IE Inspec Rept 50-161/78-25 on 781017-19 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Lics Physical Protec Prog as Implemented by Approved Security Plan
ML14175A991
Person / Time
Site: Robinson, 05000161 Duke Energy icon.png
Issue date: 11/01/1978
From: Chon Davis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML14175A990 List:
References
50-261-78-25, NUDOCS 7812060293
Download: ML14175A991 (3)


Text

REGUt UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA STREET, NA <n ATLANTA, GEORGIA 30303 Report No.:

50-261/78-25 Docket No.:

50-261 License No.:

DPR-23 Category:

C Licensee:

Carolina Power and Light Company 336 Fayetteville Street Raleigh, North Carolina 27602 Facility Name: H. B. Robinson 2 Inspection at: Hartsville, South Carolina I nspection Conducted:

October 17-19, 1978 Inspector:

C. L. Davis Reviewed by:

,

Q

,

I I F.P. Gillespie, hief Date Security and Investigation Section Safeguards Branch Inspection Summary Inspection on October 17-19, 1978 (Report No. 50-261/78-25)

Areas Inspected:

Unannounced security inspection of the licensee's physical protection program as implemented by their approved security plan and portions of 10 CFR Part 73 that were required to be implemented by May 25, 197 The inspection involved 14' inspector hours on-site by one NRC inspector during regular hour Results:

Of the areas inspected no items of noncompliance were foun.

RII Rpt. No. 50-261/78-25 I-1 DETAILS I Prepared by:

C. L. Davis, Physical Security Inspector Date Security and Investigation Section Safiguards Branch Dates of Inspection:

Octbe, 17-19, 1978 Reviewed by: _

L/ 2__

_IT. Gillespie, hief Security and Investigation Section Safeguards Branch Persons Contacted

  • W. Traylor, Administrative Superintendent (Acting Plant Manager)
  • L. Williams, Security Specialist
  • F. Bishop, Plant Electrical Engineer
  • E. Steen, Chief of Security Members of Burns International Security Service were also interviewe *Denotes those present at exit intervie.

Licensee Action on Previous Inspection Findings (Closed) Noncompliance (50-261/78-14):

Failure to search hand carried packages prior to entry into the protected are The inspector observed personnel entry into the protected area and found that all hand carried packages were being searche.

Physical Security Plan The licensee is operating under CP&L, H. B. Robinson Steam Electric Plant, Industrial Security Plan, Revision 4, dated April 7, 197 Revision 5 is being reviewed by NR.

Security Organization The inspector reviewed guard qualification, requalification and physical records for approximately 45% of the armed response forc No dis crepancies were found in requalification or annual medical physical Through a review of personnel, payroll, and training records the inspector was unable to verify that two guards had received the required 120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> for initial qualificatio Payroll records indicated that the two guards in question had received 112 hours0.0013 days <br />0.0311 hours <br />1.851852e-4 weeks <br />4.2616e-5 months <br /> initial trainin A licensee representative indicated that most probably the other eight hours were included as on-the-joh-training, which is not listed on the payroll record as training per se, as is classroom trainin.

RhI Rpt. No. 50-261/78-25 1-2 The inspector left the item unresolved at the exit meeting with the licensee committing to telephoning the Region II Office upon resolution of the eight hours training. The person responsible for the training and documentation of the training is no longer employed by the security contracto On October 23, 1978, W. Traylor contacted the Region II Office by phone and stated that the eight hours of training for the two guards in question was carried under on-the-job-training. After the initial classroom training new guards were assigned to work with an experienced guard for forty hour Documentation that the training in question was verified will be included in the guard's training recor This question is resolve The following payroll records were reviewed and it was verified that the licensee had the required number of armed responders for each shift indicate DATE SHIFT August 17, 1978 Evening, Night September 1, 2, 3, 4, 1978 Day, Evening, Night September 18, 1978 Day, Evening, Night Communications All guards and watchpersons observed by the inspector were capable of continuous communication with the Central Alarm Station (CAS). Equipment Procurement During the inspection, the inspector discussed with licensee management personnel, the procurement and installation schedule for security equipment required for full implementation of 10 CFR Part 7 All equipment has been ordere The majority of the equipment, as listed in Annex A of Revision 5 of the site security plan, is presently being installed and calibrate The licensee expects to meet the February 1979 deadlin.

Exit Interview At the conclusion of the inspection, an exit interview was conducted with licensee management representatives indicated in paragraph 1. The licensee was informed that there were no items of noncompliance.