they relate to the licensees 10 Megawatt, Class I Research Reactor.

The licensee's programs were directed toward the protection of public and facility worker health and safety and were in compliance with NRC requirements. No safety concerns or violations of regulatory requirements were identified.

Organization and Staffing



The licensee's organization and staffing remain in compliance with the requirements specified in the Technical Specifications Section 6.1.

Review and Audit Functions



Review and oversight functions required by the Technical Specifications Section 6.1 were acceptably completed by the Reactor Advisory Committee.



Annual reviews of the Radiation Protection Program were being completed by the licensee as required by 10 CFR Part 20.

Procedures



Licensee Health Physics procedures and changes thereto were being reviewed and approved by the Procedure Review Committee and the Reactor Advisory Committee, as required.

Health Physics



Surveys were completed and documented as outlined in the Annual Report.



Postings met regulatory requirements.



Personnel dosimetry was being worn as required and recorded doses were within the NRCs regulatory limits.



Radiation survey and monitoring equipment was being maintained and calibrated as required.



The Radiation Protection and ALARA Programs satisfied regulatory requirements.



Radiation protection training was generally acceptable.

Effluent and Environmental Monitoring



Effluent monitoring satisfied license and regulatory requirements and releases were within the specified regulatory and Technical Specifications limits.

Transportation of Radioactive Materials



Radioactive material was shipped in accordance with the applicable regulations.

Material Control and Accountability



Special Nuclear Materials were acceptably controlled and inventoried.

REPORT DETAILS Summary of Plant Status The University of Missouri - Columbia Research Reactor (MURR) continues to be operated in support of isotope production, gemstone irradiation, reactor operator training, and various types of research. During the inspection, the reactor was started-up and operated to support laboratory experiments and product irradiation.

1.

Organization and Staffing a.

Inspection Scope (Inspection Procedure [IP] 39745)

To verify that the staffing and organizational structure requirements were being met as specified in the Technical Specifications (TS), Section 6.1, Amendment No. 32, dated October 19, 2001, the inspector reviewed:

current MURR organizational structure

administrative controls and management responsibilities

staffing requirements for safe operation of the facility b.

Observations and Findings The organizational structure had not changed since the last inspection in the area of radiation protection (refer to NRC Inspection Report No. 50-186/2002-201). The position of MURR Facility Director had still not been filled since the former Director left in 2001. In the interim, the Chief Operating Officer is filling the position of Director. That has necessitated the appointment of an Interim Chief Operating Officer. Also, the person who had held the position of Reactor Manager had taken a six months leave of absence. Therefore, the position of Reactor Manager was being filled temporarily by the former Assistant Reactor Manager, Engineering. The people filling all the interim positions have worked at the facility for several, and in some cases many, years and are well qualified to assume the interim positions until the position of Facility Director is filled and the former Reactor Manager returns.

The organization and staffing at the facility, required for reactor operation, were as specified in the TS. Qualifications of the staff met TS requirements. Review of records verified that management responsibilities were discharged as required by TS and applicable procedures.

c.

Conclusions The organizational structure and staffing were consistent with Technical Specification requirements.

2.

Review and Audit Functions a.

Inspection Scope (IP 40745)

In order to verify that the licensee had established and conducted reviews and audits as required in the TS Section 6.1, the inspector reviewed:

Reactor Advisory Committee meeting minutes for the past year to date

Selected Subcommittee meeting minutes for the past year to date

Selected audits and reviews completed by various management and Health Physics (HP) personnel b.

Observations and Findings The inspector reviewed the meeting minutes of the Reactor Advisory Committee (RAC) and the minutes of the Reactor Safety Subcommittee from March 2002 to the present. The meeting minutes indicated that the committee met at the required frequency and that a quorum was present. The topics considered during the meetings were appropriate and as stipulated in the TS.

A subcommittee of the RAC or other designated persons, including HP personnel, conducted audits and reviews as required and the full RAC reviewed the results.

The inspector verified that the licensee had completed annual reviews of the Radiation Protection Program as required by 10 CFR Part 20. All aspects of the program had been reviewed and the entire program had been revised.

c.

Conclusions Review and oversight functions required by the TS were acceptably completed by the RAC. Annual reviews of the Radiation Protection Program were being completed by the licensee as required by 10 CFR Part 20.

3.

Health Physics a.

