MONTHYEARML20195H8991998-11-16016 November 1998 Insp Rept 50-184/98-202 on 981006-07.No Violations Noted. Major Areas Inspected:Mgt Response to non-safety Related Leak IR 05000184/19972021998-01-16016 January 1998 Insp Rept 50-184/97-202 on 971006-09.No Violations Noted. Major Areas Inspected:Program for Physical Protection of Spent Fuel IR 05000184/19972011997-07-11011 July 1997 Insp Rept 50-184/97-201 on 970616-18.No Violations Noted. Major Areas Inspected:Requalification Training of Operators, Updated Safety Sys Electrical Drawings & Review Proposed Neutron Beam Experiments IR 05000184/19960031996-12-30030 December 1996 Insp Rept 50-184/96-03 on 961105-08.No Violations Noted. Major Areas Inspected:Licensee Mgt Oversight & Control, Organizational Manning,Staff Qualifications & Facility Maint IR 05000184/19920021992-12-22022 December 1992 Insp Rept 50-184/92-02 on 921208-09.No Safety Concerns or Violations Noted.Major Areas Inspected:Physical Security, Organization & Operation,Shipping & Receiving,Storage & Internal Controls & Fixed Site Physical Protection Measures IR 05000184/19900031990-07-18018 July 1990 Insp Rept 50-184/90-03 on 900605-07 & 26.No Violations or Deviations Noted.Major Areas Inspected:Radiological Controls Program Onsite IR 05000184/19880021988-09-13013 September 1988 Insp Rept 50-184/88-02 on 880809-11.No Violations Identified.Major Areas Inspected:Review of Radiation Protection Program Including Determination of Implementation of Radiological Safety & Surveillance Program IR 05000184/19870031987-11-0303 November 1987 Emergency Preparedness Insp Rept 50-184/87-03 on 870908-11. No Violations Noted.Major Areas Inspected:Facility Operations,Notifications,Communications Equipment & Training IR 05000184/19870021987-08-25025 August 1987 Insp Rept 50-184/87-02 on 870706-09.No Violations Noted. Major Areas Inspected:Organization & Staffing,Training, Surveys,Dosimetry,Posting,Audits,Instrument Calibr,Records of Personnel Exposure & Environ Program Measurements IR 05000184/19870011987-06-30030 June 1987 Insp Rept 50-184/87-01 on 870514-15.No Violations Noted. Major Areas Inspected:Nuclear Matl Control & Accounting & Physical Security,Including,Organization & Operation, Shipping & Receiving & Storage & Internal Controls IR 05000184/19860011986-07-18018 July 1986 Insp Repts 50-184/86-01 & 70-0398/86-03 on 860625-26.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Program,Including Mgt Organization & Controls & Effluent & Environ Monitoring IR 05000184/19850041986-01-0303 January 1986 Insp Rept 50-184/85-04 on 851031.No Noncompliance Noted. Major Areas Inspected:Matl Control & Accounting,Including Organization & Operation,Measurements & Controls,Inventory & Records & Repts IR 05000184/19850031985-09-18018 September 1985 Insp Rept 50-184/85-03 on 850905-06.No Violations or Deviations Noted.Major Areas Inspected:Licensee Organization,Logs & Records,Reviews & Audits,Equipment Condition,Experiments & Surveillance Activities IR 05000184/19850021985-05-0909 May 1985 Physical Protection Insp Rept 50-184/85-02 on 850423.No Violation Noted.Major Areas Inspected:Physical Protection Measures for Protecting SNM of Moderate Strategic Significance IR 05000184/19780051978-09-12012 September 1978 IE Inspec Rept 50-184/78-05 on 780822-24 During Which 1 Item of Noncompliance Was Noted:Using Outdated Surveillance Test Procedures IR 05000184/19780041978-08-0707 August 1978 IE Inspec Rept 50-184/78-04 on 780706,-11 & -13, During Which 1 Item of Noncompliance Was Noted:Air Flow Rate in Fume Hoods C001-2 Was Too Long 1998-11-16
[Table view] Category:NRC-GENERATED