Inspection Scope (IP 83743)

The inspector reviewed the following to verify compliance with 10 CFR Part 20 and the applicable licensee TS requirements and procedures:

selected radiation and contamination survey records for the past year through March of 2003

radiological signs and posting in various laboratories, the basement, and in the Beam Port Floor area

MURR dosimetry records for 2001 through February of 2002

calibration and periodic check records for selected radiation survey and monitoring instruments

Radiation Work Permits documented on Form FM-17, Rev. 0, dated October 5, 2001

  • radiation protection training program records

MURR Radiation Protection Program Manual dated January 1, 2003

AP-HP-105, Radiation Work Permit, Rev. 1, dated August 23, 2002

AP-HP-117, MURR Training Program, Rev. 2, dated February 7, 2003

AP-HP-119, High Radiation Area Access, Rev. 0, dated February 7, 2003

IC-HP-300, Calibration - Radiation Survey Instruments, Rev. 1, dated March 17, 2003

IC-HP-331, Calibration - Tennelec LB-5100 Alpha/Beta, Rev. 0, dated April 2, 2003

RP-HP-100, Contamination Monitoring - Performing a Swipe, Rev. 1, dated March 17, 2003

SV-HP-119, Property Release, Rev. 0, dated February 12, 2002

MURR Center Security, Emergency, and Health Physics Indoctrination Booklet last updated 2002 The inspector also toured the licensee's facility, conducted a radiation survey in various areas of the Beam Port Floor and the basement, and witnessed the use of dosimetry and radiation monitoring equipment. Licensee personnel were interviewed as well.

b.

Observations and Findings (1)

Surveys Daily and monthly contamination and radiation surveys, outlined in the licensees Reactor Operations Annual Report for CY2002, were completed by HP staff members as required. Any contamination detected in concentrations above established action levels was noted and the area was decontaminated.

Results of the surveys were documented and posted at the entrances of the various areas surveyed so that facility workers would be knowledgeable of the radiological conditions that existed therein.

During the inspection the inspector conducted a radiation survey of selected areas throughout the Beam Port Floor and in the basement area. The radiation levels noted were similar to those listed on licensee survey maps of the areas and no anomalies were noted.

(2)

Postings and Notices Copies of current notices to workers were posted in appropriate areas in the facility. Radiological signs and survey maps were typically posted at the entrances to controlled areas. Other postings also showed the industrial hygiene hazards that were present in the areas as well. The copies of NRC Form-3 noted at the facility were the latest issue and were posted in various areas throughout the facility such as on the main bulletin board, in main hallways, and at the entrance to the Beam Port Floor area, as required by 10 CFR Part 19.

(3)

Dosimetry The inspector determined that the licensee uses optically stimulated luminescence dosimetry (SLD) for whole body monitoring and thermoluminescense dosimeters (finger rings) for extremity monitoring. The dosimetry is supplied and processed by a National Voluntary Laboratory Accreditation Program accredited vendor. An examination of the SLD results indicating radiological exposures at the facility for the past year showed that the highest occupational doses, as well as doses to the public, were within 10 CFR Part 20 limitations. The records showed that approximately half of the facility personnel received occupational exposures of only a few millirem above background. The highest annual whole body exposure received by a single individual for 2002 was approximately 1390 millirem. The highest annual extremity exposure for the past year was approximately 2700 millirem.

Through direct observation the inspector determined that dosimetry was acceptably used by facility and contractor personnel.

(4)

Radiation Monitoring Equipment Examination of selected radiation monitoring equipment indicated that the instruments had the acceptable up-to-date calibration sticker attached. The instrument calibration records indicated calibration of portable survey meters was typically completed by licensee staff personnel. However, some instruments were shipped to vendors for calibration. Calibration frequency met procedural requirements and records were maintained as required. Area Radiation Monitors and stack monitors were also being calibrated as required.

These monitors were also typically calibrated by licensee staff personnel.

(5)

Radiation Protection Program The licensees Radiation Protection and ALARA programs were established and described in the MURR Radiation Protection Program Manual dated January 1, 2003, and through the various HP procedures that had been reviewed and approved. The programs contained instructions concerning organization, training, monitoring, personnel responsibilities, audits, and maintaining doses ALARA. The programs, as established, appeared to be acceptable. The ALARA program provided guidance for keeping doses as low as reasonably achievable which was consistent with the guidance in 10 CFR Part 20.

(6)

Radiation Work Permit Program The inspector reviewed selected Radiation Work Permits (RWPs) that had been written and used during 2002 and this year to date as stipulated in AP-HP-105. It was noted that the controls specified in the RWPs were acceptable and applicable for the type of work being done. The RWPs had been initiated, reviewed, approved, and eventually terminated as required.

(7)

Radiation Protection Training The inspector reviewed the training given to MURR staff members, those who are not on staff but who are authorized to use the experimental facilities of the reactor, and visitors. The inspector also interviewed various individuals concerning the training they had received. All those interviewed were satisfied with the training received but some indicated that further training would be helpful. The training program was acceptable.

(8)

Facility Tours The inspector toured the Beam Port Floor area, selected support laboratories, and the basement area with licensee representatives on various occasions.

The inspector noted that facility radioactive material storage areas were properly posted. No unmarked radioactive material was noted. Radiation and High Radiation Areas were posted as required.

c.

Conclusions The inspector determined that the Radiation Protection and ALARA Programs, as implemented by the licensee, satisfied regulatory requirements because: 1) surveys were completed and documented acceptably to permit evaluation of the radiation hazards present; 2) postings met regulatory requirements; 3) personnel dosimetry was being worn as required and recorded doses were within the NRCs regulatory limits; 4) radiation survey and monitoring equipment was being maintained and calibrated as required; and 5) the radiation protection training program was acceptable.

4.

Effluent and Environmental Monitoring a.

Inspection Scope (IP 69004)

The inspector reviewed the following to verify compliance with the requirements of 10 CFR Part 20 and the TS Section 3.7:

the environmental monitoring program outlined through various procedures

annual effluent monitoring and environmental surveillance program reports

ALARA Review - Liquid Batch Release Review Forms for 2002

ALARA Review - Monthly Airborne Effluent Review Forms for 2002

MURR Reactor Operations Annual Report for CY 2002

counting and analysis records contained in the HP Computer Folder Environmental Reports

IC-HP-319, Calibration - NMC Model RAK - Particulate Channel, Rev. 0, dated March 4, 2002

IC-HP-320, Calibration - NMC Model RAK - Iodine Channel, Rev. 0, dated March 4, 2002

IC-HP-321, Calibration - NMC Model RAK - Gas Channel, Rev. 0, dated March 4, 2002

  • OP-HP-221, Environmental Sample - Analysis, Rev. 0, dated February 25, 2002

OP-HP-353, Waste Tank Sample - Analysis, Rev. 0, dated February 25, 2002

SV-HP-110, Environmental Sampling, Rev. 1, dated February 21, 2003 b.

Observation and Findings The inspector determined that gaseous releases continued to be monitored as required, were acceptably documented, and were within the annual dose constraints of 10 CFR 20.1101 (d), Appendix B concentrations, and TS Section 3.7 limits. The liquid releases from the facility to the sanitary sewer were within the limits specified in 10 CFR 20, Appendix B, Table 3. The above results were acceptably reported in the Reactor Operations Annual Report for CY 2002.

c.

Conclusion Effluent monitoring satisfied license and regulatory requirements and releases were within the specified regulatory and TS limits.

5.

Transportation a.

Inspection Scope (IP 86740)

To verify compliance with regulatory and procedural requirements for transferring/shipping licensed radioactive material, the inspector reviewed the following:

selected records of various types of radioactive material shipments

AP-SH-001, Radioactive Materials Shipping, Rev. 0, dated November 9, 2001

SP-SH-004, Packaging Shipment of Type A, Non-Waste Radioactive Material, Rev. 1, dated June 6, 2002 The inspector interviewed licensee personnel involved with shipping as well.

b.

Observations and Findings Through records review and discussions with licensee personnel, the inspector determined that the licensee had shipped spent fuel and other types of radioactive material since the previous inspection in this area. The records indicated that the radioisotope types and quantities were calculated and dose rates measured as required. All radioactive material shipment records reviewed by the inspector had been completed in accordance with Department of Transportation and NRC regulations.

c.

Conclusions Radioactive material was shipped in accordance with the applicable regulations.

6.

Material Control and Accounting a.

Inspection Scope (IP 85102)

To verify compliance with 10 CFR Part 70, the inspector reviewed:

nuclear material storage locations

Special Nuclear Material (SNM) monthly and semi-annual inventory results

accountability records (DOE/NRC Forms 741 and 742) for the past year b.

Observations and Findings The material control and accountability program tracked locations and content of SNM the licensee possessed at the facility. The items tracked included fuel elements, in-core flux probes, fission counters, neutron detectors, fuel plates, fuel pellets, fission plates, Plutonium filters, Uranium phase shifters, fuel solution vials, UO2 foils, Nucleopore punchings, Nucleopore plates, and fission chambers and detectors. The inventory of material was verified to be consistent with material accountability records. Possession and use of SNM were limited to the locations and purposes authorized under the license. The material control and accountability forms (DOE/NRC Forms 741 and 742) for the two previous accounting periods had been prepared and transmitted as required and within the time period specified.