MONTHYEARML20195H8991998-11-16016 November 1998 Insp Rept 50-184/98-202 on 981006-07.No Violations Noted. Major Areas Inspected:Mgt Response to non-safety Related Leak IR 05000184/19972021998-01-16016 January 1998 Insp Rept 50-184/97-202 on 971006-09.No Violations Noted. Major Areas Inspected:Program for Physical Protection of Spent Fuel IR 05000184/19972011997-07-11011 July 1997 Insp Rept 50-184/97-201 on 970616-18.No Violations Noted. Major Areas Inspected:Requalification Training of Operators, Updated Safety Sys Electrical Drawings & Review Proposed Neutron Beam Experiments IR 05000184/19960031996-12-30030 December 1996 Insp Rept 50-184/96-03 on 961105-08.No Violations Noted. Major Areas Inspected:Licensee Mgt Oversight & Control, Organizational Manning,Staff Qualifications & Facility Maint IR 05000184/19920021992-12-22022 December 1992 Insp Rept 50-184/92-02 on 921208-09.No Safety Concerns or Violations Noted.Major Areas Inspected:Physical Security, Organization & Operation,Shipping & Receiving,Storage & Internal Controls & Fixed Site Physical Protection Measures IR 05000184/19900031990-07-18018 July 1990 Insp Rept 50-184/90-03 on 900605-07 & 26.No Violations or Deviations Noted.Major Areas Inspected:Radiological Controls Program Onsite IR 05000184/19880021988-09-13013 September 1988 Insp Rept 50-184/88-02 on 880809-11.No Violations Identified.Major Areas Inspected:Review of Radiation Protection Program Including Determination of Implementation of Radiological Safety & Surveillance Program IR 05000184/19870031987-11-0303 November 1987 Emergency Preparedness Insp Rept 50-184/87-03 on 870908-11. No Violations Noted.Major Areas Inspected:Facility Operations,Notifications,Communications Equipment & Training IR 05000184/19870021987-08-25025 August 1987 Insp Rept 50-184/87-02 on 870706-09.No Violations Noted. Major Areas Inspected:Organization & Staffing,Training, Surveys,Dosimetry,Posting,Audits,Instrument Calibr,Records of Personnel Exposure & Environ Program Measurements IR 05000184/19870011987-06-30030 June 1987 Insp Rept 50-184/87-01 on 870514-15.No Violations Noted. Major Areas Inspected:Nuclear Matl Control & Accounting & Physical Security,Including,Organization & Operation, Shipping & Receiving & Storage & Internal Controls IR 05000184/19860011986-07-18018 July 1986 Insp Repts 50-184/86-01 & 70-0398/86-03 on 860625-26.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Program,Including Mgt Organization & Controls & Effluent & Environ Monitoring IR 05000184/19850041986-01-0303 January 1986 Insp Rept 50-184/85-04 on 851031.No Noncompliance Noted. Major Areas Inspected:Matl Control & Accounting,Including Organization & Operation,Measurements & Controls,Inventory & Records & Repts IR 05000184/19850031985-09-18018 September 1985 Insp Rept 50-184/85-03 on 850905-06.No Violations or Deviations Noted.Major Areas Inspected:Licensee Organization,Logs & Records,Reviews & Audits,Equipment Condition,Experiments & Surveillance Activities IR 05000184/19850021985-05-0909 May 1985 Physical Protection Insp Rept 50-184/85-02 on 850423.No Violation Noted.Major Areas Inspected:Physical Protection Measures for Protecting SNM of Moderate Strategic Significance IR 05000184/19780051978-09-12012 September 1978 IE Inspec Rept 50-184/78-05 on 780822-24 During Which 1 Item of Noncompliance Was Noted:Using Outdated Surveillance Test Procedures IR 05000184/19780041978-08-0707 August 1978 IE Inspec Rept 50-184/78-04 on 780706,-11 & -13, During Which 1 Item of Noncompliance Was Noted:Air Flow Rate in Fume Hoods C001-2 Was Too Long 1998-11-16
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARML20195H8991998-11-16016 November 1998 Insp Rept 50-184/98-202 on 981006-07.No Violations Noted. Major Areas Inspected:Mgt Response to non-safety Related Leak IR 05000184/19972021998-01-16016 January 1998 Insp Rept 50-184/97-202 on 971006-09.No Violations Noted. Major Areas Inspected:Program for Physical Protection of Spent Fuel IR 05000184/19972011997-07-11011 July 1997 Insp Rept 50-184/97-201 on 970616-18.No Violations Noted. Major Areas Inspected:Requalification Training of Operators, Updated Safety Sys Electrical Drawings & Review Proposed Neutron Beam Experiments IR 05000184/19960031996-12-30030 December 1996 Insp Rept 50-184/96-03 on 961105-08.No Violations Noted. Major Areas Inspected:Licensee Mgt Oversight & Control, Organizational Manning,Staff Qualifications & Facility Maint ML20056E4431993-07-26026 July 1993 Exam Rept 50-184/OL-93-01 on 930713.Exam Results:Applicant Passed Both Portions of Licensing Exam IR 05000184/19920021992-12-22022 December 1992 Insp Rept 50-184/92-02 on 921208-09.No Safety Concerns or Violations Noted.Major Areas Inspected:Physical Security, Organization & Operation,Shipping & Receiving,Storage & Internal Controls & Fixed Site Physical Protection Measures IR 05000184/19900031990-07-18018 July 1990 Insp Rept 50-184/90-03 on 900605-07 & 26.No Violations or Deviations Noted.Major Areas Inspected:Radiological Controls Program Onsite IR 05000184/19880021988-09-13013 September 1988 Insp Rept 50-184/88-02 on 880809-11.No Violations Identified.Major Areas Inspected:Review of Radiation Protection Program Including Determination of Implementation of Radiological Safety & Surveillance Program IR 05000184/19880011988-07-22022 July 1988 Exam Rept 50-184/88-01OL on 880606-07.Exam Results:One Senior Reactor Operator Passed Written & Operating Exam. Related Info Encl IR 05000184/19870031987-11-0303 November 1987 Emergency Preparedness Insp Rept 50-184/87-03 on 870908-11. No Violations Noted.Major Areas Inspected:Facility Operations,Notifications,Communications Equipment & Training IR 05000184/19870021987-08-25025 August 1987 Insp Rept 50-184/87-02 on 870706-09.No Violations Noted. Major Areas Inspected:Organization & Staffing,Training, Surveys,Dosimetry,Posting,Audits,Instrument Calibr,Records of Personnel Exposure & Environ Program Measurements IR 05000184/19870011987-06-30030 June 1987 Insp Rept 50-184/87-01 on 870514-15.No Violations Noted. Major Areas Inspected:Nuclear Matl Control & Accounting & Physical Security,Including,Organization & Operation, Shipping & Receiving & Storage & Internal Controls IR 05000184/19860021986-10-30030 October 1986 Exam Rept 50-184/86-02 on 861001-02.Exam Results:Both Candidates Passed All Portions of Exam IR 05000184/19860011986-07-18018 July 1986 Insp Repts 50-184/86-01 & 70-0398/86-03 on 860625-26.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Program,Including Mgt Organization & Controls & Effluent & Environ Monitoring IR 05000184/19850041986-01-0303 January 1986 Insp Rept 50-184/85-04 on 851031.No Noncompliance Noted. Major Areas Inspected:Matl Control & Accounting,Including Organization & Operation,Measurements & Controls,Inventory & Records & Repts IR 05000184/19850031985-09-18018 September 1985 Insp Rept 50-184/85-03 on 850905-06.No Violations or Deviations Noted.Major Areas Inspected:Licensee Organization,Logs & Records,Reviews & Audits,Equipment Condition,Experiments & Surveillance Activities IR 05000184/19850021985-05-0909 May 1985 Physical Protection Insp Rept 50-184/85-02 on 850423.No Violation Noted.Major Areas Inspected:Physical Protection Measures for Protecting SNM of Moderate Strategic Significance IR 05000184/19780051978-09-12012 September 1978 IE Inspec Rept 50-184/78-05 on 780822-24 During Which 1 Item of Noncompliance Was Noted:Using Outdated Surveillance Test Procedures IR 05000184/19780041978-08-0707 August 1978 IE Inspec Rept 50-184/78-04 on 780706,-11 & -13, During Which 1 Item of Noncompliance Was Noted:Air Flow Rate in Fume Hoods C001-2 Was Too Long ML20249A8511977-05-19019 May 1977 PNS-77-023:on 770518,bomb Threat Was Received at Natl Bureau of Std Central Switchboard.Bureau & Facility Were Searched W/Negative Results.Fbi & State of MD Informed 1998-11-16
[Table view] |
Text
. _ . _ _ _ _ _ _ _ _ _
- .;
si I, U.S. NUCLEAR REGULATORY COMMISSION 'l l REGION I Report N /87-01 Docket N .
i License N TR-5 Safeguards Group II Licensee: U. S. Department of Commerce National Bureau of Standards Washington,-D. C. 20234 Facility Name: National Bureau of Standards Inspection At: Gaithersburg, Maryland Inspection Conducted: May 14 and 15, 1987 Type of Inspection:
Unannounced, Material Control, Accounting and Physical Security Inspectors: M S // [ N K c -o f-p 7 A. Della Ratt6 Safeguards Auditor date 0 rY % a a,.s 6-30- 77-C. M.~Schulingkamp l' date Physical Security I s ter-Approved by: *
_ sew th 5'3e //
,A R. Keimig, Chief date Safeguards Section, D Inspection Summary:
Inspection on May 14 and 15, 1987 (Report No. 50-184/87-01)
Areas Inspected: Nuclear material control and accounting, and physical security,. including: organization and operation; shipping and receiving; storage and internal controls; inventory; records and reports; and, fixed site physical protection measures for special nuclear material of moderate strategic signifir:anc !