The inspector toured the facility, including the fuel storage vault, and verified that the licensee was using and storing SNM in the designated areas. An inventory of the unirradiated fuel elements and other items in storage during the inspection demonstrated that the fuel was present and in the location specified.

c.

Conclusions Special Nuclear Material was acceptably controlled and inventoried.

7.

Follow-up on Previous Inspection Items a.

Inspection Scope The inspector reviewed the licensee's actions taken in response to previously identified Inspector Follow-up Items.

b.

Observation and Findings (1)

IFI 50-186/2002-201-01 During an inspection in April 2002, the inspector determined that certain groups of individuals at the facility, including reactor operators, HP personnel, and those involved with shipping radioactive material, typically received from 500 to 1650 millirem annually. Although the doses received were below the NRC limits, the licensee was informed that this was an area for improvement

and the issue of management and staff being more ALARA-conscious and developing ways to reduce personnel doses was identified as an Inspector Follow-up Item (IFI).

During this inspection the inspector noted that the licensee had taken various actions concerning this issue. In addition to training, the licensee had developed a program whereby each different organizational group at the facility was asked to review the total exposure for the group during the past three years, take an average of those totals, and set a goal which was ninety-five percent (95%) of that average. The exposure trend during the past two years for the facility and for most groups has generally been downward. Also, the Manager of Health Physics reviews each groups monthly total exposure during monthly management meetings.

Because the licensee had implemented the aforementioned actions, which apparently resulted in a decrease in personnel exposure, this item is considered closed.

(2)

IFI 50-186/2002-201-02 During the inspection in April 2002, the inspector also noted that the annual Radiation Worker refresher training, typically given to staff members every fall (usually in September), had not been completed for 2001. The licensee indicated that the refresher training, generally referred to as Rad Worker training, had been postponed because other high priority training had been conducted during that period. The other training included an emphasis on Safety Conscious Work Environment training that had been provided for everyone on staff.

The licensee had subsequently provided Rad Worker training during the fall of 2002. In addition, it was noted that each individual is required to review the licensee-provided MURR Center Security, Emergency, and Health Physics Indoctrination Booklet and take a brief test on its contents. (The booklet provides general radiation protection information, as well as information on security and emergency procedures.)

The inspector verified that the aforementioned actions had been taken by the licensee. The inspector also interviewed various licensee personnel and determined that they considered the training adequate. The licensee was encouraged to provide Rad Worker training annually. This item is considered closed.

c.

Conclusions Two Inspector Follow-up Items identified during a previous inspection were reviewed and closed during this inspection.

8.

Exit Interview The inspection scope and results were summarized on April 10, 2003, with members of licensee management and staff. The inspector described the areas inspected and discussed in detail the inspection findings. No dissenting comments were received from the licensee.

PARTIAL LIST OF PERSONS CONTACTED Licensee C. Allen, Quality Unit Manager K. Brooks, Interim Associate Director, Product and Service Operations R. Butler, Interim Director of MURR A. Coria, Training Coordinator M. Dixon, Assistant Reactor Manger, Operations R. Dobey, Manager, Health Physics J. Ernst, Associate Director, Regulatory Assurance Group L. Foyto, Acting Reactor Manager J. Hemphill, Health Physicist K. Kutikkad, Assistant Reactor Manager, Physics S. Meier, Manager, Radioactive Materials Shipping W. Meyer, Interim Chief Operation Officer W. Oladiran, Manager, Facility Support Operations INSPECTION PROCEDURES USED IP 39745 Class 1 Research Reactors Organization, Operations, and Maintenance Activities IP 40745 Class 1 Research Reactors Review and Audit and Design Change Functions IP 69004 Class 1 Research Reactor Environmental Protection IP 83743 Class 1 Research Reactor Health Physics IP 85102 Material Control and Accounting - Reactors IP 86740 Inspection of Transportation Activities ITEMS OPENED, CLOSED, AND DISCUSSED Opened None Closed 50-186/2002-201-01 IFI Follow-up on the issue of licensee management and staff personnel being more ALARA-conscious and developing ways to reduce personnel exposure.

50-186/2002-201-02 IFI Follow-up on the issue of annual Rad Worker refresher training being provided for facility personnel.

LIST OF ACRONYMS USED ALARA As low as reasonably achievable CFR Code of Federal Regulations HP Health physics IFI Inspector Follow-up Item IP Inspection Procedure MURR University of Missouri - Columbia Research Reactor NRC Nuclear Regulatory Commission PDR Public Document Room RAC Reactor Advisory Committee SNM Special Nuclear Material TS Technical Specification