Results: The licensee was in compliance with NRC requirements in the areas inspecte .
8707200039 870707 PDR ADOCK 05000104 G ppg i
-____-_-_a
_ _ _ _ _ _ _ _ _ - - _
a
.,;.
Details Key Persons Contacted
- S. Carter, Chief, Reactor Radiation Division
- T. Raby, Chief, Reactor Operations
- J. Torrence, Deputy Chief, Reactor Operations T. Shackelford, Captain, Physical Security J. Roundtree, Lieutenant, Physical Security
- present at exit interview 2. Material Control and Accounting Organization and Operation The inspectors verified through a review of licensee records that ;
the licensee maintained written procedures for nuclear material control and accounting and that written statements of responsibility and authority existed for those positions with responsibility for special nuclear material (SNM). Shipping and Receiving The inspectors determined through a review of licensee rccords that the licensee maintained procedures to assure that all nuclear material shipped or received was accurately accounted fo A review was performed of all DCE/NRC Form -741's generated during the-period October 1, 1985 through March 31, 1987 to assure that each was properly signed, dispatched in a timely manner, and that the data were accurate. No discrepancies were note Storage and Internal Control The inspectors determined through observations and reviews of records that the licensee was maintaining a system of storage and internal J control which provided knowledge of the quantity, identity, and j current location of all SNM within the facilit j i
Storage areas were maintained which included the reactor core, fuel pool, and new fuel storage vaul I Inventory The inspectors performed an inventory verification on May 15, 1987 which consisted of a piece count of all the irradiated fuel elements, irradiated sectioned elements, and new fuel elements and a comparison of the fuel location history card file with the core loading and fuel pool ma I
___-_______ _ A
- _ _ _ __ _ __ _- _ _ _ _ _
d'
.'
The results of the inspectors' independent inventory verification are indicated below. These results agreed with the licensee's inventor Location Fuel Elements l
Fuel Pool: ;
Whole 12 '
Sectioned 132 1/
~~
New Fuel Storage 5 Reactor 30
.
TOTAL 179
-
1/ These 132 elements were sectioned into 264 pieces containing SN The inspectors noted that the licensee's records documented only the !
date that a physical inventory of the fuel elements had been !
conducted. There was no summary of the results of each physica inventory that indicated, by location, the total number of fuel elements and reconciliation to the fuel element history cards. The inspectors advised the licensee that, in the future, documentation of physical inventories should include that information to provide evidence that a physical inventory was actually conducte Records and Reports I The inspectors reviewed the licensee's records, reports and source data. All Material Balance Reports (DOE /NRC Form-742), submitted by the licensee for the period October 1, 1985 to March 31, 1987, were reviewed as were all Nuclear Material Transaction Reports (DOE /NRC Form-741) to verify compliance with 10 CFR 70.53 and 70.54 respectivel Total uranium and uranium-235 depletion records were also reviewed. No discrepancies were note Attached to this report as Exhibit I is a summary of the licensee's SNM activity for the period October 1, 1985 through March 31, 198 . Fixed Site Physical Protection of Special Nuclear Material of Moderate Strategic Significance The inspectors reviewed the licensee's NRC-approved physical security plan and found that the licensee was protecting special nuclear material in
,
l l conformance with the plan commitments. The physical security plan met the '
general performance requirements and objective of the governing regulation ~
<
- _ _ _ - _ _ _ _ _
,,
.;
3 Exit Interview The inspectors met with the licensee representatives (denoted in paragraph 1) on May 15, 1987, and summarized the scope and findings of the inspectio At no time during this inspection was written material provided to the licensee by the inspectors.
l l
l
.
- - - - - - - - - - - _ - - - - - _ - - - - - - . - - - - - - - - - - - - - - - - - - . - - - - - - - - - - - - - - - - . - . ------
- - - - - - - - - - - - - - - - - - --
. . _ _ - _ _ _ . __ _ - _ _ _ _ _ _ ._ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
r
.
.
.,
EXHIBIT I National Bureau of Standards Docket No. 50-184 License No. TR-5 Material Balance for Period: October 1, 1985 - March 31, 1987 Reporting Identification Symbol: YVA Reporting Unit: Grams Enriched Uranium Element Isotope Beginning Inventory:
(October 1, 1985) 30,113 22,642 Receipts: 18,348 17,091 Material to Account For: 48,461' 39,733 Removals:
Shipments: -0- -0-Fission and Transmutation: 8,803 10,337 Ending Inventory:
(March 31, 1987) 39,658 29,396 Material Accounted For: 48,461 39,733
!
l
_ __ _=__---. _ l